homeonpaper.

Builder’s RERA records,
explained for buyers.

The builder’s RERA record, explained

MARIGOLD

KRUSHNA SAI BUILDCON LLP · P52100005283

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For MARIGOLD (P52100005283), 34 of 217 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).

MahaRERA · per-home inventory · saved-file date 18 July 2026

For MARIGOLD, ₹5,760 per sq ft of carpet area is the median rate across 183 sold or booked entries with prices in the MahaRERA home list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.

MahaRERA · per-home inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹5,760/ sq ft carpet area

Across 183 sold or booked entries with reported prices. The middle 80% of rates fall between ₹4,089 and ₹10,202.

MahaRERA · per-home inventory · saved-file date 18 July 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar homes sell for?

Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

217 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
A Building177145257029.51–58.65 sq m≈ 318–631 sq ft
B Building409427042.17–65.57 sq m≈ 454–706 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

217 listed entries

MahaRERA · per-home inventory · saved-file date 18 July 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
A-1001A Building1058.35 sq m≈ 628 sq ftMarked unsoldNot stated
A-1002A Building1042.21 sq m≈ 454 sq ftSold₹4,329,103
A-1003A Building1042.17 sq m≈ 454 sq ftSold₹4,307,945
A-1004A Building1042.18 sq m≈ 454 sq ftSold₹4,639,961
A-1005A Building1042.18 sq m≈ 454 sq ftSold₹4,518,475
A-1006A Building1042.17 sq m≈ 454 sq ftSold₹5,259,100
A-1007A Building1042.21 sq m≈ 454 sq ftBooked₹4,055,400
A-1008A Building1058.35 sq m≈ 628 sq ftSold₹3,400,000
A-1009A Building1058.35 sq m≈ 628 sq ftSold₹3,163,095
A-101A Building158.65 sq m≈ 631 sq ftSold₹3,825,000
A-1010A Building1042.21 sq m≈ 454 sq ftMarked unsoldNot stated
A-1011A Building1042.17 sq m≈ 454 sq ftSold₹6,045,601

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
A BuildingExcavation100.0%
A BuildingBasement (if any)100.0%
A BuildingPodiums (if any) 100.0%
A BuildingPlinth100.0%
A BuildingStilt Floor 100.0%
A BuildingSlabs of Super Structure100.0%
A BuildingInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
A BuildingSanitary Fittings within the flats / premises100.0%
A BuildingStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
A BuildingExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
A BuildingInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
B BuildingExcavation100.0%
B BuildingBasement (if any)0.0%
B BuildingPodiums (if any) 100.0%
B BuildingPlinth0.0%
B BuildingStilt Floor 100.0%
B BuildingSlabs of Super Structure90.0%
B BuildingInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70.0%
B BuildingSanitary Fittings within the flats / premises25.0%
B BuildingStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50.0%
B BuildingExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60.0%
B BuildingInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 18 July 2026 · registration P52100005283

Reported deadline extensions

Revised targetReason given by the builder
28 February 2021Due to extreme slow market conditions the sales of the project was affected and also the said project ran into delays due to slow work by Government Authorities in improving the approach roads to the project site. Therefore we were not able to complete the said Project within the said specified time under the Real Estate (Regulation and Development) Act, 2016.
28 February 2024Covid-19 Pandemic Declared by World Health Organization and consequent lockdown by the government further reverse migration of the labours to there native places and break in the supply chain of construction material. Construction of the project is under project we still require twenty four months to complete the project and get the occupancy certificate.
30 November 2024The project is facing delays due to a severe labour shortage, resulting in the unavailability of skilled workers. Additionally, the contractor’s performance has been adversely affected, leading in inefficiencies and compromised work quality. Given these challenges, requesting an extension becomes imperative to ensure the project’s successful completion while maintaining the desired standards and mitigating the impact of unforeseen workforce constraints.
30 November 2027The project is facing delay due to severe labour shortage, resulting in unavailiblity of skilled worker. Additionally, the contractor performance has been adverserly affected , leading in inefficiencies and compromised work quality. Given these challenges, requesting an extention become imperative to insure the project successful completion while maintaining the desired standard and mitigating the impact of unforeseen workforce constraints. It is important to note that the promoter has transparently communicated this matter to all allottees, majority of the allottees have agreed to provide their consent for the extension.

MahaRERA project filing · read 18 July 2026 · registration P52100005283

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹93,558,700₹150,000,000₹379,775,713₹623,334,413
Actual raised₹2,982,397₹0₹332,104,261₹335,086,658

MahaRERA project filing · read 18 July 2026 · registration P52100005283

Quarterly filing record

35 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 18 July 2026 · registration P52100005283

Documents named in the filing

  • Promoter PAN · 1 listed
  • Form 1 — Architect's certificate · 6 listed
  • Form 3 — CA certificate · 6 listed
  • Form 2 — Engineer's certificate · 6 listed
  • Title / search report · 2 listed
  • Form B — Promoter declaration · 2 listed
  • Sanctioned building plan · 11 listed
  • Sanctioned layout plan · 3 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 18 July 2026 · registration P52100005283

Builder and past records

What else does the record show?

Projects registered under this company

KRUSHNA SAI BUILDCON LLP

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

    Past records of sales and unsold homes

    1. 22 September 2026

      34 marked unsold · 154 sold · 29 booked.

      Saved MahaRERA home list

    2. 13 September 2026

      34 marked unsold · 154 sold · 29 booked.

      Saved MahaRERA home list

    3. 4 September 2026

      34 marked unsold · 154 sold · 29 booked.

      Saved MahaRERA home list

    4. 18 July 2026

      34 marked unsold · 154 sold · 29 booked.

      Saved MahaRERA home list

    These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

    Project Comparison Report

    Which project should you buy in?
    And which home?

    Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 12 July 2026

    MahaRERA · per-home inventory · saved-file date 18 July 2026

    This is a past RERA home list, not current availability. It does not give the date each home was sold.

    The home-list date is based on the saved file’s details.

    Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

    Open MahaRERA · search P52100005283 ↗
    homeonpaper