For Tejas Imperial (P52100018270), 133 of 228 entries were marked unsold in the MahaRERA home list read 8 September 2026.
For Tejas Imperial, ₹14,824 per sq ft of carpet area is the median rate across 61 sold or booked entries with prices in the MahaRERA home list read 8 September 2026. These are historical agreement values, not current asking prices.
These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.
Builder’s completion target
The builder reported this target date. It is not a confirmed handover date.
Status shown on RERA
This is the status shown on RERA. It does not confirm an occupancy certificate or today’s construction progress.
Prices reported to RERA
₹14,824/ sq ft carpet area
Across 61 sold or booked entries with reported prices. The middle 80% of rates fall between ₹11,496 and ₹17,769.
MahaRERA · per-home inventory · read 8 September 2026
For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.
Sales Report
Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.
Inside this registered phase
228 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.
MahaRERA · per-home inventory · read 8 September 2026
Scroll sideways to see all columns.
| Filed building | Entries | Sold | Booked | Marked unsold | Other / unstated status | Recorded carpet-area range |
|---|---|---|---|---|---|---|
| Tejas Imperial phase 1 | 228 | 61 | 0 | 133 | 34 | 27.17–229.11 sq m≈ 292–2,466 sq ft |
Different sizes are not necessarily different bedroom types. How we read and summarise the filing →
Unit Report
Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.
Didn’t help you decide? Full refund — no questions asked.
The same home number may appear in more than one building. Check both before choosing.
MahaRERA · per-home inventory · read 8 September 2026
| Home / building | Floor in the record | Carpet area | Reported status | Agreement value | Assess |
|---|---|---|---|---|---|
| 1Tejas Imperial phase 1 | 205 | 100.42 sq m≈ 1,081 sq ft | Sold | ₹26,500,000 | |
| 1Tejas Imperial phase 1 | 205 | 229.11 sq m≈ 2,466 sq ft | Sold | ₹53,000,000 | |
| 1Tejas Imperial phase 1 | 205 | 33.52 sq m≈ 361 sq ft | Owner investor | Not stated | |
| 10Tejas Imperial phase 1 | 205 | 136.17 sq m≈ 1,466 sq ft | Owner investor | Not stated | |
| 1001Tejas Imperial phase 1 | 10 | 39.33 sq m≈ 423 sq ft | Marked unsold | Not stated | |
| 1002Tejas Imperial phase 1 | 10 | 39.33 sq m≈ 423 sq ft | Marked unsold | Not stated | |
| 1003Tejas Imperial phase 1 | 10 | 37.36 sq m≈ 402 sq ft | Marked unsold | Not stated | |
| 1004Tejas Imperial phase 1 | 10 | 41.48 sq m≈ 446 sq ft | Marked unsold | Not stated | |
| 1005Tejas Imperial phase 1 | 10 | 40.22 sq m≈ 433 sq ft | Marked unsold | Not stated | |
| 1006Tejas Imperial phase 1 | 10 | 36.82 sq m≈ 396 sq ft | Marked unsold | Not stated | |
| 1007Tejas Imperial phase 1 | 10 | 27.17 sq m≈ 292 sq ft | Marked unsold | Not stated | |
| 1008Tejas Imperial phase 1 | 10 | 137.39 sq m≈ 1,479 sq ft | Marked unsold | Not stated |
Read every entry in one table: Read the complete saved home list.
Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.
More from the RERA documents
₹974,284,904 of an estimated ₹895,000,000 was reported as incurred (108.9%). This percentage is about costs. It does not show how much construction is complete.
MahaRERA project filing · read 19 July 2026 · registration P52100018270
Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.
