The builder’s RERA record, explained
Sai Proviso Homes · P52100002395
For Leisure Town Phase 1 (P52100002395), 39 of 560 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).
MahaRERA · per-home inventory · saved-file date 18 July 2026
For Leisure Town Phase 1, ₹9,931 per sq ft of carpet area is the median rate across 521 sold or booked entries with prices in the MahaRERA home list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.
MahaRERA · per-home inventory · saved-file date 18 July 2026
These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.
Builder’s completion target
The builder reported this target date. It is not a confirmed handover date.
Status shown on RERA
This is the status shown on RERA. It does not confirm an occupancy certificate or today’s construction progress.
Prices reported to RERA
₹9,931/ sq ft carpet area
Across 521 sold or booked entries with reported prices. The middle 80% of rates fall between ₹8,191 and ₹11,056.
MahaRERA · per-home inventory · saved-file date 18 July 2026
For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.
Sales Report
Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.
Inside this registered phase
560 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.
MahaRERA · per-home inventory · saved-file date 18 July 2026
Scroll sideways to see all columns.
| Filed building | Entries | Sold | Booked | Marked unsold | Other / unstated status | Recorded carpet-area range |
|---|---|---|---|---|---|---|
| A1 | 87 | 87 | 0 | 0 | 0 | 51.28–71.45 sq m≈ 552–769 sq ft |
| B1 | 87 | 87 | 0 | 0 | 0 | 48.80–50.70 sq m≈ 525–546 sq ft |
| B3 | 87 | 87 | 0 | 0 | 0 | 48.80–50.70 sq m≈ 525–546 sq ft |
| C1 | 126 | 87 | 0 | 39 | 0 | 47.90–52.61 sq m≈ 516–566 sq ft |
| D3 | 86 | 86 | 0 | 0 | 0 | 29.41 sq m≈ 317 sq ft |
| J1 | 87 | 85 | 2 | 0 | 0 | 49.94–66.33 sq m≈ 538–714 sq ft |
Different sizes are not necessarily different bedroom types. How we read and summarise the filing →
Unit Report
Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.
Didn’t help you decide? Full refund — no questions asked.
The same home number may appear in more than one building. Check both before choosing.
MahaRERA · per-home inventory · saved-file date 18 July 2026
| Home / building | Floor in the record | Carpet area | Reported status | Agreement value | Assess |
|---|---|---|---|---|---|
| 1001A1 | 10 | 51.28 sq m≈ 552 sq ft | Sold | ₹5,500,000 | |
| 1002A1 | 10 | 51.28 sq m≈ 552 sq ft | Sold | ₹4,205,000 | |
| 1003A1 | 10 | 71.45 sq m≈ 769 sq ft | Sold | ₹7,800,905 | |
| 1004A1 | 10 | 71.45 sq m≈ 769 sq ft | Sold | ₹7,408,800 | |
| 1005A1 | 10 | 51.28 sq m≈ 552 sq ft | Sold | ₹4,500,000 | |
| 1006A1 | 10 | 51.28 sq m≈ 552 sq ft | Sold | ₹4,500,000 | |
| 1007A1 | 10 | 71.45 sq m≈ 769 sq ft | Sold | ₹7,642,400 | |
| 1008A1 | 10 | 71.45 sq m≈ 769 sq ft | Sold | ₹7,313,250 | |
| 101A1 | 1 | 51.44 sq m≈ 554 sq ft | Sold | ₹3,925,000 | |
| 102A1 | 1 | 51.44 sq m≈ 554 sq ft | Sold | ₹3,425,000 | |
| 103A1 | 1 | 71.17 sq m≈ 766 sq ft | Sold | ₹6,850,678 | |
| 104A1 | 1 | 71.17 sq m≈ 766 sq ft | Sold | ₹7,244,748 |
Read every entry in one table: Read the complete saved home list.
Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.
More from the RERA documents
₹1,308,584,512 of an estimated ₹1,536,915,488 was reported as incurred (85.1%). This percentage is about costs. It does not show how much construction is complete.
