ATHARVA BUILDCON · P52100016289
For ATHARVA SHRUSHTI WING B AND C (P52100016289), 20 of 239 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).
MahaRERA · per-home inventory · saved-file date 18 July 2026
For ATHARVA SHRUSHTI WING B AND C, ₹4,909 per sq ft of carpet area is the median rate across 92 sold or booked entries with prices in the MahaRERA home list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.
MahaRERA · per-home inventory · saved-file date 18 July 2026
These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.
Builder’s completion target
The builder reported this target date. It is not a confirmed handover date.
Status shown on RERA
This is the status shown on RERA. It does not confirm an occupancy certificate or today’s construction progress.
Prices reported to RERA
₹4,909/ sq ft carpet area
Across 92 sold or booked entries with reported prices. The middle 80% of rates fall between ₹4,724 and ₹6,655.
MahaRERA · per-home inventory · saved-file date 18 July 2026
For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.
Sales Report
Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.
Inside this registered phase
239 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.
MahaRERA · per-home inventory · saved-file date 18 July 2026
Scroll sideways to see all columns.
| Filed building | Entries | Sold | Booked | Marked unsold | Other / unstated status | Recorded carpet-area range |
|---|---|---|---|---|---|---|
| ATHARVA SHRUSHTI PHASE II WING B | 109 | 0 | 56 | 2 | 51 | 34.75–49.52 sq m≈ 374–533 sq ft |
| ATHARVA SHRUSHTI PHASE II WING C | 109 | 0 | 36 | 1 | 72 | 35.21–52.22 sq m≈ 379–562 sq ft |
| Signature Greens - Wing D - Bungalow | 1 | 0 | 0 | 1 | 0 | 246.68 sq m≈ 2,655 sq ft |
| Signature Greens - Wing F - Row House | 10 | 0 | 0 | 8 | 2 | 98.90–122.29 sq m≈ 1,065–1,316 sq ft |
| Signature Greens - Wing G - Row House | 10 | 0 | 0 | 8 | 2 | 107.45–108.75 sq m≈ 1,157–1,171 sq ft |
Different sizes are not necessarily different bedroom types. How we read and summarise the filing →
Unit Report
Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.
Didn’t help you decide? Full refund — no questions asked.
The same home number may appear in more than one building. Check both before choosing.
MahaRERA · per-home inventory · saved-file date 18 July 2026
| Home / building | Floor in the record | Carpet area | Reported status | Agreement value | Assess |
|---|---|---|---|---|---|
| 1001ATHARVA SHRUSHTI PHASE II WING B | 10 | 48.78 sq m≈ 525 sq ft | Booked | ₹2,570,700 | |
| 1002ATHARVA SHRUSHTI PHASE II WING B | 10 | 35.21 sq m≈ 379 sq ft | Booked | ₹2,100,000 | |
| 1003ATHARVA SHRUSHTI PHASE II WING B | 10 | 35.21 sq m≈ 379 sq ft | Not for sale | Not stated | |
| 1004ATHARVA SHRUSHTI PHASE II WING B | 10 | 35.21 sq m≈ 379 sq ft | Not for sale | Not stated | |
| 1005ATHARVA SHRUSHTI PHASE II WING B | 10 | 49.52 sq m≈ 533 sq ft | Booked | ₹2,598,600 | |
| 1006ATHARVA SHRUSHTI PHASE II WING B | 10 | 48.78 sq m≈ 525 sq ft | Booked | ₹3,000,000 | |
| 1007ATHARVA SHRUSHTI PHASE II WING B | 10 | 34.75 sq m≈ 374 sq ft | Booked | ₹2,000,000 | |
| 1008ATHARVA SHRUSHTI PHASE II WING B | 10 | 34.75 sq m≈ 374 sq ft | Not for sale | Not stated | |
| 1009ATHARVA SHRUSHTI PHASE II WING B | 10 | 34.75 sq m≈ 374 sq ft | Not for sale | Not stated | |
| 101ATHARVA SHRUSHTI PHASE II WING B | 1 | 49.52 sq m≈ 533 sq ft | Booked | ₹2,598,600 | |
| 1010ATHARVA SHRUSHTI PHASE II WING B | 10 | 49.52 sq m≈ 533 sq ft | Booked | ₹2,518,000 | |
| 102ATHARVA SHRUSHTI PHASE II WING B | 1 | 35.77 sq m≈ 385 sq ft | Booked | ₹2,600,000 |
Read every entry in one table: Read the complete saved home list.
Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.
More from the RERA documents
₹644,135,126 of an estimated ₹739,209,300 was reported as incurred (87.1%). This percentage is about costs. It does not show how much construction is complete.
MahaRERA project filing · read 19 July 2026 · registration P52100016289
Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.