| Building | Activity | Reported |
|---|---|---|
| Tejas Imperial phase 1 | Excavation | 100.0% |
| Tejas Imperial phase 1 | Basement (if any) | 100.0% |
| Tejas Imperial phase 1 | Podiums (if any) | 100.0% |
| Tejas Imperial phase 1 | Plinth | 100.0% |
| Tejas Imperial phase 1 | Stilt Floor | 100.0% |
| Tejas Imperial phase 1 | Slabs of Super Structure | 100.0% |
| Tejas Imperial phase 1 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| Tejas Imperial phase 1 | Sanitary Fittings within the flats / premises | 100.0% |
| Tejas Imperial phase 1 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| Tejas Imperial phase 1 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| Tejas Imperial phase 1 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| Tejas Imperial phase 2 | Excavation | 100.0% |
| Tejas Imperial phase 2 | Basement (if any) | 100.0% |
| Tejas Imperial phase 2 | Podiums (if any) | 100.0% |
| Tejas Imperial phase 2 | Plinth | 100.0% |
| Tejas Imperial phase 2 | Stilt Floor | 100.0% |
| Tejas Imperial phase 2 | Slabs of Super Structure | 100.0% |
| Tejas Imperial phase 2 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85.0% |
| Tejas Imperial phase 2 | Sanitary Fittings within the flats / premises | 85.0% |
| Tejas Imperial phase 2 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90.0% |
| Tejas Imperial phase 2 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85.0% |
| Tejas Imperial phase 2 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 85.0% |
MahaRERA project filing · read 19 July 2026 · registration P52100018270
| Revised target | Reason given by the builder |
|---|---|
| 1 April 2025 | General |
| 1 April 2026 | Project is 87% Complete 2. Format B Consent of 58.82 % of Allotees for Extension uploaded in tab 1 3. The Revised Form B is uploaded in tab No.2 4. PERT Chart for the remaining completion work is uploaded in Tab No. 3 5. Explanatory Note for Delay in project Completion Uploaded in Tab No. 4 and project wiil be completed by 01/04/2026 6. Due to unavoidable circumstances project has been delay and it will be completed by 01/04/2026 We request an extension under Section 7(3) as the project is 87% complete. Delays were due to: Late sanction of additional floors (applied 31/07/2024, approved 16/01/2025), Labour shortages, and Raw material supply issues. We assure timely completion within the revised schedule and full compliance with MahaRERA. |
| 1 October 2026 | We, M/s. Tejas Realty, promoter of the project TEJAS IMPERIAL (MahaRERA Registration No. P52100018270), respectfully request an extension of the project registration until 01/10/2026. We have applied to the Pimpri-Chinchwad Municipal Corporation for the Occupation Certificate (OC) for the project. The project is 93% completed, and all Quarterly Progress Reports (QPR) up to December 2025 have been duly complied with. The consent of 54.17% of allottees has been uploaded in support of this extension application. The extension is being sought solely due to pending issuance of the OC by the planning authority. We have uploaded possession letter. We have received a Part Occupancy Certificate on 31/03/2025 up to the 4th floor, while the OC for the remaining 7 floors is pending with the Planning Authority. In view of the above, we kindly request the Hon’ble MahaRERA Authority to grant an extension up to 01/10/2026 under Section 7 (3) of the RERA Act to obtain the Occupation Certificate for the balance floors. We assure our continued compliance with MahaRERA regulations and will upload the OC upon receipt. |
MahaRERA project filing · read 19 July 2026 · registration P52100018270
RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.
| Filing | Own funds | Borrowing | Payments from buyers | Total |
|---|---|---|---|---|
| Estimated plan | ₹200,000,000 | ₹200,000,000 | ₹251,068,580 | ₹756,068,580 |
| Actual raised | ₹84,486,151 | ₹160,333,730 | ₹322,204,108 | ₹741,923,989 |
MahaRERA project filing · read 19 July 2026 · registration P52100018270
27 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.
MahaRERA project filing · read 19 July 2026 · registration P52100018270
A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.
MahaRERA project filing · read 19 July 2026 · registration P52100018270
Builder and past records
Projects registered under this company
1Pune registrations
These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.
MahaRERA Pune registration records · read 12 July 2026
Past records of sales and unsold homes
26 September 2026
133 marked unsold · 61 sold · 0 booked.
Saved MahaRERA home list
18 September 2026
133 marked unsold · 61 sold · 0 booked.
Saved MahaRERA home list
8 September 2026
133 marked unsold · 61 sold · 0 booked.
Saved MahaRERA home list
19 July 2026
134 marked unsold · 60 sold · 0 booked.
Saved MahaRERA home list
These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.
More projects to explore
These projects list the same locality. They may differ in exact location, home type and price.
Wakad · Pune
P52100049293
141 of 345 entries marked unsold
MahaRERA · per-home inventory · read 10 September 2026
View project details →Wakad · Pune
P52100051063
25 of 133 entries marked unsold
MahaRERA · per-home inventory · read 10 September 2026
View project details →Wakad · Pune
P52100079071
100 of 266 entries marked unsold
MahaRERA · per-home inventory · read 28 September 2026
View project details →Project Comparison Report
Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.
2 projects · ₹7,999
3 projects · ₹9,999
Within 1 working day
Didn’t help you decide? Full refund — no questions asked.
Compare project details for free →MahaRERA · registration record · read 12 July 2026
MahaRERA · per-home inventory · read 8 September 2026
This is a past RERA home list, not current availability. It does not give the date each home was sold.
Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.
Open MahaRERA · search P52100018270 ↗