The builder’s RERA record, explained

Pankaj Aasmaan Phase III

Pankaj Developers · P52100016512

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For Pankaj Aasmaan Phase III (P52100016512), 1 of 120 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).

MahaRERA · per-home inventory · saved-file date 18 July 2026

For Pankaj Aasmaan Phase III, ₹5,935 per sq ft of carpet area is the median rate across 91 sold or booked entries with prices in the MahaRERA home list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.

MahaRERA · per-home inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹5,935/ sq ft carpet area

Across 91 sold or booked entries with reported prices. The middle 80% of rates fall between ₹5,334 and ₹6,573.

MahaRERA · per-home inventory · saved-file date 18 July 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar homes sell for?

Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

120 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
E242000460.54–70.36 sq m≈ 652–757 sq ft
F322901259.35–78.20 sq m≈ 639–842 sq ft
I3218001459.25–78.20 sq m≈ 638–842 sq ft
J322400855.24–78.20 sq m≈ 595–842 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

120 listed entries

MahaRERA · per-home inventory · saved-file date 18 July 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
001E160.54 sq m≈ 652 sq ftSold₹4,084,206
002E170.36 sq m≈ 757 sq ftSold₹4,450,000
003E163.46 sq m≈ 683 sq ftSold₹4,490,000
004E160.55 sq m≈ 652 sq ftSold₹4,103,148
005E163.04 sq m≈ 679 sq ftSold₹4,184,049
006E163.04 sq m≈ 679 sq ftSold₹4,341,783
101E260.55 sq m≈ 652 sq ftNot for saleNot stated
102E270.31 sq m≈ 757 sq ftSold₹4,490,000
103E263.42 sq m≈ 683 sq ftSold₹4,276,582
104E260.55 sq m≈ 652 sq ftSold₹4,490,800
105E263.05 sq m≈ 679 sq ftSold₹4,490,000
106E263.05 sq m≈ 679 sq ftSold₹4,177,570

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹176,254,371 of an estimated ₹179,190,183 was reported as incurred (98.4%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 19 July 2026 · registration P52100016512

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
JExcavation100.0%
JBasement (if any)100.0%
JPodiums (if any) 100.0%
JPlinth100.0%
JStilt Floor 100.0%
JSlabs of Super Structure100.0%
JInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
JSanitary Fittings within the flats / premises100.0%
JStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
JExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
JInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
IExcavation100.0%
IBasement (if any)100.0%
IPodiums (if any) 100.0%
IPlinth100.0%
IStilt Floor 100.0%
ISlabs of Super Structure100.0%
IInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
ISanitary Fittings within the flats / premises100.0%
IStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
IExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
IInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
FExcavation100.0%
FBasement (if any)100.0%
FPodiums (if any) 100.0%
FPlinth100.0%
FStilt Floor 100.0%
FSlabs of Super Structure100.0%
FInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
FSanitary Fittings within the flats / premises100.0%
FStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
FExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
FInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
EExcavation100.0%
EBasement (if any)100.0%
EPodiums (if any) 100.0%
EPlinth100.0%
EStilt Floor 100.0%
ESlabs of Super Structure100.0%
EInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
ESanitary Fittings within the flats / premises100.0%
EStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
EExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
EInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%

MahaRERA project filing · read 19 July 2026 · registration P52100016512

Reported deadline extensions

Revised targetReason given by the builder
30 September 2022I, Anil Ramrao Gogavale Partner of M/s Pankaj Developers having Maha RERA registered project Pankaj Aasmaan Phase III with Maha RERA registration No.P52100016512 hereby declare that while initial registration there was typo error in respect of Proposed Date of Completion. The Proposed Date of Completion as per Maha RERA Registration Certificate was 1-April-2021 which was due to Typo Error and should be considered as 1-April-2022. Further due to COVID–19 pandemic situation the proposed date of completion should be considered as 1-October-2022 after considering universal extension extended to all the projects across Maharashtra State. Further we undertake to complete the project within applied extension time i.e. 364 days from existing completion date. Hence we apply for extension of time limit by 364 days and the proposed completion date will be 30-09-2022.
30 September 2024Due to COVID Pandemic project has been delayed. So we are requesting you to please Extent project completion Date up to 30/09/2024
31 December 2026Respected Sir, We are providing you an update on the construction progress of our project. Despite the challenges of COVID-19 pandemic, We informing you that we have successfully completed 99% of the construction work. Currently, we are working on completing the common amenities and obtaining the completion certificate. We kindly request an extension of our project deadline until December 31, 2026. This extension will allow us to finalize the remaining tasks and ensure the successful completion of the project.

MahaRERA project filing · read 19 July 2026 · registration P52100016512

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹10,000,000₹72,500,000₹224,658,076₹307,158,076
Actual raised₹0₹0₹261,635,083₹261,635,083

MahaRERA project filing · read 19 July 2026 · registration P52100016512

Quarterly filing record

31 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 19 July 2026 · registration P52100016512

Documents named in the filing

  • Promoter PAN · 1 listed
  • Form 1 — Architect's certificate · 2 listed
  • Form 3 — CA certificate · 2 listed
  • Form 2 — Engineer's certificate · 2 listed
  • Form B — Promoter declaration · 6 listed
  • Title / search report · 2 listed
  • Sanctioned layout plan · 1 listed
  • Sanctioned building plan · 8 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100016512

Builder and past records

What else does the record show?

Past records of sales and unsold homes

  1. 19 July 2026

    1 marked unsold · 91 sold · 0 booked.

    Saved MahaRERA home list

  2. 18 July 2026

    1 marked unsold · 91 sold · 0 booked.

    Saved MahaRERA home list, date based on the saved file

These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

Project Comparison Report

Which project should you buy in?
And which home?

Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

Create my Comparison Report →

2 projects · ₹7,999
3 projects · ₹9,999

Within 1 working day

Didn’t help you decide? Full refund — no questions asked.

Compare project details for free →

Sources and dates.

MahaRERA · registration record · read 12 July 2026

MahaRERA · per-home inventory · saved-file date 18 July 2026

This is a past RERA home list, not current availability. It does not give the date each home was sold.

The home-list date is based on the saved file’s details.

Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.