MahaRERA project filing · read 18 July 2026 · registration P52100002395
Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.
| Building | Activity | Reported |
|---|---|---|
| A1 | Excavation | 100.0% |
| A1 | Basement (if any) | 100.0% |
| A1 | Podiums (if any) | 0.0% |
| A1 | Plinth | 100.0% |
| A1 | Stilt Floor | 100.0% |
| A1 | Slabs of Super Structure | 100.0% |
| A1 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90.0% |
| A1 | Sanitary Fittings within the flats / premises | 100.0% |
| A1 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| A1 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| A1 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| D3 | Excavation | 100.0% |
| D3 | Basement (if any) | 100.0% |
| D3 | Podiums (if any) | 0.0% |
| D3 | Plinth | 100.0% |
| D3 | Stilt Floor | 100.0% |
| D3 | Slabs of Super Structure | 100.0% |
| D3 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90.0% |
| D3 | Sanitary Fittings within the flats / premises | 100.0% |
| D3 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| D3 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| D3 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| B1 | Excavation | 100.0% |
| B1 | Basement (if any) | 100.0% |
| B1 | Podiums (if any) | 0.0% |
| B1 | Plinth | 100.0% |
| B1 | Stilt Floor | 100.0% |
| B1 | Slabs of Super Structure | 100.0% |
| B1 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90.0% |
| B1 | Sanitary Fittings within the flats / premises | 100.0% |
| B1 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| B1 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| B1 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| B3 | Excavation | 100.0% |
| B3 | Basement (if any) | 100.0% |
| B3 | Podiums (if any) | 0.0% |
| B3 | Plinth | 100.0% |
| B3 | Stilt Floor | 100.0% |
| B3 | Slabs of Super Structure | 90.0% |
| B3 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| B3 | Sanitary Fittings within the flats / premises | 100.0% |
| B3 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| B3 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| B3 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| J1 | Excavation | 100.0% |
| J1 | Basement (if any) | 100.0% |
| J1 | Podiums (if any) | 0.0% |
| J1 | Plinth | 100.0% |
| J1 | Stilt Floor | 100.0% |
| J1 | Slabs of Super Structure | 100.0% |
| J1 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90.0% |
| J1 | Sanitary Fittings within the flats / premises | 0.0% |
| J1 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| J1 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50.0% |
| J1 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| C1 | Excavation | 100.0% |
| C1 | Basement (if any) | 100.0% |
| C1 | Podiums (if any) | 0.0% |
| C1 | Plinth | 100.0% |
| C1 | Stilt Floor | 100.0% |
| C1 | Slabs of Super Structure | 92.0% |
| C1 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 5.0% |
| C1 | Sanitary Fittings within the flats / premises | 0.0% |
| C1 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90.0% |
| C1 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| C1 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
MahaRERA project filing · read 18 July 2026 · registration P52100002395
| Revised target | Reason given by the builder |
|---|---|
| 30 December 2023 | I, Sanjay Motilal Gawande, partner of M/S. SAI PROVISO HOMES, having its office address at 1201/1301, Bhumiraj Costarica, Palm Beach Road, Plot No. 1 & 2, Sec- 18, Sanpada, Navi Mumbai- 400 705 do hereby solemnly declares as under:- 1. That we are the Promoter of the proposed project of namely “Leisure Town Phase I” comprising of six (6) building to be constructed on Survey no. 202/A, 202/B/1/1 to 7, 202/B/2, 202/B/3, 202/B/4 of village-Hadapsar, Taluka- Haveli, Pune- 411028 and duly registered with MahaRERA under registration no. P52000002395. 2. That the proposed completion date of completion of the said Project is mentioned in MahaRERA is 30.12.2022. That, in accordance with the permission we have completed the construction of five (5) building out of the six (6) buildings and have obtained from the competent authorities (i) occupancy certificate for four (4) buildings i.e. A1, B1, B3 and D3, (ii) obtained architect completion certificate for building J1 and have submitted application for occupancy certificate. While construction of sixth building C1 is completed upto fourth floor. 3. That due to pandemic, the competent authorities delayed in granting approvals due to lockdown as a result of which, the construction work of building no. C1 is delayed. 4. That as per section 6 of the Real Estate (Regulation and Development) Act, 2016 we are hereby seeking extension of 1 (one) year i.e. upto 30.12.2023 for completing construction of building no. C1. This extension, if granted, will aid the Promoter towards completing the project and obtaining OC of building no. C1 before 30.12.2023. 5. We have already obtained the consent of 43 Allottees in the building out of 55 booking holders which is being uploaded separately. |