| Building | Activity | Reported |
|---|---|---|
| ATHARVA SHRUSHTI PHASE II WING B | Excavation | 100.0% |
| ATHARVA SHRUSHTI PHASE II WING B | Basement (if any) | 100.0% |
| ATHARVA SHRUSHTI PHASE II WING B | Podiums (if any) | 100.0% |
| ATHARVA SHRUSHTI PHASE II WING B | Plinth | 100.0% |
| ATHARVA SHRUSHTI PHASE II WING B | Stilt Floor | 0.0% |
| ATHARVA SHRUSHTI PHASE II WING B | Slabs of Super Structure | 100.0% |
| ATHARVA SHRUSHTI PHASE II WING B | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| ATHARVA SHRUSHTI PHASE II WING B | Sanitary Fittings within the flats / premises | 100.0% |
| ATHARVA SHRUSHTI PHASE II WING B | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| ATHARVA SHRUSHTI PHASE II WING B | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| ATHARVA SHRUSHTI PHASE II WING B | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| ATHARVA SHRUSHTI PHASE II WING C | Excavation | 100.0% |
| ATHARVA SHRUSHTI PHASE II WING C | Basement (if any) | 100.0% |
| ATHARVA SHRUSHTI PHASE II WING C | Podiums (if any) | 100.0% |
| ATHARVA SHRUSHTI PHASE II WING C | Plinth | 100.0% |
| ATHARVA SHRUSHTI PHASE II WING C | Stilt Floor | 0.0% |
| ATHARVA SHRUSHTI PHASE II WING C | Slabs of Super Structure | 100.0% |
| ATHARVA SHRUSHTI PHASE II WING C | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50.0% |
| ATHARVA SHRUSHTI PHASE II WING C | Sanitary Fittings within the flats / premises | 0.0% |
| ATHARVA SHRUSHTI PHASE II WING C | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| ATHARVA SHRUSHTI PHASE II WING C | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| ATHARVA SHRUSHTI PHASE II WING C | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| Signature Greens - Wing D - Bungalow | Excavation | 0.0% |
| Signature Greens - Wing D - Bungalow | Plinth | 0.0% |
| Signature Greens - Wing D - Bungalow | Slabs of Super Structure | 0.0% |
| Signature Greens - Wing D - Bungalow | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| Signature Greens - Wing D - Bungalow | Sanitary Fittings within the flats / premises | 0.0% |
| Signature Greens - Wing D - Bungalow | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| Signature Greens - Wing D - Bungalow | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| Signature Greens - Wing D - Bungalow | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| Signature Greens - Wing F - Row House | Excavation | 0.0% |
| Signature Greens - Wing F - Row House | Plinth | 0.0% |
| Signature Greens - Wing F - Row House | Slabs of Super Structure | 0.0% |
| Signature Greens - Wing F - Row House | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| Signature Greens - Wing F - Row House | Sanitary Fittings within the flats / premises | 0.0% |
| Signature Greens - Wing F - Row House | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| Signature Greens - Wing F - Row House | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| Signature Greens - Wing F - Row House | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| Signature Greens - Wing G - Row House | Excavation | 0.0% |
| Signature Greens - Wing G - Row House | Plinth | 0.0% |
| Signature Greens - Wing G - Row House | Slabs of Super Structure | 0.0% |
| Signature Greens - Wing G - Row House | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| Signature Greens - Wing G - Row House | Sanitary Fittings within the flats / premises | 0.0% |
| Signature Greens - Wing G - Row House | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| Signature Greens - Wing G - Row House | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| Signature Greens - Wing G - Row House | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
MahaRERA project filing · read 19 July 2026 · registration P52100016289
| Revised target | Reason given by the builder |
|---|---|
| 30 April 2025 | We apply for extension of the following project Atharva Shrushti Wing B and C registered with the regulatory authority vide project registration certificate bearing no. P52100016289 which expired on 30/04/2024. We request you to grant extension of RERA Registration for a further period of 12 months i.e. upto 30/04/2025. |
| 30 April 2026 | We are applying for the extension of this project due to pending parking work due to unavoidable circumstances which adversely affected our construction schedule. The Project has been affected by the shortage of skilled labour force due to the recent festive seasons. Shortage of raw material has also resulted into the delay of the construction. As per the above-mentioned course of action the work will be completed well within the time requested for extension and we will receive the Completion/Occupancy certificate on or before 30/04/2026 i.e before the date of extension requested. |
| 30 April 2031 | The project requires extension due to the grant and incorporation of additional FSI (Floor Space Index) by the Competent Authority after initial registration. The utilization of the additional FSI necessitated revision of sanctioned plans, architectural layouts, and structural designs. Consequently, amended approvals and a revised Commencement Certificate were required. The process also involved revalidation of statutory permissions and modification of construction planning. These regulatory and technical procedures consumed substantial time, impacting the original project schedule. The delay is procedural in nature and not due to any financial default. The Promoter remains committed to completing the project within the revised timeline and therefore seeks extension of the project registration period. |
MahaRERA project filing · read 19 July 2026 · registration P52100016289
RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.
| Filing | Own funds | Borrowing | Payments from buyers | Total |
|---|---|---|---|---|
| Actual raised | ₹56,410,831 | ₹0 | ₹206,184,108 | ₹262,594,939 |
MahaRERA project filing · read 19 July 2026 · registration P52100016289
29 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.
MahaRERA project filing · read 19 July 2026 · registration P52100016289
A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.
MahaRERA project filing · read 19 July 2026 · registration P52100016289
Builder and past records
Projects registered under this company
2Pune registrations
These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.
MahaRERA Pune registration records · read 12 July 2026
Past records of sales and unsold homes
25 September 2026
20 marked unsold · 0 sold · 92 booked.
Saved MahaRERA home list
17 September 2026
20 marked unsold · 0 sold · 92 booked.
Saved MahaRERA home list
8 September 2026
20 marked unsold · 0 sold · 92 booked.
Saved MahaRERA home list
19 July 2026
20 marked unsold · 0 sold · 92 booked.
Saved MahaRERA home list
These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.
Project Comparison Report
Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.
2 projects · ₹7,999
3 projects · ₹9,999
Within 1 working day
Didn’t help you decide? Full refund — no questions asked.
Compare project details for free →MahaRERA · registration record · read 12 July 2026
MahaRERA · per-home inventory · saved-file date 18 July 2026
This is a past RERA home list, not current availability. It does not give the date each home was sold.
The home-list date is based on the saved file’s details.
Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.
Open MahaRERA · search P52100016289 ↗