Buyer’s Report
Understand this project
Find homes to consider, with advice on light, layout, privacy and surroundings.
₹4,999
Builder’s RERA records,
explained for buyers.
The builder’s RERA record, explained
Goldfinger Kataria Urban Developments · P52100013230
For Tamara (P52100013230), 155 of 396 entries were marked unsold in the MahaRERA home list read 4 September 2026.
For Tamara, ₹9,544 per sq ft of carpet area is the median rate across 241 sold or booked entries with prices in the MahaRERA home list read 4 September 2026. These are historical agreement values, not current asking prices.
These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.
Builder’s completion target
The builder reported this target date. It is not a confirmed handover date.
Status shown on RERA
This is the status shown on RERA. It does not confirm an occupancy certificate or today’s construction progress.
Prices reported to RERA
₹9,544/ sq ft carpet area
Across 241 sold or booked entries with reported prices. The middle 80% of rates fall between ₹7,105 and ₹11,617.
MahaRERA · per-home inventory · read 4 September 2026
For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.
Sales Report
Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.
Inside this registered phase
396 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.
MahaRERA · per-home inventory · read 4 September 2026
Scroll sideways to see all columns.
| Filed building | Entries | Sold | Booked | Marked unsold | Other / unstated status | Recorded carpet-area range |
|---|---|---|---|---|---|---|
| A building | 43 | 42 | 0 | 1 | 0 | 64.26–66.24 sq m≈ 692–713 sq ft |
| B Building | 43 | 40 | 0 | 3 | 0 | 67.72–91.97 sq m≈ 729–990 sq ft |
| C Building | 43 | 40 | 0 | 3 | 0 | 59.51–90.52 sq m≈ 641–974 sq ft |
| Wing D Uprise | 135 | 73 | 0 | 62 | 0 | 67.66–204.40 sq m≈ 728–2,200 sq ft |
| Wing E Uprise | 132 | 46 | 0 | 86 | 0 | 22.46–435.31 sq m≈ 242–4,686 sq ft |
Different sizes are not necessarily different bedroom types. How we read and summarise the filing →
Unit Report
Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.
Didn’t help you decide? Full refund — no questions asked.
The same home number may appear in more than one building. Check both before choosing.
MahaRERA · per-home inventory · read 4 September 2026
| Home / building | Floor in the record | Carpet area | Reported status | Agreement value | Assess |
|---|---|---|---|---|---|
| 1001A building | 10 | 64.75 sq m≈ 697 sq ft | Sold | ₹6,231,400 | |
| 1002A building | 10 | 64.75 sq m≈ 697 sq ft | Sold | ₹5,518,100 | |
| 1003A building | 10 | 66.23 sq m≈ 713 sq ft | Sold | ₹5,376,465 | |
| 1004A building | 10 | 66.23 sq m≈ 713 sq ft | Sold | ₹6,563,000 | |
| 101A building | 1 | 64.75 sq m≈ 697 sq ft | Sold | ₹5,193,800 | |
| 102A building | 1 | 64.75 sq m≈ 697 sq ft | Sold | ₹5,030,600 | |
| 103A building | 1 | 64.75 sq m≈ 697 sq ft | Marked unsold | Not stated | |
| 104A building | 1 | 64.75 sq m≈ 697 sq ft | Sold | ₹6,500,000 | |
| 1101A building | 11 | 64.75 sq m≈ 697 sq ft | Sold | ₹6,461,000 | |
| 1102A building | 11 | 64.75 sq m≈ 697 sq ft | Sold | ₹6,463,000 | |
| 1103A building | 11 | 66.23 sq m≈ 713 sq ft | Sold | ₹6,555,000 | |
| 1104A building | 11 | 66.23 sq m≈ 713 sq ft | Sold | ₹6,383,000 |
Read every entry in one table: Read the complete saved home list.
Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.
More from the RERA documents
₹547,000,000 of an estimated ₹1,086,310,000 was reported as incurred (50.4%). This percentage is about costs. It does not show how much construction is complete.
