Buyer’s Report
Understand this project
Find homes to consider, with advice on light, layout, privacy and surroundings.
₹4,999
Builder’s RERA records,
explained for buyers.
The builder’s RERA record, explained
Opulent Estate · P52100007317
For Sheetal Square (P52100007317), 125 of 125 entries were marked unsold in the MahaRERA home list read 4 September 2026.
These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.
Builder’s completion target
This target date has passed. The record shown here does not confirm whether the project is complete or has received more time.
Status shown on RERA
This is the status shown on RERA. It does not confirm an occupancy certificate or today’s construction progress.
Inside this registered phase
125 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.
MahaRERA · per-home inventory · read 4 September 2026
Scroll sideways to see all columns.
| Filed building | Entries | Sold | Booked | Marked unsold | Other / unstated status | Recorded carpet-area range |
|---|---|---|---|---|---|---|
| Sheetal Square | 125 | 0 | 0 | 125 | 0 | 28.60–80.56 sq m≈ 308–867 sq ft |
Different sizes are not necessarily different bedroom types. How we read and summarise the filing →
Unit Report
Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.
Didn’t help you decide? Full refund — no questions asked.
The same home number may appear in more than one building. Check both before choosing.
MahaRERA · per-home inventory · read 4 September 2026
| Home / building | Floor in the record | Carpet area | Reported status | Agreement value | Assess |
|---|---|---|---|---|---|
| 1Sheetal Square | 202 | 42.74 sq m≈ 460 sq ft | Marked unsold | Not stated | |
| 10Sheetal Square | 202 | 51.13 sq m≈ 550 sq ft | Marked unsold | Not stated | |
| 1001Sheetal Square | 10 | 49.24 sq m≈ 530 sq ft | Marked unsold | Not stated | |
| 1002Sheetal Square | 10 | 49.24 sq m≈ 530 sq ft | Marked unsold | Not stated | |
| 1004Sheetal Square | 10 | 49.25 sq m≈ 530 sq ft | Marked unsold | Not stated | |
| 1005Sheetal Square | 10 | 33.41 sq m≈ 360 sq ft | Marked unsold | Not stated | |
| 1006Sheetal Square | 10 | 49.67 sq m≈ 535 sq ft | Marked unsold | Not stated | |
| 1007Sheetal Square | 10 | 50.0 sq m≈ 538 sq ft | Marked unsold | Not stated | |
| 101Sheetal Square | 1 | 42.88 sq m≈ 462 sq ft | Marked unsold | Not stated | |
| 102Sheetal Square | 1 | 28.6 sq m≈ 308 sq ft | Marked unsold | Not stated | |
| 103Sheetal Square | 1 | 28.95 sq m≈ 312 sq ft | Marked unsold | Not stated | |
| 104Sheetal Square | 1 | 28.95 sq m≈ 312 sq ft | Marked unsold | Not stated |
Read every entry in one table: Read the complete saved home list.
Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.
More from the RERA documents
Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.
| Building | Activity | Reported |
|---|---|---|
| Sheetal Square | Excavation | 100.0% |
| Sheetal Square | Basement (if any) | 100.0% |
| Sheetal Square | Podiums (if any) | 0.0% |
| Sheetal Square | Plinth | 100.0% |
| Sheetal Square | Stilt Floor | 100.0% |
| Sheetal Square | Slabs of Super Structure | 100.0% |
| Sheetal Square | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| Sheetal Square | Sanitary Fittings within the flats / premises | 60.0% |
| Sheetal Square | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| Sheetal Square | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| Sheetal Square | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
MahaRERA project filing · read 18 July 2026 · registration P52100007317
| Revised target | Reason given by the builder |
|---|---|
| 30 June 2022 | due to Pune Corporation Stop work from 2 years |
| 31 December 2024 | 1) Pune Municipal Corporation issued stop work order for the construction at the said project site almost for 1.5 to 2 years and 2) 2) due to unprecedent COVID-19 (Corona Virus) Pandemic and consequent nation-wide lockdown. The construction activities of the given project have been severely impacted and had come to stand still for major period. The situation further aggravated to break in supply chain of construction materials, shortage of labors at construction site due to migration, crunch in cash flow due to impact of sale etc. 3)The administrative offices of Pune Municipal Corporation and other concerned authorities were closed due to pandemic and later carried out with limited number of employees/staffs which is causing irregularities in the work. |
MahaRERA project filing · read 18 July 2026 · registration P52100007317
32 elapsed quarterly periods in the captured compliance schedule. Active default was recorded for FY 2025-2026.
MahaRERA project filing · read 18 July 2026 · registration P52100007317
A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.
MahaRERA project filing · read 18 July 2026 · registration P52100007317
Builder and past records
Projects registered under this company
1Pune registrations
These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.
MahaRERA Pune registration records · read 12 July 2026
Past records of sales and unsold homes
21 September 2026
125 marked unsold · 0 sold · 0 booked.
Saved MahaRERA home list
13 September 2026
125 marked unsold · 0 sold · 0 booked.
Saved MahaRERA home list
4 September 2026
125 marked unsold · 0 sold · 0 booked.
Saved MahaRERA home list
These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.
Project Comparison Report
Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.
2 projects · ₹7,999
3 projects · ₹9,999
Within 1 working day
Didn’t help you decide? Full refund — no questions asked.
Compare project details for free →MahaRERA · registration record · read 12 July 2026
MahaRERA · per-home inventory · read 4 September 2026
This is a past RERA home list, not current availability. It does not give the date each home was sold.
Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.
Open MahaRERA · search P52100007317 ↗