homeonpaper.

Builder’s RERA records,
explained for buyers.

The builder’s RERA record, explained

Nivara Nere Part-1

BVG Five Elements Shelters · P52100014012

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For Nivara Nere Part-1 (P52100014012), 132 of 132 entries were marked unsold in the MahaRERA home list read 4 September 2026.

MahaRERA · per-home inventory · read 4 September 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Inside this registered phase

How do the buildings compare in the record?

132 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · read 4 September 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
Building A600060012.77–20.81 sq m≈ 137–224 sq ft
Building B720072013.12–21.37 sq m≈ 141–230 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

132 listed entries

MahaRERA · per-home inventory · read 4 September 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
1Building A20512.77 sq m≈ 137 sq ftMarked unsoldNot stated
10Building A20512.77 sq m≈ 137 sq ftMarked unsoldNot stated
101Building A112.77 sq m≈ 137 sq ftMarked unsoldNot stated
102Building A112.77 sq m≈ 137 sq ftMarked unsoldNot stated
103Building A112.77 sq m≈ 137 sq ftMarked unsoldNot stated
104Building A112.77 sq m≈ 137 sq ftMarked unsoldNot stated
105Building A112.77 sq m≈ 137 sq ftMarked unsoldNot stated
106Building A112.77 sq m≈ 137 sq ftMarked unsoldNot stated
107Building A112.77 sq m≈ 137 sq ftMarked unsoldNot stated
108Building A112.77 sq m≈ 137 sq ftMarked unsoldNot stated
109Building A112.77 sq m≈ 137 sq ftMarked unsoldNot stated
11Building A20512.77 sq m≈ 137 sq ftMarked unsoldNot stated

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
Building AExcavation100.0%
Building ABasement (if any)100.0%
Building APodiums (if any) 0.0%
Building APlinth100.0%
Building AStilt Floor 100.0%
Building ASlabs of Super Structure100.0%
Building AInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
Building ASanitary Fittings within the flats / premises100.0%
Building AStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Building AExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
Building AInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
Building BExcavation100.0%
Building BBasement (if any)100.0%
Building BPodiums (if any) 0.0%
Building BPlinth100.0%
Building BStilt Floor 100.0%
Building BSlabs of Super Structure100.0%
Building BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
Building BSanitary Fittings within the flats / premises100.0%
Building BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Building BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
Building BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%

MahaRERA project filing · read 18 July 2026 · registration P52100014012

Quarterly filing record

21 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 18 July 2026 · registration P52100014012

Documents named in the filing

  • Promoter PAN · 1 listed
  • Commencement certificate · 1 listed
  • Form 3 — CA certificate · 1 listed
  • Form 2 — Engineer's certificate · 1 listed
  • Form B — Promoter declaration · 2 listed
  • Title / search report · 1 listed
  • Sanctioned building plan · 7 listed
  • Sanctioned layout plan · 1 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 18 July 2026 · registration P52100014012

Builder and past records

What else does the record show?

Projects registered under this company

BVG Five Elements Shelters

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

    Past records of sales and unsold homes

    1. 22 September 2026

      132 marked unsold · 0 sold · 0 booked.

      Saved MahaRERA home list

    2. 13 September 2026

      132 marked unsold · 0 sold · 0 booked.

      Saved MahaRERA home list

    3. 4 September 2026

      132 marked unsold · 0 sold · 0 booked.

      Saved MahaRERA home list

    These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

    More projects to explore

    Other projects in this locality.

    These projects list the same locality. They may differ in exact location, home type and price.

    Project Comparison Report

    Which project should you buy in?
    And which home?

    Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 12 July 2026

    MahaRERA · per-home inventory · read 4 September 2026

    This is a past RERA home list, not current availability. It does not give the date each home was sold.

    Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

    Open MahaRERA · search P52100014012 ↗
    homeonpaper