The builder’s RERA record, explained

DWARKA PROJECT3

NAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD · P52100000163

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For DWARKA PROJECT3 (P52100000163), 293 of 480 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).

MahaRERA · per-home inventory · saved-file date 18 July 2026

For DWARKA PROJECT3, ₹4,647 per sq ft of carpet area is the median rate across 187 sold or booked entries with prices in the MahaRERA home list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.

MahaRERA · per-home inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹4,647/ sq ft carpet area

Across 187 sold or booked entries with reported prices. The middle 80% of rates fall between ₹4,190 and ₹5,355.

MahaRERA · per-home inventory · saved-file date 18 July 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar homes sell for?

Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

480 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
C41969501028.66–38.93 sq m≈ 308–419 sq ft
C42969204028.66–38.93 sq m≈ 308–419 sq ft
F114400144025.54–29.88 sq m≈ 275–322 sq ft
F214400144025.54–29.88 sq m≈ 275–322 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

480 listed entries

MahaRERA · per-home inventory · saved-file date 18 July 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
1C41136.65 sq m≈ 394 sq ftSold₹1,833,200
10C41336.33 sq m≈ 391 sq ftSold₹1,566,200
11C41338.93 sq m≈ 419 sq ftSold₹1,487,125
12C41336.65 sq m≈ 394 sq ftSold₹1,800,000
13C41436.65 sq m≈ 394 sq ftSold₹1,817,000
14C41436.33 sq m≈ 391 sq ftSold₹1,588,900
15C41438.93 sq m≈ 419 sq ftSold₹1,831,600
16C41436.65 sq m≈ 394 sq ftSold₹1,800,350
17C41536.65 sq m≈ 394 sq ftSold₹1,686,800
18C41536.33 sq m≈ 391 sq ftSold₹1,703,400
19C41538.93 sq m≈ 419 sq ftSold₹1,524,244
2C41136.33 sq m≈ 391 sq ftSold₹1,863,800

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹184,350,000 of an estimated ₹447,100,000 was reported as incurred (41.2%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 18 July 2026 · registration P52100000163

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
C41Excavation100.0%
C41Basement (if any)100.0%
C41Podiums (if any) 0.0%
C41Plinth100.0%
C41Stilt Floor 100.0%
C41Slabs of Super Structure100.0%
C41Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
C41Sanitary Fittings within the flats / premises100.0%
C41Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
C41External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
C41Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
C42Excavation100.0%
C42Basement (if any)100.0%
C42Podiums (if any) 0.0%
C42Plinth100.0%
C42Stilt Floor 100.0%
C42Slabs of Super Structure100.0%
C42Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
C42Sanitary Fittings within the flats / premises0.0%
C42Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
C42External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
C42Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
F1Excavation0.0%
F1Basement (if any)0.0%
F1Podiums (if any) 0.0%
F1Plinth0.0%
F1Stilt Floor 0.0%
F1Slabs of Super Structure0.0%
F1Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
F1Sanitary Fittings within the flats / premises0.0%
F1Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
F1External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
F1Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
F2Excavation0.0%
F2Basement (if any)0.0%
F2Podiums (if any) 0.0%
F2Plinth0.0%
F2Stilt Floor 0.0%
F2Slabs of Super Structure0.0%
F2Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
F2Sanitary Fittings within the flats / premises0.0%
F2Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
F2External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
F2Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
CLUB HOUSEExcavation100.0%
CLUB HOUSEBasement (if any)100.0%
CLUB HOUSEPodiums (if any) 0.0%
CLUB HOUSEPlinth100.0%
CLUB HOUSEStilt Floor 100.0%
CLUB HOUSESlabs of Super Structure100.0%
CLUB HOUSEInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
CLUB HOUSESanitary Fittings within the flats / premises100.0%
CLUB HOUSEStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
CLUB HOUSEExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
CLUB HOUSEInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%

