The builder’s RERA record, explained
KALYAN JAGANNATH JADHAV · P52100008908
For KJ TOWER (P52100008908), 102 of 160 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).
MahaRERA · per-home inventory · saved-file date 18 July 2026
For KJ TOWER, ₹9,862 per sq ft of carpet area is the median rate across 58 sold or booked entries with prices in the MahaRERA home list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.
MahaRERA · per-home inventory · saved-file date 18 July 2026
These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.
Builder’s completion target
This target date has passed. The record shown here does not confirm whether the project is complete or has received more time.
Status shown on RERA
This is the status shown on RERA. It does not confirm an occupancy certificate or today’s construction progress.
Prices reported to RERA
₹9,862/ sq ft carpet area
Across 58 sold or booked entries with reported prices. The middle 80% of rates fall between ₹7,481 and ₹14,998.
MahaRERA · per-home inventory · saved-file date 18 July 2026
For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.
Sales Report
Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.
Inside this registered phase
160 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.
MahaRERA · per-home inventory · saved-file date 18 July 2026
Scroll sideways to see all columns.
| Filed building | Entries | Sold | Booked | Marked unsold | Other / unstated status | Recorded carpet-area range |
|---|---|---|---|---|---|---|
| A | 40 | 32 | 0 | 8 | 0 | 46.23–331.58 sq m≈ 498–3,569 sq ft |
| B | 40 | 18 | 0 | 22 | 0 | 46.23–354.93 sq m≈ 498–3,820 sq ft |
| C | 40 | 3 | 0 | 37 | 0 | 46.23–104.63 sq m≈ 498–1,126 sq ft |
| D | 40 | 5 | 0 | 35 | 0 | 46.23–139.90 sq m≈ 498–1,506 sq ft |
Different sizes are not necessarily different bedroom types. How we read and summarise the filing →
Unit Report
Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.
Didn’t help you decide? Full refund — no questions asked.
The same home number may appear in more than one building. Check both before choosing.
MahaRERA · per-home inventory · saved-file date 18 July 2026
| Home / building | Floor in the record | Carpet area | Reported status | Agreement value | Assess |
|---|---|---|---|---|---|
| 1A | 205 | 96.24 sq m≈ 1,036 sq ft | Sold | ₹15,950,000 | |
| 101A | 1 | 91.52 sq m≈ 985 sq ft | Marked unsold | Not stated | |
| 102A | 1 | 99.06 sq m≈ 1,066 sq ft | Sold | ₹10,145,000 | |
| 103A | 1 | 99.06 sq m≈ 1,066 sq ft | Marked unsold | Not stated | |
| 104A | 1 | 104.61 sq m≈ 1,126 sq ft | Sold | ₹12,672,893 | |
| 16A | 205 | 181.43 sq m≈ 1,953 sq ft | Sold | ₹30,000,000 | |
| 2A | 205 | 331.58 sq m≈ 3,569 sq ft | Sold | ₹29,339,719 | |
| 201A | 2 | 92.8 sq m≈ 999 sq ft | Sold | ₹11,303,572 | |
| 202A | 2 | 83.97 sq m≈ 904 sq ft | Sold | ₹9,339,286 | |
| 203A | 2 | 63.35 sq m≈ 682 sq ft | Marked unsold | Not stated | |
| 204A | 2 | 112.25 sq m≈ 1,208 sq ft | Sold | ₹14,114,000 | |
| 3A | 205 | 312.6 sq m≈ 3,365 sq ft | Sold | ₹27,660,281 |
Read every entry in one table: Read the complete saved home list.
Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.
More from the RERA documents
₹624,500,000 of an estimated ₹641,500,000 was reported as incurred (97.3%). This percentage is about costs. It does not show how much construction is complete.
MahaRERA project filing · read 18 July 2026 · registration P52100008908
Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.
