homeonpaper.

Builder’s RERA records,
explained for buyers.

The builder’s RERA record, explained

Manikbaug Orchid

Waghere Promoters · P52100010235

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For Manikbaug Orchid (P52100010235), 217 of 218 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).

MahaRERA · per-home inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Inside this registered phase

How do the buildings compare in the record?

218 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
Manikbaug Orchid Building D431042068.57–79.76 sq m≈ 738–859 sq ft
Manikbaug Orchid Building E640064066.21–79.52 sq m≈ 713–856 sq ft
Manikbaug Orchid Building F640064067.14–76.55 sq m≈ 723–824 sq ft
Manikbaug Orchid G Commercial470047018.11–75.38 sq m≈ 195–811 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

218 listed entries

MahaRERA · per-home inventory · saved-file date 18 July 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
1001Manikbaug Orchid Building D1069.97 sq m≈ 753 sq ftMarked unsoldNot stated
1002Manikbaug Orchid Building D1069.97 sq m≈ 753 sq ftMarked unsoldNot stated
1003Manikbaug Orchid Building D1069.97 sq m≈ 753 sq ftMarked unsoldNot stated
1004Manikbaug Orchid Building D1069.97 sq m≈ 753 sq ftMarked unsoldNot stated
101Manikbaug Orchid Building D176.05 sq m≈ 819 sq ftMarked unsoldNot stated
102Manikbaug Orchid Building D170.67 sq m≈ 761 sq ftMarked unsoldNot stated
103Manikbaug Orchid Building D176.05 sq m≈ 819 sq ftMarked unsoldNot stated
104Manikbaug Orchid Building D176.05 sq m≈ 819 sq ftMarked unsoldNot stated
1101Manikbaug Orchid Building D1176.05 sq m≈ 819 sq ftMarked unsoldNot stated
1102Manikbaug Orchid Building D1179.76 sq m≈ 859 sq ftMarked unsoldNot stated
1103Manikbaug Orchid Building D1176.05 sq m≈ 819 sq ftMarked unsoldNot stated
1104Manikbaug Orchid Building D1176.05 sq m≈ 819 sq ftMarked unsoldNot stated

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹89,740,786 of an estimated ₹426,747,495 was reported as incurred (21.0%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 18 July 2026 · registration P52100010235

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
Manikbaug Orchid Building DExcavation100.0%
Manikbaug Orchid Building DBasement (if any)0.0%
Manikbaug Orchid Building DPodiums (if any) 0.0%
Manikbaug Orchid Building DPlinth100.0%
Manikbaug Orchid Building DStilt Floor 0.0%
Manikbaug Orchid Building DSlabs of Super Structure100.0%
Manikbaug Orchid Building DInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60.0%
Manikbaug Orchid Building DSanitary Fittings within the flats / premises0.0%
Manikbaug Orchid Building DStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Manikbaug Orchid Building DExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Manikbaug Orchid Building DInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40.0%
Manikbaug Orchid Building EExcavation100.0%
Manikbaug Orchid Building EBasement (if any)0.0%
Manikbaug Orchid Building EPodiums (if any) 0.0%
Manikbaug Orchid Building EPlinth100.0%
Manikbaug Orchid Building EStilt Floor 0.0%
Manikbaug Orchid Building ESlabs of Super Structure100.0%
Manikbaug Orchid Building EInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50.0%
Manikbaug Orchid Building ESanitary Fittings within the flats / premises0.0%
Manikbaug Orchid Building EStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90.0%
Manikbaug Orchid Building EExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Manikbaug Orchid Building EInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30.0%
Manikbaug Orchid Building FExcavation100.0%
Manikbaug Orchid Building FBasement (if any)0.0%
Manikbaug Orchid Building FPodiums (if any) 0.0%
Manikbaug Orchid Building FPlinth100.0%
Manikbaug Orchid Building FStilt Floor 0.0%
Manikbaug Orchid Building FSlabs of Super Structure35.0%
Manikbaug Orchid Building FInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Manikbaug Orchid Building FSanitary Fittings within the flats / premises0.0%
Manikbaug Orchid Building FStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Manikbaug Orchid Building FExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Manikbaug Orchid Building FInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Manikbaug Orchid G CommercialExcavation0.0%
Manikbaug Orchid G CommercialBasement (if any)0.0%
Manikbaug Orchid G CommercialPodiums (if any) 0.0%
Manikbaug Orchid G CommercialPlinth0.0%
Manikbaug Orchid G CommercialStilt Floor 0.0%
Manikbaug Orchid G CommercialSlabs of Super Structure0.0%
Manikbaug Orchid G CommercialInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Manikbaug Orchid G CommercialSanitary Fittings within the flats / premises0.0%
Manikbaug Orchid G CommercialStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Manikbaug Orchid G CommercialExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Manikbaug Orchid G CommercialInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 18 July 2026 · registration P52100010235

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹112,202,709₹50,000,000₹507,271,348₹669,474,057
Actual raised₹150,058,102₹0₹0₹150,058,102

MahaRERA project filing · read 18 July 2026 · registration P52100010235

Quarterly filing record

35 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 18 July 2026 · registration P52100010235

Documents named in the filing

  • Promoter PAN · 1 listed
  • Form 1 — Architect's certificate · 6 listed
  • Form 3 — CA certificate · 6 listed
  • Form 2 — Engineer's certificate · 6 listed
  • Title / search report · 1 listed
  • Form B — Promoter declaration · 1 listed
  • Sanctioned layout plan · 3 listed
  • Sanctioned building plan · 23 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 18 July 2026 · registration P52100010235

Builder and past records

What else does the record show?

Projects registered under this company

Waghere Promoters

3Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

Past records of sales and unsold homes

  1. 21 September 2026

    217 marked unsold · 1 sold · 0 booked.

    Saved MahaRERA home list

  2. 13 September 2026

    217 marked unsold · 1 sold · 0 booked.

    Saved MahaRERA home list

  3. 4 September 2026

    217 marked unsold · 1 sold · 0 booked.

    Saved MahaRERA home list

  4. 18 July 2026

    217 marked unsold · 1 sold · 0 booked.

    Saved MahaRERA home list

These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

Project Comparison Report

Which project should you buy in?
And which home?

Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

Create my Comparison Report →

2 projects · ₹7,999
3 projects · ₹9,999

Within 1 working day

Didn’t help you decide? Full refund — no questions asked.

Compare project details for free →

Sources and dates.

MahaRERA · registration record · read 12 July 2026

MahaRERA · per-home inventory · saved-file date 18 July 2026

This is a past RERA home list, not current availability. It does not give the date each home was sold.

The home-list date is based on the saved file’s details.

Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

Open MahaRERA · search P52100010235 ↗
homeonpaper