MahaRERA project filing · read 18 July 2026 · registration P52100013230
Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.
| Building | Activity | Reported |
|---|---|---|
| A building | Excavation | 100.0% |
| A building | Basement (if any) | 100.0% |
| A building | Podiums (if any) | 100.0% |
| A building | Plinth | 100.0% |
| A building | Stilt Floor | 100.0% |
| A building | Slabs of Super Structure | 100.0% |
| A building | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| A building | Sanitary Fittings within the flats / premises | 100.0% |
| A building | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| A building | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| A building | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| B Building | Excavation | 100.0% |
| B Building | Basement (if any) | 100.0% |
| B Building | Podiums (if any) | 100.0% |
| B Building | Plinth | 100.0% |
| B Building | Stilt Floor | 100.0% |
| B Building | Slabs of Super Structure | 100.0% |
| B Building | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| B Building | Sanitary Fittings within the flats / premises | 100.0% |
| B Building | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| B Building | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| B Building | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| C Building | Excavation | 100.0% |
| C Building | Basement (if any) | 100.0% |
| C Building | Podiums (if any) | 100.0% |
| C Building | Plinth | 100.0% |
| C Building | Stilt Floor | 100.0% |
| C Building | Slabs of Super Structure | 100.0% |
| C Building | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| C Building | Sanitary Fittings within the flats / premises | 100.0% |
| C Building | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| C Building | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| C Building | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| D - uprise | Excavation | 100.0% |
| D - uprise | Basement (if any) | 100.0% |
| D - uprise | Podiums (if any) | 90.0% |
| D - uprise | Plinth | 100.0% |
| D - uprise | Stilt Floor | 0.0% |
| D - uprise | Slabs of Super Structure | 68.0% |
| D - uprise | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| D - uprise | Sanitary Fittings within the flats / premises | 0.0% |
| D - uprise | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70.0% |
| D - uprise | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| D - uprise | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| E - uprise | Excavation | 90.0% |
| E - uprise | Basement (if any) | 90.0% |
| E - uprise | Podiums (if any) | 50.0% |
| E - uprise | Plinth | 90.0% |
| E - uprise | Stilt Floor | 0.0% |
| E - uprise | Slabs of Super Structure | 65.0% |
| E - uprise | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| E - uprise | Sanitary Fittings within the flats / premises | 0.0% |
| E - uprise | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 65.0% |
| E - uprise | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| E - uprise | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
MahaRERA project filing · read 18 July 2026 · registration P52100013230
| Revised target | Reason given by the builder |
|---|---|
| 31 December 2020 | "It was pleasure to complete the project 5 months before the date of completing the project announced in RERA. The date of completing the Project was given as 31.12.17 & we have received Completion Certificate from PCMC on 31.7.17. Completion from PCMC is pending for 6 flats sold, due to change in balcony location & the extension for the same is required for that purpose only. The Environment Clearance of the Project is also pending with the authorities from quite long time. Firm has proposal to construct 2 Residential & 1 Commercial building in the same project, which will be undertaken after getting Environment Clearance & due sanctions of Plan from PCMC." |
| 30 December 2026 | Due to Covid 19 and Revise sanction as per new UDCPR Rule. |
MahaRERA project filing · read 18 July 2026 · registration P52100013230
RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.
| Filing | Own funds | Borrowing | Payments from buyers | Total |
|---|---|---|---|---|
| Estimated plan | ₹286,199,185 | ₹0 | ₹1,144,796,738 | ₹1,430,995,923 |
| Actual raised | ₹0 | ₹0 | ₹675,006,181 | ₹675,006,181 |
MahaRERA project filing · read 18 July 2026 · registration P52100013230
34 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.
MahaRERA project filing · read 18 July 2026 · registration P52100013230
A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.
MahaRERA project filing · read 18 July 2026 · registration P52100013230
Builder and past records
Projects registered under this company
1Pune registrations
These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.
MahaRERA Pune registration records · read 12 July 2026
Past records of sales and unsold homes
22 September 2026
155 marked unsold · 241 sold · 0 booked.
Saved MahaRERA home list
13 September 2026
155 marked unsold · 241 sold · 0 booked.
Saved MahaRERA home list
4 September 2026
155 marked unsold · 241 sold · 0 booked.
Saved MahaRERA home list
18 July 2026
111 marked unsold · 230 sold · 0 booked.
Saved MahaRERA home list
These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.
Project Comparison Report
Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.
2 projects · ₹7,999
3 projects · ₹9,999
Within 1 working day
Didn’t help you decide? Full refund — no questions asked.
Compare project details for free →MahaRERA · registration record · read 12 July 2026
MahaRERA · per-home inventory · read 4 September 2026
This is a past RERA home list, not current availability. It does not give the date each home was sold.
Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.
Open MahaRERA · search P52100013230 ↗