homeonpaper.

Builder’s RERA records,
explained for buyers.

The builder’s RERA record, explained

ATHARVA SHRUSHTI WING B AND C

ATHARVA BUILDCON · P52100016289

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For ATHARVA SHRUSHTI WING B AND C (P52100016289), 20 of 239 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).

MahaRERA · per-home inventory · saved-file date 18 July 2026

For ATHARVA SHRUSHTI WING B AND C, ₹4,909 per sq ft of carpet area is the median rate across 92 sold or booked entries with prices in the MahaRERA home list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.

MahaRERA · per-home inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹4,909/ sq ft carpet area

Across 92 sold or booked entries with reported prices. The middle 80% of rates fall between ₹4,724 and ₹6,655.

MahaRERA · per-home inventory · saved-file date 18 July 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar homes sell for?

Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

239 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
ATHARVA SHRUSHTI PHASE II WING B10905625134.75–49.52 sq m≈ 374–533 sq ft
ATHARVA SHRUSHTI PHASE II WING C10903617235.21–52.22 sq m≈ 379–562 sq ft
Signature Greens - Wing D - Bungalow10010246.68 sq m≈ 2,655 sq ft
Signature Greens - Wing F - Row House10008298.90–122.29 sq m≈ 1,065–1,316 sq ft
Signature Greens - Wing G - Row House100082107.45–108.75 sq m≈ 1,157–1,171 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

239 listed entries

MahaRERA · per-home inventory · saved-file date 18 July 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
1001ATHARVA SHRUSHTI PHASE II WING B1048.78 sq m≈ 525 sq ftBooked₹2,570,700
1002ATHARVA SHRUSHTI PHASE II WING B1035.21 sq m≈ 379 sq ftBooked₹2,100,000
1003ATHARVA SHRUSHTI PHASE II WING B1035.21 sq m≈ 379 sq ftNot for saleNot stated
1004ATHARVA SHRUSHTI PHASE II WING B1035.21 sq m≈ 379 sq ftNot for saleNot stated
1005ATHARVA SHRUSHTI PHASE II WING B1049.52 sq m≈ 533 sq ftBooked₹2,598,600
1006ATHARVA SHRUSHTI PHASE II WING B1048.78 sq m≈ 525 sq ftBooked₹3,000,000
1007ATHARVA SHRUSHTI PHASE II WING B1034.75 sq m≈ 374 sq ftBooked₹2,000,000
1008ATHARVA SHRUSHTI PHASE II WING B1034.75 sq m≈ 374 sq ftNot for saleNot stated
1009ATHARVA SHRUSHTI PHASE II WING B1034.75 sq m≈ 374 sq ftNot for saleNot stated
101ATHARVA SHRUSHTI PHASE II WING B149.52 sq m≈ 533 sq ftBooked₹2,598,600
1010ATHARVA SHRUSHTI PHASE II WING B1049.52 sq m≈ 533 sq ftBooked₹2,518,000
102ATHARVA SHRUSHTI PHASE II WING B135.77 sq m≈ 385 sq ftBooked₹2,600,000

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹644,135,126 of an estimated ₹739,209,300 was reported as incurred (87.1%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 19 July 2026 · registration P52100016289