| 31 December 2024 | I, Sanjay Motilal Gawande, Partner of M/s. SAI PROVISO HOMES, having its office address at 1201/1301, Bhumiraj Costarica, Palm Beach Road, Plot No. 1 & 2, Sector 18, Sanpada, Navi Mumbai – 400 705 do hereby solemnly declares as under:- 1. The Promoter has proposed project namely “Leisure Town Phase I” duly registered with MahaRERA under registration no.P52000002395 comprising of six (6) residential buildings A-1, B-1, B-3, C-1, D-3 and J-1 on Survey No.202/A, 202/B/1/1 to 7, 202/B/2, 202/B/3 situated at Village Hadapsar, Taluka Haveli, Pune – 411028. 2. The Promoter has obtained part occupancy certificate from Pune Municipal Corporation for the said Project i.e., for completing the construction of five (5) buildings out of six (6) buildings and have handed over possession purchasers therein and have formed separate co-operative housing societies for each building. The Promoter has obtained occupancy certificate each building in the following manner: Building no. Floors Date of OC A-1 G + 11 upper floors 18/08/2018 D-3 G + 11 upper floors 18/08/2018 B-1 G + 11 upper floors 08/12/2020 B-3 G + 11 upper floors 17/03/2021 J-1 G + 11 upper floors 06/03/2023 3. As per sanctioned plan and commencement certificate, the Promoter has completed Building C-1 upto 09th floor out of eleven (11) habitable floors. The Promoter is entitled to construct additional five (5) habitable floors (“Additional Floors”) on the sanctioned eleven (11) habitable floors of the building C-1 by utilizing FSI available under Unified Development Control Promotion and Regulation for Maharashtra, 2020 (“UDCPR”). Further, the Promoter will obtain required permissions, sanctions and approvals from competent authorities for constructing said Additional Floors and upload same on the MahaRERA portal. 4. Accordingly, the Promoter has obtained consent from 68 number of allottees out of 87 allottees for constructing the additional floors and completing construction of said C-1 Building by December, 2024. These consents are uploaded separately on the RERA portal. 5. Out of total 521 flats, 432 have been given possession, and 66 have consented for extension, thereby making total consent taken from 498 allottees. 6. Therefore, the Promoter has made application for extension of registration of building C-1 upto December, 2024 to complete construction of the said building C-1 by obtaining required permission from the competent authority. |
| 31 December 2026 | I, hereby apply for extension as per Order No. 40 Dated 27/12/2022 of the registered project bearing vide no P52100002395.As per HEARING DATED 25th June 2025, Hon'ble Shri Manoj Saunik Sir granted Extension upto 31/12/2026. The order is uploaded in Other Tab for your reference |
MahaRERA project filing · read 18 July 2026 · registration P52100002395
RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.
| Filing | Own funds | Borrowing | Payments from buyers | Total |
|---|---|---|---|---|
| Estimated plan | ₹80,000,000 | ₹270,000,000 | ₹2,513,628,452 | ₹2,863,628,452 |
| Actual raised | ₹285,104,938 | ₹307,876,233 | ₹2,569,906,914 | ₹3,162,888,085 |
MahaRERA project filing · read 18 July 2026 · registration P52100002395
35 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.
MahaRERA project filing · read 18 July 2026 · registration P52100002395
A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.
MahaRERA project filing · read 18 July 2026 · registration P52100002395
Builder and past records
Projects registered under this company
2Pune registrations
These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.
MahaRERA Pune registration records · read 12 July 2026
Past records of sales and unsold homes
21 September 2026
39 marked unsold · 519 sold · 2 booked.
Saved MahaRERA home list
13 September 2026
39 marked unsold · 519 sold · 2 booked.
Saved MahaRERA home list
4 September 2026
39 marked unsold · 519 sold · 2 booked.
Saved MahaRERA home list
18 July 2026
39 marked unsold · 519 sold · 2 booked.
Saved MahaRERA home list
These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.
More projects to explore
These projects list the same locality. They may differ in exact location, home type and price.
Hadapsar · Pune
P52100030903
35 of 285 entries marked unsold
MahaRERA · per-home inventory · read 9 September 2026
View project details →Hadapsar · Pune
P52100077459
69 of 191 entries marked unsold
MahaRERA · per-home inventory · saved-file date 18 July 2026
View project details →Hadapsar · Pune
PM1261012502015
192 of 209 entries marked unsold
MahaRERA · per-home inventory · read 4 September 2026
View project details →Project Comparison Report
Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.
2 projects · ₹7,999
3 projects · ₹9,999
Within 1 working day
Didn’t help you decide? Full refund — no questions asked.
Compare project details for free →MahaRERA · registration record · read 12 July 2026
MahaRERA · per-home inventory · saved-file date 18 July 2026
This is a past RERA home list, not current availability. It does not give the date each home was sold.
The home-list date is based on the saved file’s details.
Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.