For Adhya Radha Krishna (P52100001891), 21 of 359 entries were marked unsold in the MahaRERA unit list dated 18 July 2026 (saved-file date).

MahaRERA · per-unit inventory · saved-file date 18 July 2026

For Adhya Radha Krishna, ₹7,160 per sq ft of filed area is the median rate across 296 sold or booked entries with prices in the MahaRERA unit list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.

MahaRERA · per-unit inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find units to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular unit

See its advantages, drawbacks and how it compares with other units in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended units in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹7,160/ sq ft filed area

Across 296 sold or booked entries with reported prices. The middle 80% of rates fall between ₹5,942 and ₹8,083.

MahaRERA · per-unit inventory · saved-file date 18 July 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its filed area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold units and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar units sell for?

Compare filed values by building, unit-number pattern and area. See which units were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

359 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-unit inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and filed areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded filed-area range
A7055011436.63–49.50 sq m≈ 394–533 sq ft
B908200830.60–37.05 sq m≈ 329–399 sq ft
D776404936.55–64.70 sq m≈ 393–696 sq ft
E122950161110.48–69.58 sq m≈ 113–749 sq ft

Area means carpet area for building units and plot area for plots. Size alone does not establish use or layout. How we read and summarise the filing →

Unit Report

Is this the right
unit for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar units and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your unit in the RERA list.

The same unit number may appear in more than one building. Check both before choosing.

359 listed entries

MahaRERA · per-unit inventory · saved-file date 18 July 2026

RERA unit list, not current availability
Unit / buildingFloor in the recordFiled areaReported statusAgreement valueAssess
1001A / Wing NA1036.63 sq m≈ 394 sq ft · RERA carpet areaSold₹3,757,500
1002A / Wing NA1036.63 sq m≈ 394 sq ft · RERA carpet areaSold₹3,000,000
1003A / Wing NA1039.47 sq m≈ 425 sq ft · RERA carpet areaNot for saleNot stated
1004A / Wing NA1039.53 sq m≈ 425 sq ft · RERA carpet areaSold₹3,320,000
1005A / Wing NA1039.9 sq m≈ 429 sq ft · RERA carpet areaSold₹3,621,000
1006A / Wing NA1039.9 sq m≈ 429 sq ft · RERA carpet areaSold₹3,438,450
101A / Wing NA145.25 sq m≈ 487 sq ft · RERA carpet areaNot for saleNot stated
102A / Wing NA145.25 sq m≈ 487 sq ft · RERA carpet areaNot for saleNot stated
103A / Wing NA142.0 sq m≈ 452 sq ft · RERA carpet areaNot for saleNot stated
104A / Wing NA142.0 sq m≈ 452 sq ft · RERA carpet areaNot for saleNot stated
105A / Wing NA149.5 sq m≈ 533 sq ft · RERA carpet areaNot for saleNot stated
106A / Wing NA149.5 sq m≈ 533 sq ft · RERA carpet areaSold₹4,311,000

Read every entry in one table: Read the complete saved unit list.

Choose the unit you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹740,581,922 of an estimated ₹770,000,000 was reported as incurred (96.2%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 18 July 2026 · registration P52100001891

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
AExcavation100.0%
ABasement (if any)100.0%
APodiums (if any) 100.0%
APlinth100.0%
AStilt Floor 100.0%
ASlabs of Super Structure100.0%
AInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
ASanitary Fittings within the flats / premises100.0%
AStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
AExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
AInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BExcavation100.0%
BBasement (if any)100.0%
BPodiums (if any) 100.0%
BPlinth100.0%
BStilt Floor 100.0%
BSlabs of Super Structure100.0%
BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BSanitary Fittings within the flats / premises100.0%
BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
-Excavation0.0%
-Basement (if any)0.0%
-Podiums (if any) 0.0%
-Plinth0.0%
-Stilt Floor 0.0%
-Slabs of Super Structure0.0%
-Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
-Sanitary Fittings within the flats / premises0.0%
-Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
-External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
-Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
DExcavation100.0%
DBasement (if any)100.0%
DPodiums (if any) 0.0%
DPlinth100.0%
DStilt Floor 100.0%
DSlabs of Super Structure100.0%
DInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
DSanitary Fittings within the flats / premises0.0%
DStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
DExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
DInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
EExcavation100.0%
EBasement (if any)100.0%
EPodiums (if any) 0.0%
EPlinth100.0%
EStilt Floor 100.0%
ESlabs of Super Structure100.0%
EInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
ESanitary Fittings within the flats / premises0.0%
EStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
EExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90.0%
EInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50.0%

MahaRERA project filing · read 18 July 2026 · registration P52100001891

Reported deadline extensions

Revised targetReason given by the builder
31 March 2027There are 5 buildings in layout. Out of 5 buildings, Building A & B are completed and handed over to Allottees. We have taken separate RERA number for Building C and Construction of building D & E as per revised sanctioned plans not yet started

MahaRERA project filing · read 18 July 2026 · registration P52100001891

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹0₹0₹1,083,285,000₹1,083,285,000
Actual raised₹25,245,869₹0₹857,639,652₹882,885,521

MahaRERA project filing · read 18 July 2026 · registration P52100001891

Quarterly filing record

35 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 18 July 2026 · registration P52100001891

Documents named in the filing

  • Promoter PAN · 1 listed
  • Commencement certificate · 2 listed
  • Form 1 — Architect's certificate · 4 listed
  • Form 3 — CA certificate · 4 listed
  • Form 2 — Engineer's certificate · 3 listed
  • Form B — Promoter declaration · 2 listed
  • Title / search report · 1 listed
  • Sanctioned layout plan · 4 listed
  • Sanctioned building plan · 26 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 18 July 2026 · registration P52100001891

Builder and past records

What else does the record show?

Projects registered under this company

ADHYA PROPERTIES

3Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

Past records of sales and unsold units

  1. 30 September 2026

    21 marked unsold · 296 sold · 0 booked.

    Saved MahaRERA unit list

  2. 21 September 2026

    21 marked unsold · 296 sold · 0 booked.

    Saved MahaRERA unit list

  3. 12 September 2026

    21 marked unsold · 296 sold · 0 booked.

    Saved MahaRERA unit list

  4. 4 September 2026

    21 marked unsold · 296 sold · 0 booked.

    Saved MahaRERA unit list

These dates show when the records were saved, not when units were sold. Sales may have changed since then, even if the saved counts are the same.

Project Comparison Report

Which project should you buy in?
And which unit?

Compare up to three projects. We read their plans and RERA documents, recommend units in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

Create my Comparison Report →

2 projects · ₹7,999
3 projects · ₹9,999

Within 1 working day

Didn’t help you decide? Full refund — no questions asked.

Compare project details for free →

Sources and dates.

MahaRERA · registration record · read 12 July 2026

MahaRERA · per-unit inventory · saved-file date 18 July 2026

This is a past RERA unit list, not current availability. It does not give the date each unit was sold.

The unit-list date is based on the saved file’s details.

Filed area means carpet area for building units and plot area for plots. Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

Open MahaRERA · search P52100001891 ↗
homeonpaper