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
ATHARVA SHRUSHTI PHASE II WING BExcavation100.0%
ATHARVA SHRUSHTI PHASE II WING BBasement (if any)100.0%
ATHARVA SHRUSHTI PHASE II WING BPodiums (if any) 100.0%
ATHARVA SHRUSHTI PHASE II WING BPlinth100.0%
ATHARVA SHRUSHTI PHASE II WING BStilt Floor 0.0%
ATHARVA SHRUSHTI PHASE II WING BSlabs of Super Structure100.0%
ATHARVA SHRUSHTI PHASE II WING BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
ATHARVA SHRUSHTI PHASE II WING BSanitary Fittings within the flats / premises100.0%
ATHARVA SHRUSHTI PHASE II WING BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
ATHARVA SHRUSHTI PHASE II WING BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
ATHARVA SHRUSHTI PHASE II WING BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
ATHARVA SHRUSHTI PHASE II WING CExcavation100.0%
ATHARVA SHRUSHTI PHASE II WING CBasement (if any)100.0%
ATHARVA SHRUSHTI PHASE II WING CPodiums (if any) 100.0%
ATHARVA SHRUSHTI PHASE II WING CPlinth100.0%
ATHARVA SHRUSHTI PHASE II WING CStilt Floor 0.0%
ATHARVA SHRUSHTI PHASE II WING CSlabs of Super Structure100.0%
ATHARVA SHRUSHTI PHASE II WING CInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50.0%
ATHARVA SHRUSHTI PHASE II WING CSanitary Fittings within the flats / premises0.0%
ATHARVA SHRUSHTI PHASE II WING CStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
ATHARVA SHRUSHTI PHASE II WING CExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
ATHARVA SHRUSHTI PHASE II WING CInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Signature Greens - Wing D - BungalowExcavation0.0%
Signature Greens - Wing D - BungalowPlinth0.0%
Signature Greens - Wing D - BungalowSlabs of Super Structure0.0%
Signature Greens - Wing D - BungalowInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Signature Greens - Wing D - BungalowSanitary Fittings within the flats / premises0.0%
Signature Greens - Wing D - BungalowStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Signature Greens - Wing D - BungalowExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Signature Greens - Wing D - BungalowInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Signature Greens - Wing F - Row HouseExcavation0.0%
Signature Greens - Wing F - Row HousePlinth0.0%
Signature Greens - Wing F - Row HouseSlabs of Super Structure0.0%
Signature Greens - Wing F - Row HouseInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Signature Greens - Wing F - Row HouseSanitary Fittings within the flats / premises0.0%
Signature Greens - Wing F - Row HouseStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Signature Greens - Wing F - Row HouseExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Signature Greens - Wing F - Row HouseInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Signature Greens - Wing G - Row House Excavation0.0%
Signature Greens - Wing G - Row House Plinth0.0%
Signature Greens - Wing G - Row House Slabs of Super Structure0.0%
Signature Greens - Wing G - Row House Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Signature Greens - Wing G - Row House Sanitary Fittings within the flats / premises0.0%
Signature Greens - Wing G - Row House Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Signature Greens - Wing G - Row House External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Signature Greens - Wing G - Row House Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 19 July 2026 · registration P52100016289

Reported deadline extensions

Revised targetReason given by the builder
30 April 2025We apply for extension of the following project Atharva Shrushti Wing B and C registered with the regulatory authority vide project registration certificate bearing no. P52100016289 which expired on 30/04/2024. We request you to grant extension of RERA Registration for a further period of 12 months i.e. upto 30/04/2025.
30 April 2026We are applying for the extension of this project due to pending parking work due to unavoidable circumstances which adversely affected our construction schedule. The Project has been affected by the shortage of skilled labour force due to the recent festive seasons. Shortage of raw material has also resulted into the delay of the construction. As per the above-mentioned course of action the work will be completed well within the time requested for extension and we will receive the Completion/Occupancy certificate on or before 30/04/2026 i.e before the date of extension requested.
30 April 2031The project requires extension due to the grant and incorporation of additional FSI (Floor Space Index) by the Competent Authority after initial registration. The utilization of the additional FSI necessitated revision of sanctioned plans, architectural layouts, and structural designs. Consequently, amended approvals and a revised Commencement Certificate were required. The process also involved revalidation of statutory permissions and modification of construction planning. These regulatory and technical procedures consumed substantial time, impacting the original project schedule. The delay is procedural in nature and not due to any financial default. The Promoter remains committed to completing the project within the revised timeline and therefore seeks extension of the project registration period.

MahaRERA project filing · read 19 July 2026 · registration P52100016289

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Actual raised₹56,410,831₹0₹206,184,108₹262,594,939

MahaRERA project filing · read 19 July 2026 · registration P52100016289

Quarterly filing record

29 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 19 July 2026 · registration P52100016289

Documents named in the filing

  • Commencement certificate · 2 listed
  • Form 1 — Architect's certificate · 1 listed
  • Form 3 — CA certificate · 1 listed
  • Form 2 — Engineer's certificate · 1 listed
  • Title / search report · 1 listed
  • Form B — Promoter declaration · 2 listed
  • Sanctioned layout plan · 3 listed
  • Sanctioned building plan · 17 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100016289

Builder and past records

What else does the record show?

Projects registered under this company

ATHARVA BUILDCON

2Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

Past records of sales and unsold homes

  1. 25 September 2026

    20 marked unsold · 0 sold · 92 booked.

    Saved MahaRERA home list

  2. 17 September 2026

    20 marked unsold · 0 sold · 92 booked.

    Saved MahaRERA home list

  3. 8 September 2026

    20 marked unsold · 0 sold · 92 booked.

    Saved MahaRERA home list

  4. 19 July 2026

    20 marked unsold · 0 sold · 92 booked.

    Saved MahaRERA home list

These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

Project Comparison Report

Which project should you buy in?
And which home?

Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

Create my Comparison Report →

2 projects · ₹7,999
3 projects · ₹9,999

Within 1 working day

Didn’t help you decide? Full refund — no questions asked.

Compare project details for free →

Sources and dates.

MahaRERA · registration record · read 12 July 2026

MahaRERA · per-home inventory · saved-file date 18 July 2026

This is a past RERA home list, not current availability. It does not give the date each home was sold.

The home-list date is based on the saved file’s details.

Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.