| Building | Activity | Reported |
|---|---|---|
| A | Excavation | 100.0% |
| A | Basement (if any) | 100.0% |
| A | Podiums (if any) | 100.0% |
| A | Plinth | 100.0% |
| A | Stilt Floor | 100.0% |
| A | Slabs of Super Structure | 100.0% |
| A | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 97.0% |
| A | Sanitary Fittings within the flats / premises | 80.0% |
| A | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 96.0% |
| A | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 99.0% |
| A | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90.0% |
| B | Excavation | 100.0% |
| B | Basement (if any) | 100.0% |
| B | Podiums (if any) | 100.0% |
| B | Plinth | 100.0% |
| B | Stilt Floor | 100.0% |
| B | Slabs of Super Structure | 100.0% |
| B | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 97.0% |
| B | Sanitary Fittings within the flats / premises | 80.0% |
| B | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 96.0% |
| B | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 99.0% |
| B | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90.0% |
| C | Excavation | 100.0% |
| C | Basement (if any) | 100.0% |
| C | Podiums (if any) | 100.0% |
| C | Plinth | 100.0% |
| C | Stilt Floor | 100.0% |
| C | Slabs of Super Structure | 100.0% |
| C | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 97.0% |
| C | Sanitary Fittings within the flats / premises | 80.0% |
| C | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 96.0% |
| C | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 99.0% |
| C | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90.0% |
| D | Excavation | 100.0% |
| D | Basement (if any) | 100.0% |
| D | Podiums (if any) | 100.0% |
| D | Plinth | 100.0% |
| D | Stilt Floor | 100.0% |
| D | Slabs of Super Structure | 100.0% |
| D | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 97.0% |
| D | Sanitary Fittings within the flats / premises | 80.0% |
| D | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 96.0% |
| D | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 99.0% |
| D | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90.0% |
MahaRERA project filing · read 18 July 2026 · registration P52100008908
| Revised target | Reason given by the builder |
|---|---|
| 29 March 2025 | a) Our Project- ‘KJ TOWER bearing Reg. No. P52100008908 has its initial registration valid till 30th March, 2024. b) Our project is in progress which is indicated by the latest Form 1 Project Architect Certificate (attached with this application), where our project is almost 80% complete. In the year 2020, due to changes in UDCPR norms, our project quantum was impacted, which we had already considered in our project estimations. But inadvertently we missed to incorporate the impact of the changes in UDPCR on our ‘Proposed Completion Date’ of our project and erred to estimate the appropriate completion date. c) Hence, we want to rectify our Proposed Date of Completion of our said project to 29th March, 2025 from its initial proposed date of completion as 30th March 2024. We have already communicated the same in a transparent manner to all our allottees of the project. |
| 30 September 2025 | Due to some financial and litigation problems. |
| 31 March 2026 | Due to some financial, Government Approvals and litigation problems. |
| 30 June 2026 | The project timeline has been adjusted by three months to facilitate the finalization of outstanding construction work and the procurement of essential statutory clearances, including the Fire NOC and the Building Completion Certificate from the Municipal Corporation. |
MahaRERA project filing · read 18 July 2026 · registration P52100008908
RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.
| Filing | Own funds | Borrowing | Payments from buyers | Total |
|---|---|---|---|---|
| Estimated plan | ₹338,300,000 | ₹0 | ₹392,200,000 | ₹730,500,000 |
| Actual raised | ₹356,306,000 | ₹0 | ₹386,835,000 | ₹743,141,000 |
MahaRERA project filing · read 18 July 2026 · registration P52100008908
35 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.
MahaRERA project filing · read 18 July 2026 · registration P52100008908
A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.
MahaRERA project filing · read 18 July 2026 · registration P52100008908
Builder and past records
Projects registered under this company
1Pune registrations
These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.
MahaRERA Pune registration records · read 12 July 2026
Past records of sales and unsold homes
21 September 2026
102 marked unsold · 58 sold · 0 booked.
Saved MahaRERA home list
13 September 2026
102 marked unsold · 58 sold · 0 booked.
Saved MahaRERA home list
4 September 2026
102 marked unsold · 58 sold · 0 booked.
Saved MahaRERA home list
18 July 2026
102 marked unsold · 58 sold · 0 booked.
Saved MahaRERA home list
These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.
More projects to explore
These projects list the same locality. They may differ in exact location, home type and price.
Warje · Pune
P52100051028
14 of 140 entries marked unsold
MahaRERA · per-home inventory · saved-file date 18 July 2026
View project details →Warje · Pune
PR1260002600199
195 of 384 entries marked unsold
MahaRERA · per-home inventory · read 12 September 2026
View project details →Warje · Pune
P52100053397
9 of 120 entries marked unsold
MahaRERA · per-home inventory · read 11 September 2026
View project details →Project Comparison Report
Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.
2 projects · ₹7,999
3 projects · ₹9,999
Within 1 working day
Didn’t help you decide? Full refund — no questions asked.
Compare project details for free →MahaRERA · registration record · read 12 July 2026
MahaRERA · per-home inventory · saved-file date 18 July 2026
This is a past RERA home list, not current availability. It does not give the date each home was sold.
The home-list date is based on the saved file’s details.
Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.
Open MahaRERA · search P52100008908 ↗