The builder’s RERA record, explained

Renuka Gloria

Renuka Constructions · P52100016508

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For Renuka Gloria (P52100016508), 191 of 638 entries were marked unsold in the MahaRERA home list read 8 September 2026.

MahaRERA · per-home inventory · read 8 September 2026

For Renuka Gloria, ₹8,102 per sq ft of carpet area is the median rate across 404 sold or booked entries with prices in the MahaRERA home list read 8 September 2026. These are historical agreement values, not current asking prices.

MahaRERA · per-home inventory · read 8 September 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹8,102/ sq ft carpet area

Across 404 sold or booked entries with reported prices. The middle 80% of rates fall between ₹3,588 and ₹9,217.

MahaRERA · per-home inventory · read 8 September 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar homes sell for?

Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

638 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · read 8 September 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
Building A433903176.11–79.99 sq m≈ 819–861 sq ft
Building B6452001234.62–38.26 sq m≈ 373–412 sq ft
Building C645900552.45–54.34 sq m≈ 565–585 sq ft
Building D10710600137.84–54.74 sq m≈ 407–589 sq ft
Building E118930111442.37–61.68 sq m≈ 456–664 sq ft
Building F189201771021.60–92.37 sq m≈ 233–994 sq ft
Mahad Build H535300036.40–48.14 sq m≈ 392–518 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

638 listed entries

MahaRERA · per-home inventory · read 8 September 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
A-1001Building A1079.99 sq m≈ 861 sq ftSold₹6,500,000
A-1002Building A1079.99 sq m≈ 861 sq ftSold₹7,100,000
A-1003Building A1079.53 sq m≈ 856 sq ftSold₹7,500,000
A-1004Building A1076.11 sq m≈ 819 sq ftSold₹7,100,000
A-101Building A179.99 sq m≈ 861 sq ftSold₹10,500,000
A-102Building A179.99 sq m≈ 861 sq ftSold₹8,000,000
A-103Building A179.79 sq m≈ 859 sq ftSold₹9,318,000
A-104Building A176.25 sq m≈ 821 sq ftSold₹5,550,000
A-1101Building A1179.99 sq m≈ 861 sq ftSold₹7,300,000
A-1102Building A1179.99 sq m≈ 861 sq ftSold₹8,700,000
A-1103Building A1179.79 sq m≈ 859 sq ftSold₹7,200,000
A-1104Building A1176.25 sq m≈ 821 sq ftMarked unsoldNot stated

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹1,305,020,080 of an estimated ₹1,612,424,660 was reported as incurred (80.9%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 19 July 2026 · registration P52100016508

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
Building AExcavation100.0%
Building ABasement (if any)100.0%
Building APodiums (if any) 0.0%
Building APlinth100.0%
Building AStilt Floor 100.0%
Building ASlabs of Super Structure100.0%
Building AInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
Building ASanitary Fittings within the flats / premises100.0%
Building AStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Building AExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
Building AInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
Building BExcavation100.0%
Building BBasement (if any)100.0%
Building BPodiums (if any) 0.0%
Building BPlinth100.0%
Building BStilt Floor 100.0%
Building BSlabs of Super Structure100.0%
Building BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
Building BSanitary Fittings within the flats / premises100.0%
Building BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Building BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
Building BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
Building CExcavation100.0%
Building CBasement (if any)100.0%
Building CPodiums (if any) 0.0%
Building CPlinth100.0%
Building CStilt Floor 100.0%
Building CSlabs of Super Structure100.0%
Building CInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
Building CSanitary Fittings within the flats / premises100.0%
Building CStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Building CExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
Building CInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
Building DExcavation100.0%
Building DBasement (if any)100.0%
Building DPodiums (if any) 0.0%
Building DPlinth100.0%
Building DStilt Floor 100.0%
Building DSlabs of Super Structure100.0%
Building DInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
Building DSanitary Fittings within the flats / premises100.0%
Building DStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Building DExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
Building DInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
Building EExcavation100.0%
Building EBasement (if any)100.0%
Building EPodiums (if any) 100.0%
Building EPlinth100.0%
Building EStilt Floor 100.0%
Building ESlabs of Super Structure100.0%
Building EInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
Building ESanitary Fittings within the flats / premises90.0%
Building EStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Building EExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
Building EInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
Building FExcavation100.0%
Building FBasement (if any)100.0%
Building FPodiums (if any) 0.0%
Building FPlinth100.0%
Building FStilt Floor 100.0%
Building FSlabs of Super Structure80.0%
Building FInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25.0%
Building FSanitary Fittings within the flats / premises0.0%
Building FStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Building FExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Building FInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Building G Proposed but not santionedExcavation0.0%
Building G Proposed but not santionedBasement (if any)0.0%
Building G Proposed but not santionedPodiums (if any) 0.0%
Building G Proposed but not santionedPlinth0.0%
Building G Proposed but not santionedStilt Floor 0.0%
Building G Proposed but not santionedSlabs of Super Structure0.0%
Building G Proposed but not santionedInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Building G Proposed but not santionedSanitary Fittings within the flats / premises0.0%
Building G Proposed but not santionedStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Building G Proposed but not santionedExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Building G Proposed but not santionedInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Mahad Build HExcavation100.0%
Mahad Build HBasement (if any)100.0%
Mahad Build HPodiums (if any) 0.0%
Mahad Build HPlinth100.0%
Mahad Build HStilt Floor 100.0%
Mahad Build HSlabs of Super Structure100.0%
Mahad Build HInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
Mahad Build HSanitary Fittings within the flats / premises100.0%
Mahad Build HStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Mahad Build HExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
Mahad Build HInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%

MahaRERA project filing · read 19 July 2026 · registration P52100016508

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹77,012,436₹810,600,000₹858,309,356₹1,745,921,792
Actual raised₹237,418,913₹1,965,329₹969,983,593₹1,586,669,436

MahaRERA project filing · read 19 July 2026 · registration P52100016508

Quarterly filing record

31 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 19 July 2026 · registration P52100016508

Documents named in the filing

  • Promoter PAN · 1 listed
  • Form 1 — Architect's certificate · 2 listed
  • Form 3 — CA certificate · 1 listed
  • Form 2 — Engineer's certificate · 3 listed
  • Title / search report · 6 listed
  • Form B — Promoter declaration · 1 listed
  • Sanctioned building plan · 87 listed
  • Sanctioned layout plan · 2 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100016508

Builder and past records

What else does the record show?

Projects registered under this company

Renuka Constructions

4Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

Past records of sales and unsold homes

  1. 25 September 2026

    191 marked unsold · 404 sold · 0 booked.

    Saved MahaRERA home list

  2. 17 September 2026

    191 marked unsold · 404 sold · 0 booked.

    Saved MahaRERA home list

  3. 8 September 2026

    191 marked unsold · 404 sold · 0 booked.

    Saved MahaRERA home list

  4. 19 July 2026

    203 marked unsold · 393 sold · 1 booked.

    Saved MahaRERA home list

These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

More projects to explore

Other projects in this locality.

These projects list the same locality. They may differ in exact location, home type and price.

Project Comparison Report

Which project should you buy in?
And which home?

Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

Create my Comparison Report →

2 projects · ₹7,999
3 projects · ₹9,999

Within 1 working day

Didn’t help you decide? Full refund — no questions asked.

Compare project details for free →

Sources and dates.

MahaRERA · registration record · read 12 July 2026

MahaRERA · per-home inventory · read 8 September 2026

This is a past RERA home list, not current availability. It does not give the date each home was sold.

Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.