What does the RERA record show?

For Ivory Tathastu (P52100002274), 4 of 127 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).

MahaRERA · per-home inventory · saved-file date 18 July 2026

For Ivory Tathastu, ₹5,236 per sq ft of carpet area is the median rate across 123 sold or booked entries with prices in the MahaRERA home list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.

MahaRERA · per-home inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹5,236/ sq ft carpet area

Across 123 sold or booked entries with reported prices. The middle 80% of rates fall between ₹4,764 and ₹10,681.

MahaRERA · per-home inventory · saved-file date 18 July 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar homes sell for?

Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

127 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
A Building383503020.93–52.71 sq m≈ 225–567 sq ft
B Building89880109.97–45.60 sq m≈ 107–491 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

127 listed entries

MahaRERA · per-home inventory · saved-file date 18 July 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
1A Building20521.02 sq m≈ 226 sq ftSold₹2,416,170
101A Building152.71 sq m≈ 567 sq ftSold₹2,758,750
102A Building152.14 sq m≈ 561 sq ftSold₹3,027,500
103A Building152.26 sq m≈ 563 sq ftSold₹2,937,321
104A Building152.26 sq m≈ 563 sq ftSold₹3,207,027
2A Building20521.9 sq m≈ 236 sq ftSold₹2,517,726
201A Building252.26 sq m≈ 563 sq ftSold₹2,758,948
202A Building252.14 sq m≈ 561 sq ftSold₹2,706,071
203A Building252.22 sq m≈ 562 sq ftSold₹2,607,290
204A Building252.61 sq m≈ 566 sq ftSold₹2,803,393
3A Building20529.47 sq m≈ 317 sq ftSold₹3,394,438
301A Building352.26 sq m≈ 563 sq ftSold₹2,758,750

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹131,909,511 of an estimated ₹138,435,486 was reported as incurred (95.3%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 18 July 2026 · registration P52100002274

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
A BuildingExcavation100.0%
A BuildingBasement (if any)0.0%
A BuildingPodiums (if any) 0.0%
A BuildingPlinth100.0%
A BuildingStilt Floor 0.0%
A BuildingSlabs of Super Structure100.0%
A BuildingInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
A BuildingSanitary Fittings within the flats / premises90.0%
A BuildingStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
A BuildingExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90.0%
A BuildingInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
B BuildingExcavation100.0%
B BuildingBasement (if any)0.0%
B BuildingPodiums (if any) 0.0%
B BuildingPlinth0.0%
B BuildingStilt Floor 0.0%
B BuildingSlabs of Super Structure100.0%
B BuildingInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
B BuildingSanitary Fittings within the flats / premises100.0%
B BuildingStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
B BuildingExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
B BuildingInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%

MahaRERA project filing · read 18 July 2026 · registration P52100002274

Reported deadline extensions

Revised targetReason given by the builder
30 June 2022We have registered our project “Ivory Tathastu” as on 31/07/2017. At the time of registration we had given expected date of project completion as 31/12/2020, also we got covid extention to 30/06/21. However we won’t be able to obtain completion certificate till that date due to some legal formalities that are taking some time. We request you to grant us the extension of 1 years (i.e. upto 30/06/2022) so that we may complete our project and obtain Completion Certificate.
30 December 2023There were some delays happened in completion of the project but it was due to ups and downsfor the Indian Real Estate Sector due to corona pandemic. There was liquidity crisis in the market and slowdown in sales since the banks had stricter norms for financing the allottees. Due to which the builder also faced huge losses and interest burden on his borrowings.
31 December 2026At the time of previous extension, we had given expected date of project completion as 30.12.2023. However we won’t be able to obtain completion certificate till that date due to some legal formalities that are taking some time, we request you to grant us the extension upto 31.12.2026 so that we may complete our project and obtain Completion Certificate.

MahaRERA project filing · read 18 July 2026 · registration P52100002274

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹204,617,304₹0₹0₹204,617,304
Actual raised₹0₹0₹197,838,492₹197,838,492

MahaRERA project filing · read 18 July 2026 · registration P52100002274

Quarterly filing record

35 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 18 July 2026 · registration P52100002274

Documents named in the filing

  • Promoter PAN · 1 listed
  • Commencement certificate · 8 listed
  • Form 1 — Architect's certificate · 5 listed
  • Form 3 — CA certificate · 5 listed
  • Form 2 — Engineer's certificate · 4 listed
  • Title / search report · 1 listed
  • Form B — Promoter declaration · 2 listed
  • Sanctioned layout plan · 5 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 18 July 2026 · registration P52100002274

Builder and past records

What else does the record show?

Projects registered under this company

Ivory Lifespace LLP

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

    Past records of sales and unsold homes

    1. 21 September 2026

      4 marked unsold · 123 sold · 0 booked.

      Saved MahaRERA home list

    2. 13 September 2026

      4 marked unsold · 123 sold · 0 booked.

      Saved MahaRERA home list

    3. 4 September 2026

      4 marked unsold · 123 sold · 0 booked.

      Saved MahaRERA home list

    4. 18 July 2026

      4 marked unsold · 123 sold · 0 booked.

      Saved MahaRERA home list

    These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

    More projects to explore

    Other projects in this locality.

    These projects list the same locality. They may differ in exact location, home type and price.

    Project Comparison Report

    Which project should you buy in?
    And which home?

    Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 12 July 2026

    MahaRERA · per-home inventory · saved-file date 18 July 2026

    This is a past RERA home list, not current availability. It does not give the date each home was sold.

    The home-list date is based on the saved file’s details.

    Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

    Open MahaRERA · search P52100002274 ↗