What does the RERA record show?

For ALTEZA CITY (P52100007825), 64 of 162 entries were marked unsold in the MahaRERA unit list dated 18 July 2026 (saved-file date).

MahaRERA · per-unit inventory · saved-file date 18 July 2026

For ALTEZA CITY, ₹3,868 per sq ft of filed area is the median rate across 71 sold or booked entries with prices in the MahaRERA unit list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.

MahaRERA · per-unit inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find units to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular unit

See its advantages, drawbacks and how it compares with other units in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended units in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹3,868/ sq ft filed area

Across 71 sold or booked entries with reported prices. The middle 80% of rates fall between ₹3,148 and ₹4,790.

MahaRERA · per-unit inventory · saved-file date 18 July 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its filed area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold units and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar units sell for?

Compare filed values by building, unit-number pattern and area. See which units were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

162 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-unit inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and filed areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded filed-area range
ALTEZA CITY A484700138.33–41.83 sq m≈ 413–450 sq ft
ALTEZA CITY B2410011338.79–54.00 sq m≈ 418–581 sq ft
ALTEZA CITY C3014031338.79–54.00 sq m≈ 418–581 sq ft
ALTEZA CITY D600060038.33–41.67 sq m≈ 413–449 sq ft

Area means carpet area for building units and plot area for plots. Size alone does not establish use or layout. How we read and summarise the filing →

Unit Report

Is this the right
unit for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar units and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your unit in the RERA list.

The same unit number may appear in more than one building. Check both before choosing.

162 listed entries

MahaRERA · per-unit inventory · saved-file date 18 July 2026

RERA unit list, not current availability
Unit / buildingFloor in the recordFiled areaReported statusAgreement valueAssess
A -101ALTEZA CITY A / Wing NA141.67 sq m≈ 449 sq ft · RERA carpet areaSold₹1,515,000
A -102ALTEZA CITY A / Wing NA140.83 sq m≈ 439 sq ft · RERA carpet areaSold₹2,125,000
A -103ALTEZA CITY A / Wing NA141.57 sq m≈ 447 sq ft · RERA carpet areaSold₹1,820,000
A -104ALTEZA CITY A / Wing NA138.98 sq m≈ 420 sq ft · RERA carpet areaSold₹1,500,000
A -105ALTEZA CITY A / Wing NA138.33 sq m≈ 413 sq ft · RERA carpet areaSold₹1,850,000
A -106ALTEZA CITY A / Wing NA141.67 sq m≈ 449 sq ft · RERA carpet areaSold₹1,850,000
A -107ALTEZA CITY A / Wing NA141.67 sq m≈ 449 sq ft · RERA carpet areaSold₹1,800,000
A -108ALTEZA CITY A / Wing NA140.83 sq m≈ 439 sq ft · RERA carpet areaSold₹1,950,000
A -109ALTEZA CITY A / Wing NA141.57 sq m≈ 447 sq ft · RERA carpet areaSold₹1,410,000
A -110ALTEZA CITY A / Wing NA138.98 sq m≈ 420 sq ft · RERA carpet areaSold₹1,600,000
A -111ALTEZA CITY A / Wing NA138.33 sq m≈ 413 sq ft · RERA carpet areaSold₹1,600,000
A -112ALTEZA CITY A / Wing NA141.67 sq m≈ 449 sq ft · RERA carpet areaSold₹1,850,000

Read every entry in one table: Read the complete saved unit list.

