homeonpaper.

Builder’s RERA records,
explained for buyers.

The builder’s RERA record, explained

River Dale Residency

Maha Anand Pinnac Associates · P52100004952

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For River Dale Residency (P52100004952), 4 of 202 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).

MahaRERA · per-home inventory · saved-file date 18 July 2026

For River Dale Residency, ₹13,438 per sq ft of carpet area is the median rate across 147 sold or booked entries with prices in the MahaRERA home list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.

MahaRERA · per-home inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹13,438/ sq ft carpet area

Across 147 sold or booked entries with reported prices. The middle 80% of rates fall between ₹4,525 and ₹16,349.

MahaRERA · per-home inventory · saved-file date 18 July 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar homes sell for?

Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

202 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
Wing A7950012869.84–99.93 sq m≈ 752–1,076 sq ft
Wing B383101658.73–82.57 sq m≈ 632–889 sq ft
Wing C6345011789.83–136.02 sq m≈ 967–1,464 sq ft
Wing D222101043.02 sq m≈ 463 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

202 listed entries

MahaRERA · per-home inventory · saved-file date 18 July 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
1001Wing A1086.05 sq m≈ 926 sq ftSold₹15,143,000
1002Wing A1086.05 sq m≈ 926 sq ftSold₹11,600,000
1003Wing A1086.05 sq m≈ 926 sq ftSold₹11,000,000
1004Wing A1069.84 sq m≈ 752 sq ftNot for saleNot stated
1005Wing A1086.05 sq m≈ 926 sq ftSold₹14,526,800
101Wing A186.05 sq m≈ 926 sq ftSold₹15,107,000
102Wing A199.93 sq m≈ 1,076 sq ftSold₹14,600,000
103Wing A186.05 sq m≈ 926 sq ftNot for saleNot stated
104Wing A169.84 sq m≈ 752 sq ftSold₹12,473,100
105Wing A191.71 sq m≈ 987 sq ftSold₹12,035,000
1101Wing A1186.05 sq m≈ 926 sq ftSold₹14,000,000
1102Wing A1186.05 sq m≈ 926 sq ftSold₹11,500,000

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹752,299,382 of an estimated ₹865,000,659 was reported as incurred (87.0%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 18 July 2026 · registration P52100004952

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
Wing AExcavation100.0%
Wing ABasement (if any)100.0%
Wing APodiums (if any) 100.0%
Wing APlinth100.0%
Wing AStilt Floor 100.0%
Wing ASlabs of Super Structure100.0%
Wing AInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98.5%
Wing ASanitary Fittings within the flats / premises97.5%
Wing AStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Wing AExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99.0%
Wing AInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
Wing DExcavation100.0%
Wing DBasement (if any)100.0%
Wing DPodiums (if any) 0.0%
Wing DPlinth100.0%
Wing DStilt Floor 0.0%
Wing DSlabs of Super Structure100.0%
Wing DInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
Wing DSanitary Fittings within the flats / premises100.0%
Wing DStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Wing DExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
Wing DInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
Wing BExcavation100.0%
Wing BBasement (if any)100.0%
Wing BPodiums (if any) 100.0%
Wing BPlinth100.0%
Wing BStilt Floor 100.0%
Wing BSlabs of Super Structure100.0%
Wing BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
Wing BSanitary Fittings within the flats / premises100.0%
Wing BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Wing BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
Wing BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
Wing CExcavation100.0%
Wing CBasement (if any)100.0%
Wing CPodiums (if any) 100.0%
Wing CPlinth100.0%
Wing CStilt Floor 100.0%
Wing CSlabs of Super Structure100.0%
Wing CInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98.0%
Wing CSanitary Fittings within the flats / premises98.0%
Wing CStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Wing CExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99.95%
Wing CInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
Wing EExcavation100.0%
Wing EBasement (if any)75.0%
Wing EPodiums (if any) 0.0%
Wing EPlinth0.0%
Wing EStilt Floor 0.0%
Wing ESlabs of Super Structure0.0%
Wing EInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Wing ESanitary Fittings within the flats / premises0.0%
Wing EStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Wing EExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Wing EInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 18 July 2026 · registration P52100004952

