homeonpaper.

Builder’s RERA records,
explained for buyers.

The builder’s RERA record, explained

Flamingo city of Valley Phase 1

FLAMINGO CONSTRUCTIONS PRIVATE LIMITED · P52100014608

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For Flamingo city of Valley Phase 1 (P52100014608), 214 of 214 entries were marked unsold in the MahaRERA unit list read 4 September 2026.

MahaRERA · per-unit inventory · read 4 September 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find units to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular unit

See its advantages, drawbacks and how it compares with other units in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended units in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Inside this registered phase

How do the buildings compare in the record?

214 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-unit inventory · read 4 September 2026

Scroll sideways to see all columns.

Building names, sale status and filed areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded filed-area range
PLOT214002140237.97–7,013.50 sq m≈ 2,561–75,493 sq ft

Area means carpet area for building units and plot area for plots. Size alone does not establish use or layout. How we read and summarise the filing →

Unit Report

Is this the right
unit for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar units and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your unit in the RERA list.

The same unit number may appear in more than one building. Check both before choosing.

214 listed entries

MahaRERA · per-unit inventory · read 4 September 2026

RERA unit list, not current availability
Unit / buildingFloor in the recordFiled areaReported statusAgreement valueAssess
FB I 23PLOT / Wing NA2054031.16 sq m≈ 43,391 sq ft · RERA carpet areaMarked unsoldNot stated
FB I 24PLOT / Wing NA2054008.44 sq m≈ 43,146 sq ft · RERA carpet areaMarked unsoldNot stated
FB I 30PLOT / Wing NA2055087.42 sq m≈ 54,761 sq ft · RERA carpet areaMarked unsoldNot stated
FB I 31PLOT / Wing NA2055065.3 sq m≈ 54,522 sq ft · RERA carpet areaMarked unsoldNot stated
FB I 32PLOT / Wing NA2054050.7 sq m≈ 43,601 sq ft · RERA carpet areaMarked unsoldNot stated
FB I 33PLOT / Wing NA2054012.59 sq m≈ 43,191 sq ft · RERA carpet areaMarked unsoldNot stated
FB I 34PLOT / Wing NA2056664.64 sq m≈ 71,738 sq ft · RERA carpet areaMarked unsoldNot stated
FB I 35PLOT / Wing NA2054018.38 sq m≈ 43,253 sq ft · RERA carpet areaMarked unsoldNot stated
FB I 36PLOT / Wing NA2054876.81 sq m≈ 52,494 sq ft · RERA carpet areaMarked unsoldNot stated
FB I 37PLOT / Wing NA2054854.0 sq m≈ 52,248 sq ft · RERA carpet areaMarked unsoldNot stated
FB I 39PLOT / Wing NA2054040.67 sq m≈ 43,493 sq ft · RERA carpet areaMarked unsoldNot stated
FB I 45PLOT / Wing NA2054058.33 sq m≈ 43,684 sq ft · RERA carpet areaMarked unsoldNot stated

Read every entry in one table: Read the complete saved unit list.

Choose the unit you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
PLOTExcavation25.0%
PLOTBasement (if any)5.0%
PLOTPodiums (if any) 0.0%
PLOTPlinth5.0%
PLOTStilt Floor 0.0%
PLOTSlabs of Super Structure3.0%
PLOTInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
PLOTSanitary Fittings within the flats / premises100.0%
PLOTStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
PLOTExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
PLOTInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 18 July 2026 · registration P52100014608

Reported deadline extensions

Revised targetReason given by the builder
31 December 2027We would like to inform the Authority that the development on site is under process and is expected to be completed by 31/12/27. There are no allottees in our project as no plots are sold. So, consent of allottees is not applicable. Hence, we request you to extend proposed date of completion for the Project from 30/12/2023 to revised completion date of 31/12/2027

MahaRERA project filing · read 18 July 2026 · registration P52100014608

Quarterly filing record

37 elapsed quarterly periods in the captured compliance schedule. Active default was recorded for FY 2025-2026.

MahaRERA project filing · read 18 July 2026 · registration P52100014608

Documents named in the filing

  • Form 1 — Architect's certificate · 18 listed
  • Form 3 — CA certificate · 18 listed
  • Form 2 — Engineer's certificate · 17 listed
  • Form B — Promoter declaration · 2 listed
  • Title / search report · 3 listed
  • Sanctioned building plan · 5 listed
  • Sanctioned layout plan · 5 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 18 July 2026 · registration P52100014608

Builder and past records

What else does the record show?

Projects registered under this company

FLAMINGO CONSTRUCTIONS PRIVATE LIMITED

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

    Past records of sales and unsold units

    1. 1 October 2026

      214 marked unsold · 0 sold · 0 booked.

      Saved MahaRERA unit list

    2. 22 September 2026

      214 marked unsold · 0 sold · 0 booked.

      Saved MahaRERA unit list

    3. 13 September 2026

      214 marked unsold · 0 sold · 0 booked.

      Saved MahaRERA unit list

    4. 4 September 2026

      214 marked unsold · 0 sold · 0 booked.

      Saved MahaRERA unit list

    These dates show when the records were saved, not when units were sold. Sales may have changed since then, even if the saved counts are the same.

    Project Comparison Report

    Which project should you buy in?
    And which unit?

    Compare up to three projects. We read their plans and RERA documents, recommend units in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 12 July 2026

    MahaRERA · per-unit inventory · read 4 September 2026

    This is a past RERA unit list, not current availability. It does not give the date each unit was sold.

    Filed area means carpet area for building units and plot area for plots. Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

    Open MahaRERA · search P52100014608 ↗
    homeonpaper