Choose the unit you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
ALTEZA CITY AExcavation100.0%
ALTEZA CITY ABasement (if any)0.0%
ALTEZA CITY APodiums (if any) 0.0%
ALTEZA CITY APlinth100.0%
ALTEZA CITY AStilt Floor 100.0%
ALTEZA CITY ASlabs of Super Structure100.0%
ALTEZA CITY AInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
ALTEZA CITY ASanitary Fittings within the flats / premises100.0%
ALTEZA CITY AStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
ALTEZA CITY AExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
ALTEZA CITY AInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
ALTEZA CITY BExcavation100.0%
ALTEZA CITY BBasement (if any)0.0%
ALTEZA CITY BPodiums (if any) 0.0%
ALTEZA CITY BPlinth100.0%
ALTEZA CITY BStilt Floor 100.0%
ALTEZA CITY BSlabs of Super Structure100.0%
ALTEZA CITY BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
ALTEZA CITY BSanitary Fittings within the flats / premises100.0%
ALTEZA CITY BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
ALTEZA CITY BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
ALTEZA CITY BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
ALTEZA CITY CExcavation100.0%
ALTEZA CITY CBasement (if any)0.0%
ALTEZA CITY CPodiums (if any) 0.0%
ALTEZA CITY CPlinth100.0%
ALTEZA CITY CStilt Floor 100.0%
ALTEZA CITY CSlabs of Super Structure100.0%
ALTEZA CITY CInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
ALTEZA CITY CSanitary Fittings within the flats / premises100.0%
ALTEZA CITY CStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
ALTEZA CITY CExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
ALTEZA CITY CInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
ALTEZA CITY DExcavation100.0%
ALTEZA CITY DBasement (if any)0.0%
ALTEZA CITY DPodiums (if any) 0.0%
ALTEZA CITY DPlinth100.0%
ALTEZA CITY DStilt Floor 100.0%
ALTEZA CITY DSlabs of Super Structure100.0%
ALTEZA CITY DInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
ALTEZA CITY DSanitary Fittings within the flats / premises90.0%
ALTEZA CITY DStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
ALTEZA CITY DExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90.0%
ALTEZA CITY DInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30.0%

MahaRERA project filing · read 18 July 2026 · registration P52100007825

Reported deadline extensions

Revised targetReason given by the builder
30 June 2024Due to Covid 19 pandemic and PMRDA Sanction issues we are unable to complete the project in given time and hence we are applying for extension by taking the permission of 92 % unit holders. We request you to consider this and grant the extension period for Project completion
30 December 20251. There is financial problem for starting new building in this project we are not yet overcome from financial problem raised during covid 19 pandemic period. 2. New Development Plan of PMRDA is not yet sanctioned and hence we are facing technical problem for the project. 3. We are unable to complete the project within due date as our Structural engineer is deceased.

MahaRERA project filing · read 18 July 2026 · registration P52100007825

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹143,300,000₹0₹0₹143,300,000
Actual raised₹0₹0₹127,640,100₹127,640,100

MahaRERA project filing · read 18 July 2026 · registration P52100007825

Quarterly filing record

34 elapsed quarterly periods in the captured compliance schedule. Active default was recorded for FY 2025-2026.

MahaRERA project filing · read 18 July 2026 · registration P52100007825

Documents named in the filing

  • Promoter PAN · 1 listed
  • Form 1 — Architect's certificate · 11 listed
  • Form 3 — CA certificate · 18 listed
  • Form 2 — Engineer's certificate · 16 listed
  • Title / search report · 1 listed
  • Form B — Promoter declaration · 2 listed
  • Sanctioned layout plan · 1 listed
  • Sanctioned building plan · 1 listed
  • Occupancy / completion certificate · 1 listed
  • Encumbrance certificate · 1 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 18 July 2026 · registration P52100007825

Builder and past records

What else does the record show?

Projects registered under this company

S BUILDERS & DEVELOPERS

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

    Past records of sales and unsold units

    1. 30 September 2026

      64 marked unsold · 71 sold · 0 booked.

      Saved MahaRERA unit list

    2. 22 September 2026

      64 marked unsold · 71 sold · 0 booked.

      Saved MahaRERA unit list

    3. 13 September 2026

      64 marked unsold · 71 sold · 0 booked.

      Saved MahaRERA unit list

    4. 4 September 2026

      64 marked unsold · 71 sold · 0 booked.

      Saved MahaRERA unit list

    These dates show when the records were saved, not when units were sold. Sales may have changed since then, even if the saved counts are the same.

    Project Comparison Report

    Which project should you buy in?
    And which unit?

    Compare up to three projects. We read their plans and RERA documents, recommend units in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 12 July 2026

    MahaRERA · per-unit inventory · saved-file date 18 July 2026

    This is a past RERA unit list, not current availability. It does not give the date each unit was sold.

    The unit-list date is based on the saved file’s details.

    Filed area means carpet area for building units and plot area for plots. Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

    Open MahaRERA · search P52100007825 ↗