homeonpaper.

Builder’s RERA records,
explained for buyers.

The builder’s RERA record, explained

RAJ APOORVAM

CRYSTAL LANDMARK · P52100016102

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For RAJ APOORVAM (P52100016102), 66 of 131 entries were marked unsold in the MahaRERA home list read 8 September 2026.

MahaRERA · per-home inventory · read 8 September 2026

For RAJ APOORVAM, ₹5,772 per sq ft of carpet area is the median rate across 29 sold or booked entries with prices in the MahaRERA home list read 8 September 2026. These are historical agreement values, not current asking prices.

MahaRERA · per-home inventory · read 8 September 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹5,772/ sq ft carpet area

Across 29 sold or booked entries with reported prices. The middle 80% of rates fall between ₹3,768 and ₹6,015.

MahaRERA · per-home inventory · read 8 September 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar homes sell for?

Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

131 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · read 8 September 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
A1091115562732.03–48.82 sq m≈ 345–525 sq ft
B100010032.19–48.82 sq m≈ 346–525 sq ft
COMMERCIAL12300915.20–22.31 sq m≈ 164–240 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

131 listed entries

MahaRERA · per-home inventory · read 8 September 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
1001A1047.36 sq m≈ 510 sq ftMarked unsoldNot stated
1002A1032.03 sq m≈ 345 sq ftMarked unsoldNot stated
1003A1032.03 sq m≈ 345 sq ftMarked unsoldNot stated
1004A1043.25 sq m≈ 466 sq ftMarked unsoldNot stated
1005A1047.36 sq m≈ 510 sq ftSold₹2,500,000
1006A1047.9 sq m≈ 516 sq ftMarked unsoldNot stated
1007A1043.01 sq m≈ 463 sq ftMarked unsoldNot stated
1008A1032.19 sq m≈ 346 sq ftMarked unsoldNot stated
1009A1032.19 sq m≈ 346 sq ftMarked unsoldNot stated
101A147.36 sq m≈ 510 sq ftMarked unsoldNot stated
1010A1048.82 sq m≈ 525 sq ftMarked unsoldNot stated
102A132.03 sq m≈ 345 sq ftNot for saleNot stated

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹3,260,627 of an estimated ₹167,500,000 was reported as incurred (1.9%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 18 July 2026 · registration P52100016102

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
AExcavation100.0%
ABasement (if any)0.0%
APodiums (if any) 0.0%
APlinth100.0%
AStilt Floor 100.0%
ASlabs of Super Structure25.0%
AInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
ASanitary Fittings within the flats / premises0.0%
AStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
AExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
AInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
COMMERCIALExcavation100.0%
COMMERCIALBasement (if any)0.0%
COMMERCIALPodiums (if any) 0.0%
COMMERCIALPlinth100.0%
COMMERCIALStilt Floor 100.0%
COMMERCIALSlabs of Super Structure100.0%
COMMERCIALInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
COMMERCIALSanitary Fittings within the flats / premises0.0%
COMMERCIALStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
COMMERCIALExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
COMMERCIALInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BExcavation0.0%
BBasement (if any)0.0%
BPodiums (if any) 0.0%
BPlinth0.0%
BStilt Floor 0.0%
BSlabs of Super Structure0.0%
BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BSanitary Fittings within the flats / premises0.0%
BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 18 July 2026 · registration P52100016102

Reported deadline extensions

Revised targetReason given by the builder
31 December 2027Due to Covid there was a long stoppage of work on site. The project is situated in Chakan Industrial area. Post Covid many of the industries closed down and there was no demand for real estate. The feasibility of the project came into difficulties and the partners could not arrange financial closure of the project. The partners have now made adequate financial arrangements to ensure that the project can be completed successfully.

MahaRERA project filing · read 18 July 2026 · registration P52100016102

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹21,370,000₹0₹192,330,000₹213,700,000
Actual raised₹18,300,000₹0₹7,971,160₹26,271,160

MahaRERA project filing · read 18 July 2026 · registration P52100016102

Quarterly filing record

32 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 18 July 2026 · registration P52100016102

Documents named in the filing

  • Promoter PAN · 1 listed
  • Form 3 — CA certificate · 1 listed
  • Form B — Promoter declaration · 1 listed
  • Title / search report · 1 listed
  • Sanctioned building plan · 10 listed
  • Sanctioned layout plan · 10 listed
  • Form 1 — Architect's certificate · 1 listed
  • Form 2 — Engineer's certificate · 1 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 18 July 2026 · registration P52100016102

Builder and past records

What else does the record show?

Projects registered under this company

CRYSTAL LANDMARK

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

    Past records of sales and unsold homes

    1. 25 September 2026

      66 marked unsold · 14 sold · 15 booked.

      Saved MahaRERA home list

    2. 17 September 2026

      66 marked unsold · 14 sold · 15 booked.

      Saved MahaRERA home list

    3. 8 September 2026

      66 marked unsold · 14 sold · 15 booked.

      Saved MahaRERA home list

    4. 18 July 2026

      81 marked unsold · 14 sold · 0 booked.

      Saved MahaRERA home list

    These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

    Project Comparison Report

    Which project should you buy in?
    And which home?

    Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 12 July 2026

    MahaRERA · per-home inventory · read 8 September 2026

    This is a past RERA home list, not current availability. It does not give the date each home was sold.

    Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

    Open MahaRERA · search P52100016102 ↗
    homeonpaper