MahaRERA project filing · read 18 July 2026 · registration P52100000163

Reported deadline extensions

Revised targetReason given by the builder
30 December 20201. It is experienced by the Promoter that there are number of challenges such as availing finance, slowdown in market in implementing and completing the Real Estate Projects. Since last 3-4 years Real Estate industry is experiencing significant recessionary trends, which resulted in a severe working capital finance crunch. We have been trying our level best to complete our projects on time. 2. The Promoter had availed project finance from Diwan Housing Finance Corporation Ltd (DHFL). However, the Promoter could not avail finance facility in smooth manner from the said DHFL. Subsequently, DHFL had assigned the loans disbursed by DHFL to the Promoter for the said project together with its right, title and interest to JM Financial asset reconstruction Company Ltd. However, due to financial crunches to the said financial institutions JM Financial is also not providing the financial facility to the said project. Due to lack of fund i.e. project finance the Promoter could not complete the project in time frame. 3. The Promoter inquired about establishment of “Special Window” (to provide priority debt financing) for Funding Stalled Affordable and Middle-Income Housing Project as per approval of Union Cabinet on 6th Nov 2018. Under the said scheme for the first SBICAP Ventures Limited AIF (Category II) has been engaged as Investment Manager and the fund is to provide relief to developers that require funding to complete a set of unfinished projects and ensure delivery of homes to the home-buyers. 4. Under the said scheme, our project fulfills all required criteria; therefore, our project is eligible to avail the finance from SBICAP Ventures Limited AIF. In order to avail the finance to complete the said project the Promoter is in process of making an application to SBICAP Ventures Limited AIF. Therefore, our humble request is to extend the date of completion by one year.
30 June 2022We have registered our Project DWARKA PROJECT 3 – P52100000163 under RERA. The completion date for the project is 30 TH JUNE 2021. But considering the COVID-19 situation, we are unable to complete our Project due to various reasons mentioned as under. As you are aware, due to lockdown announced by the Government of Maharashtra, the labours moved from site to their native places. Mostly the labours are from other States like UP, Bihar Orissa, Assam, Rajasthan etc. The labour strength on site reduced drastically. At the same time there is shortage of material. As some factories production reduced and they are unable to supply construction material on time. Transport from one State to other is also stopped/ delayed. Most of the Finishing Material ordered & stuck up due to production in factory’s like Tiles, windows, door shutter, CP Sanitary firefighting, Painting material etc. Local shops & transport are also closed due to lockdown & hence facing material shortage at site. With the Lockdown, Sales have completely stopped and we are struggling to collect receivables from customers too. As Banks are working in very limited timings and the customers are also finding stress in their jobs/ business situations. Considering the market real fact, here we are requesting RERA Authority to give us One Year Extension for this project. Our previous date of completion is 30-12-2020. EXTENDED BY THE RERA AUTHORITY TO 30-06-2021 DUE TO COVID-19. I hope, you will consider our Project & allows us for One Year Extension i.e. UPTO 30-06-2022.
30 December 2024To MahaRERA MUMBAI Subject : Application for the extension of “Dwarka” Project – 3 with reason P52100000163 in RERA. Dear Sir, We have registered our “Dwarka” Project -3 P52100000163 under RERA. The completion date for the said project was 30th Dec 2022. We have already applied for RERA Extension on date 29th Dec 2022. We submits that the said project consist of Bldg. C41:- Completed & Occupancy Certificate received, Bldg .C42 & Development:- Under Construction Phase , Bldg F1 & F2 :- Buildings Cancelled & No booking taken. We state that, in Building C41 consist of 96 Flats and sold out and possession were handed over. Building C42 consist of 96 flats and 34 flats sold, Building F1, F2 Cancelled & no bookings were taken & decided not to start execution. The C42 building is under construction phase. Club house and development work is under construction phase.We are requesting this extension due to the unforeseen cicumstances caused by the COVID -19 pandemic. The pandemic has had a significant impact on our Project in following ways:During Covid-19 lockdown , many of our site labours had returned to their hometown due to this pandemic. These labours are from other states like UP, Bihar, Rajasthan, Orissa, Assam, Etc. This has resulted in a shortage of labours on the site and caused delay in the project. Also there was shortage of materials & sudden price rise of Raw Materials like steel & Cement due to some factories have reduced their production which resulted into the shortage of construction material on site. The transport of construction materials from one state to other was also stopped/ delayed. Due to lockdown sales of units in the project had completely stopped. We are also faced difficulties in collecting receivables from customers. This has caused difficulty in continuing construction at the original pace. On account of delays, It has become difficult to obtain consent from the clients. Also many of the allottees were unreachable due to various circumstances of pandemic.Considering this slow market scenario and inflation we are requesting RERA authority to give us Extension for the said project. We have already completed the construction of the C41 building and anticipate the completion of the C42 building within the next year, by December 2024. Upon receiving the necessary extension, we will promptly complete project till december 2024.
30 December 2025Dear Sir/Madam, We, Naiknavare Housing Development Pvt. Ltd., respectfully submit this application for an extension of our project, Dwarka Project 3 (MahaRERA Registration No. P52100000163), under the provisions of the Real Estate (Regulation and Development) Act, 2016. The Dwarka Project 3 comprises four buildings: C41, C42, F1, F2 & Club House. Out of these, Building C41 has been successfully completed and handed over to the allottees. The Occupancy Certificate (OC) for Building C41 has already been uploaded to the MahaRERA portal. Building C42 is currently under construction and has achieved approximately 80% progress. However, Buildings F1 and F2 have not yet started, and no bookings were taken for these buildings. We are now in the process of completing Building C42 and require an extension to ensure its smooth and timely completion, followed by handing over possession to the allottees. To support this application, we have also uploaded the progress report of Building C42’s construction and attached the possession letters and consents in the prescribed Format B for your reference. Since the extension is pending, we are facing challenges in completing the building and handing it over to our allottees. Additionally, due to the pending extension process, we are also facing other challenges such as the stoppage of our registration of the agreement to sale, which has led to insecurity among allottees. Furthermore, bank disbursements have also been stopped, resulting in financial constraints that hinder the completion of the project. Therefore, we kindly request MahaRERA to grant us the extension to facilitate the timely and smooth completion of our project and the subsequent handover to our allottees. We remain fully committed to adhering to MahaRERA regulations and ensuring that the project is completed as per the required standards. Thank you for your understanding and support. Yours sincerely, Naiknavare Housing Development Pvt. Ltd.
30 June 2026Respected Sir/Madam, We, Naiknavare Housing Development Pvt. Ltd., being the Promoter of the project “Dwarka Project 3” bearing MahaRERA Registration No. P52100000163, respectfully submit that at the time of project registration, the Promoter had proposed development of multiple buildings namely Building C41, C42, F1, F2 and Clubhouse, which were included in the RERA registration; however, post the COVID-19 pandemic, due to unfavorable market conditions and project feasibility considerations, the Promoter decided to drop the development of Buildings F1 and F2, and accordingly the said buildings have been deleted from the latest sanctioned plans, which are also attached herewith along with this application; we confirm that no bookings, allotments, or sales have been carried out in respect of these buildings; further, we have obtained the Occupation Certificate for Building C41, C42 and Clubhouse, and since the Clubhouse is a common amenity not intended for sale, the Promoter now proposes to revise the project scope by deleting Buildings F1, F2 and Clubhouse from the registered project; to give effect to the above revision, the Promoter intends to file a Correction Application before MahaRERA, however, as the project registration period has lapsed, it is necessary to obtain an extension of registration up to date to enable filing of the said application; we hereby undertake that no third-party rights have been created in Buildings F1 and F2, the proposed correction shall not adversely affect any existing allottees, and the Correction Application will be filed within 7 days from the date of grant of extension; the possession letters and supporting documents are enclosed for your kind perusal; in view of the above, we humbly request your good office to kindly grant extension of the project registration up to date to enable us to proceed with filing of the correction application. Thanking You.