Reported deadline extensions

Revised targetReason given by the builder
31 December 2023The delay has been caused due to a) Due to delay in receipt of Aviation NOC. The application for Aviation NOC was made on the basis of the circular issued by the Ministry of Defence dated 11.04.2018 and Aviation NOC was received on 28.11.2019 b) Due to present COVID 19 Pandemic c) Due to shortage of migrant labour and d) Due to change in management structure
30 September 2024The project is getting completed and we are filing for Occupancy Certificate hence require Extension
30 December 2024The project is 95% completed and development work is in process. We have also applied for completion certificate, however we are not sure we will receive in time and need extension.
30 April 2025Dear Sir/Madam, We are pleased to inform you that our project name “River Dale Residency”, Karvenagar, Pune – 411052, is almost complete and we have received Part Completion for the project from the Pune Municipal Corporation vide No. OCC/0994/24 dated 22.11.2024 (A copy of the same is uploaded on the MahaRERA website). The balance construction activities are almost complete and we have applied for the Completion Certificate for the balance flats to the Pune Municipal Corporation. We also agree to do the quarterly compliance as and when required. Therefore, we request an extension for obtaining the Completion Certificate. Request you to grant the extension as soon as possible.
31 August 2025The said project is almost completed and we have received part completion for the project from Pune Municipal Corporation vide no. OCC/0994/24 dated 22/11/2024 and OCC/1088/24 dated 24/12/2024. Out of 227 flats we have received Occupancy Certificate for 216 flats. Whereas remaining 11 flats are pending due to the the owner's Architect / interior designers. They are constructing the flats as per their requirement and hence the delay in getting full occupancy certificate. Request you to grant us the extension as soon as possible so that we can proceed for Final Occupancy Certificate once these 11 flats are ready.

MahaRERA project filing · read 18 July 2026 · registration P52100004952

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹100,000₹70,277,019₹1,210,718,406₹1,473,477,272
Actual raised₹312,388,923₹86,550,983₹1,306,649,191₹1,705,589,097

MahaRERA project filing · read 18 July 2026 · registration P52100004952

Quarterly filing record

33 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 18 July 2026 · registration P52100004952

Documents named in the filing

  • Promoter PAN · 1 listed
  • Commencement certificate · 3 listed
  • Form 1 — Architect's certificate · 5 listed
  • Form 3 — CA certificate · 7 listed
  • Form 2 — Engineer's certificate · 5 listed
  • Form B — Promoter declaration · 7 listed
  • Title / search report · 5 listed
  • Sanctioned layout plan · 26 listed
  • Sanctioned building plan · 80 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 18 July 2026 · registration P52100004952

Builder and past records

What else does the record show?

Projects registered under this company

Maha Anand Pinnac Associates

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

    Past records of sales and unsold homes

    1. 21 September 2026

      4 marked unsold · 147 sold · 0 booked.

      Saved MahaRERA home list

    2. 13 September 2026

      4 marked unsold · 147 sold · 0 booked.

      Saved MahaRERA home list

    3. 4 September 2026

      4 marked unsold · 147 sold · 0 booked.

      Saved MahaRERA home list

    4. 18 July 2026

      4 marked unsold · 147 sold · 0 booked.

      Saved MahaRERA home list

    These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

    More projects to explore

    Other projects in this locality.

    These projects list the same locality. They may differ in exact location, home type and price.

    Project Comparison Report

    Which project should you buy in?
    And which home?

    Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 12 July 2026

    MahaRERA · per-home inventory · saved-file date 18 July 2026

    This is a past RERA home list, not current availability. It does not give the date each home was sold.

    The home-list date is based on the saved file’s details.

    Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

    Open MahaRERA · search P52100004952 ↗
    homeonpaper