homeonpaper.

Builder’s RERA records,
explained for buyers.

The builder’s RERA record, explained

MSR SEASONS

Mind Space Realty Pvt. Ltd. · P52100006114

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For MSR SEASONS (P52100006114), 9 of 188 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).

MahaRERA · per-home inventory · saved-file date 18 July 2026

For MSR SEASONS, ₹8,433 per sq ft of carpet area is the median rate across 179 sold or booked entries with prices in the MahaRERA home list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.

MahaRERA · per-home inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹8,433/ sq ft carpet area

Across 179 sold or booked entries with reported prices. The middle 80% of rates fall between ₹6,699 and ₹9,287.

MahaRERA · per-home inventory · saved-file date 18 July 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar homes sell for?

Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

188 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
Wing A464600058.08–101.11 sq m≈ 625–1,088 sq ft
WING B464600058.08–101.12 sq m≈ 625–1,088 sq ft
WING C464402058.00–126.07 sq m≈ 624–1,357 sq ft
WING D464303058.00–183.00 sq m≈ 624–1,970 sq ft
WING E4004019.59 sq m≈ 211 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

188 listed entries

MahaRERA · per-home inventory · saved-file date 18 July 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
1001WING B1073.72 sq m≈ 794 sq ftSold₹6,394,600
1002WING B1090.01 sq m≈ 969 sq ftSold₹7,880,400
1003WING B1074.03 sq m≈ 797 sq ftSold₹5,987,600
1004WING B1074.03 sq m≈ 797 sq ftSold₹6,418,320
101WING B173.63 sq m≈ 793 sq ftSold₹6,369,900
102WING B190.13 sq m≈ 970 sq ftSold₹8,728,330
103WING B158.08 sq m≈ 625 sq ftSold₹4,853,000
104WING B158.08 sq m≈ 625 sq ftSold₹5,177,940
1101WING B1173.31 sq m≈ 789 sq ftSold₹6,590,480
1102WING B1190.13 sq m≈ 970 sq ftSold₹7,886,000
1103WING B1173.87 sq m≈ 795 sq ftSold₹6,594,750
1104WING B1173.87 sq m≈ 795 sq ftSold₹6,487,450

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
Wing AExcavation100.0%
Wing ABasement (if any)100.0%
Wing APodiums (if any) 100.0%
Wing APlinth100.0%
Wing AStilt Floor 100.0%
Wing ASlabs of Super Structure100.0%
Wing AInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
Wing ASanitary Fittings within the flats / premises100.0%
Wing AStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Wing AExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
Wing AInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
WING BExcavation100.0%
WING BBasement (if any)100.0%
WING BPodiums (if any) 100.0%
WING BPlinth100.0%
WING BStilt Floor 100.0%
WING BSlabs of Super Structure100.0%
WING BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
WING BSanitary Fittings within the flats / premises100.0%
WING BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
WING BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
WING BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
WING CExcavation100.0%
WING CBasement (if any)100.0%
WING CPodiums (if any) 100.0%
WING CPlinth100.0%
WING CStilt Floor 100.0%
WING CSlabs of Super Structure100.0%
WING CInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
WING CSanitary Fittings within the flats / premises100.0%
WING CStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
WING CExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
WING CInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
WING DExcavation100.0%
WING DBasement (if any)100.0%
WING DPodiums (if any) 100.0%
WING DPlinth100.0%
WING DStilt Floor 100.0%
WING DSlabs of Super Structure100.0%
WING DInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
WING DSanitary Fittings within the flats / premises100.0%
WING DStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
WING DExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
WING DInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
WING EExcavation0.0%
WING EBasement (if any)0.0%
WING EPodiums (if any) 0.0%
WING EPlinth0.0%
WING EStilt Floor 0.0%
WING ESlabs of Super Structure0.0%
WING EInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
WING ESanitary Fittings within the flats / premises0.0%
WING EStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
WING EExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
WING EInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 18 July 2026 · registration P52100006114

Reported deadline extensions

Revised targetReason given by the builder
30 December 2020Due to unavoidable reasons the developer / promoter not able to complete the project till 31/12/2019. The project at present is nearing completion and work is in progress in full swing at site.
31 December 2025At present we have completed 1 Building comprising of Wing A & B, out of the 5 wings sanctioned and we have received Part Completion/ Occupancy certificate for the wing A and wing B for the (called as Phase I for short) from the Municipal Corporation of Pimpri Chinchwad which is uploaded on the Maha RERA website. We have only allotted units out of A & B Wing and have the consent of all for the allottees in the Agreements executed. The under construction of (Phase 2) building housing C, D & E wing have all unsold/unallotted units. Wing C, D and E of the project are delayed due to delayed approval’s from Pimpri Chinchwad Municipal Corporation and current market conditions. It’s not possible for us to complete the entire project in as per above mentioned date and hence we request you to, kindly extend the project completion date from the current date for Wing C, D & E up-to 31st December 2025. We are willing to pay necessary fees as may be applicable for the same.

MahaRERA project filing · read 18 July 2026 · registration P52100006114

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹47,770,315₹0₹596,347,646₹644,117,961
Actual raised₹47,770,315₹0₹353,078,127₹400,848,442

MahaRERA project filing · read 18 July 2026 · registration P52100006114

Quarterly filing record

34 elapsed quarterly periods in the captured compliance schedule. Active default was recorded for FY 2025-2026.

MahaRERA project filing · read 18 July 2026 · registration P52100006114

Documents named in the filing

  • Commencement certificate · 2 listed
  • Promoter PAN · 1 listed
  • Form 1 — Architect's certificate · 1 listed
  • Form 3 — CA certificate · 1 listed
  • Form 2 — Engineer's certificate · 1 listed
  • Title / search report · 1 listed
  • Form B — Promoter declaration · 1 listed
  • Sanctioned layout plan · 3 listed
  • Sanctioned building plan · 20 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 18 July 2026 · registration P52100006114

Builder and past records

What else does the record show?

Projects registered under this company

Mind Space Realty Pvt. Ltd.

3Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

Past records of sales and unsold homes

  1. 21 September 2026

    9 marked unsold · 179 sold · 0 booked.

    Saved MahaRERA home list

  2. 13 September 2026

    9 marked unsold · 179 sold · 0 booked.

    Saved MahaRERA home list

  3. 4 September 2026

    9 marked unsold · 179 sold · 0 booked.

    Saved MahaRERA home list

  4. 18 July 2026

    9 marked unsold · 179 sold · 0 booked.

    Saved MahaRERA home list

These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

More projects to explore

Other projects in this locality.

These projects list the same locality. They may differ in exact location, home type and price.

Project Comparison Report

Which project should you buy in?
And which home?

Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

Create my Comparison Report →

2 projects · ₹7,999
3 projects · ₹9,999

Within 1 working day

Didn’t help you decide? Full refund — no questions asked.

Compare project details for free →

Sources and dates.

MahaRERA · registration record · read 12 July 2026

MahaRERA · per-home inventory · saved-file date 18 July 2026

This is a past RERA home list, not current availability. It does not give the date each home was sold.

The home-list date is based on the saved file’s details.

Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

Open MahaRERA · search P52100006114 ↗
homeonpaper