MahaRERA project filing · read 18 July 2026 · registration P52100000163

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹0₹117,620,082₹237,144,812₹354,764,894
Actual raised₹107,440,844₹0₹233,930,419₹341,371,263

MahaRERA project filing · read 18 July 2026 · registration P52100000163

Quarterly filing record

35 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 18 July 2026 · registration P52100000163

Documents named in the filing

  • Promoter PAN · 1 listed
  • Commencement certificate · 4 listed
  • Occupancy / completion certificate · 4 listed
  • Form 1 — Architect's certificate · 4 listed
  • Form 3 — CA certificate · 9 listed
  • Form 2 — Engineer's certificate · 4 listed
  • Title / search report · 1 listed
  • Form B — Promoter declaration · 4 listed
  • Sanctioned building plan · 14 listed
  • Sanctioned layout plan · 3 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 18 July 2026 · registration P52100000163

Builder and past records

What else does the record show?

Projects registered under this company

NAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD

3Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

Past records of sales and unsold homes

  1. 21 September 2026

    293 marked unsold · 187 sold · 0 booked.

    Saved MahaRERA home list

  2. 12 September 2026

    293 marked unsold · 187 sold · 0 booked.

    Saved MahaRERA home list

  3. 4 September 2026

    293 marked unsold · 187 sold · 0 booked.

    Saved MahaRERA home list

  4. 18 July 2026

    293 marked unsold · 187 sold · 0 booked.

    Saved MahaRERA home list

These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

More projects to explore

Other projects in this locality.

These projects list the same locality. They may differ in exact location, home type and price.

Project Comparison Report

Which project should you buy in?
And which home?

Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

Create my Comparison Report →

2 projects · ₹7,999
3 projects · ₹9,999

Within 1 working day

Didn’t help you decide? Full refund — no questions asked.

Compare project details for free →

Sources and dates.

MahaRERA · registration record · read 12 July 2026

MahaRERA · per-home inventory · saved-file date 18 July 2026

This is a past RERA home list, not current availability. It does not give the date each home was sold.

The home-list date is based on the saved file’s details.

Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

Open MahaRERA · search P52100000163 ↗