What does the RERA record show?

For Neuleaf Techd (P52100000181), 15 of 207 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).

MahaRERA · per-home inventory · saved-file date 18 July 2026

For Neuleaf Techd, ₹6,677 per sq ft of carpet area is the median rate across 120 sold or booked entries with prices in the MahaRERA home list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.

MahaRERA · per-home inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹6,677/ sq ft carpet area

Across 120 sold or booked entries with reported prices. The middle 80% of rates fall between ₹5,336 and ₹8,023.

MahaRERA · per-home inventory · saved-file date 18 July 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar homes sell for?

Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

207 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
A14008615.53–96.81 sq m≈ 167–1,042 sq ft
B504100972.95 sq m≈ 785 sq ft
C11274003852.06–98.76 sq m≈ 560–1,063 sq ft
D315071911.84–114.03 sq m≈ 127–1,227 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

207 listed entries

MahaRERA · per-home inventory · saved-file date 18 July 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
A-1A20270.9 sq m≈ 763 sq ftNot for saleNot stated
A-10A132.67 sq m≈ 352 sq ftMarked unsoldNot stated
A-11A115.53 sq m≈ 167 sq ftMarked unsoldNot stated
A-12A127.56 sq m≈ 297 sq ftMarked unsoldNot stated
A-13A127.56 sq m≈ 297 sq ftMarked unsoldNot stated
A-14A130.32 sq m≈ 326 sq ftMarked unsoldNot stated
A-2A20272.94 sq m≈ 785 sq ftNot for saleNot stated
A-3A20296.81 sq m≈ 1,042 sq ftNot for saleNot stated
A-4A20235.88 sq m≈ 386 sq ftNot for saleNot stated
A-5A20232.67 sq m≈ 352 sq ftMarked unsoldNot stated
A-6A20231.19 sq m≈ 336 sq ftMarked unsoldNot stated
A-7A20231.21 sq m≈ 336 sq ftNot for saleNot stated

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹458,219,259 of an estimated ₹690,776,416 was reported as incurred (66.3%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 18 July 2026 · registration P52100000181

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
CExcavation100.0%
CBasement (if any)100.0%
CPodiums (if any) 100.0%
CPlinth100.0%
CStilt Floor 0.0%
CSlabs of Super Structure100.0%
CInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
CSanitary Fittings within the flats / premises100.0%
CStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
CExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
CInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BExcavation100.0%
BBasement (if any)100.0%
BPodiums (if any) 0.0%
BPlinth100.0%
BStilt Floor 0.0%
BSlabs of Super Structure80.0%
BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50.0%
BSanitary Fittings within the flats / premises5.0%
BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5.0%
BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15.0%
BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
AExcavation50.0%
ABasement (if any)0.0%
APodiums (if any) 0.0%
APlinth0.0%
AStilt Floor 0.0%
ASlabs of Super Structure0.0%
AInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
ASanitary Fittings within the flats / premises0.0%
AStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
AExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
AInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
DExcavation100.0%
DBasement (if any)100.0%
DPodiums (if any) 100.0%
DPlinth0.0%
DStilt Floor 0.0%
DSlabs of Super Structure70.0%
DInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20.0%
DSanitary Fittings within the flats / premises20.0%
DStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70.0%
DExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10.0%
DInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 18 July 2026 · registration P52100000181

Reported deadline extensions

Revised targetReason given by the builder
31 December 2023The reasons for extension in date of completion are as follows:- 1. The promoter was suffering through huge financial losses as there was no abundant booking done by customers. Due to such financial constrained there was slow progress as work site. 2. Further, It is a fact that there was nationwide lockdown due to Covid-19 pandemic situation. Due to such pandemic situation, promoter could not progress the work at site. 3. Due to such situation there were further financial constraints on the Promoter. There have been bookings in the said project. However, Promoter seeks extension of date of completion in order to successfully complete the project as per law. 4. Promoter is also filing the requisite format of consent from Allottees along with the present application. 5. Therefore, Promoter humbly prays that:- a. Project Registration be extended till 31/12/2023 on the grounds state as above; b. Any other just and equitable relief be granted in the larger interest of Allottees and Promoter.
30 June 2033In accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 68% allottees for purpose of extension of RERA registration period of the said project.

MahaRERA project filing · read 18 July 2026 · registration P52100000181

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹200,000,000₹300,000,000₹493,373,878₹1,043,373,878
Actual raised₹47,443,473₹8,557,507₹683,151,121₹739,779,525

MahaRERA project filing · read 18 July 2026 · registration P52100000181

Quarterly filing record

49 elapsed quarterly periods in the captured compliance schedule. Active default was recorded for FY 2025-2026.

MahaRERA project filing · read 18 July 2026 · registration P52100000181

Documents named in the filing

  • Promoter PAN · 1 listed
  • Form 1 — Architect's certificate · 2 listed
  • Form 3 — CA certificate · 7 listed
  • Form 2 — Engineer's certificate · 4 listed
  • Title / search report · 3 listed
  • Form B — Promoter declaration · 5 listed
  • Sanctioned layout plan · 12 listed
  • Sanctioned building plan · 13 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 18 July 2026 · registration P52100000181

Builder and past records

What else does the record show?

Projects registered under this company

Neuleaf Lifespace Developers LLP

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

    Past records of sales and unsold homes

    1. 21 September 2026

      15 marked unsold · 120 sold · 0 booked.

      Saved MahaRERA home list

    2. 12 September 2026

      15 marked unsold · 120 sold · 0 booked.

      Saved MahaRERA home list

    3. 4 September 2026

      15 marked unsold · 120 sold · 0 booked.

      Saved MahaRERA home list

    4. 18 July 2026

      15 marked unsold · 120 sold · 0 booked.

      Saved MahaRERA home list

    These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

    More projects to explore

    Other projects in this locality.

    These projects list the same locality. They may differ in exact location, home type and price.

    Project Comparison Report

    Which project should you buy in?
    And which home?

    Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 12 July 2026

    MahaRERA · per-home inventory · saved-file date 18 July 2026

    This is a past RERA home list, not current availability. It does not give the date each home was sold.

    The home-list date is based on the saved file’s details.

    Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.