What does the RERA record show?

For Gagan Klara (P52100019739), 65 of 373 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).

MahaRERA · per-home inventory · saved-file date 18 July 2026

For Gagan Klara, ₹10,774 per sq ft of carpet area is the median rate across 308 sold or booked entries with prices in the MahaRERA home list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.

MahaRERA · per-home inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹10,774/ sq ft carpet area

Across 308 sold or booked entries with reported prices. The middle 80% of rates fall between ₹9,119 and ₹13,792.

MahaRERA · per-home inventory · saved-file date 18 July 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar homes sell for?

Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

373 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
Building D - Commercial And MHADA12183533020.61–114.58 sq m≈ 222–1,233 sq ft
Wing A8473011052.09–87.25 sq m≈ 561–939 sq ft
Wing B8471013051.92–87.18 sq m≈ 559–938 sq ft
Wing C847608074.67–122.38 sq m≈ 804–1,317 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

373 listed entries

MahaRERA · per-home inventory · saved-file date 18 July 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
1Building D - Commercial And MHADA205114.58 sq m≈ 1,233 sq ftMarked unsoldNot stated
1001Building D - Commercial And MHADA1022.64 sq m≈ 244 sq ftSold₹1,804,800
1002Building D - Commercial And MHADA1026.74 sq m≈ 288 sq ftSold₹1,656,600
1003Building D - Commercial And MHADA1027.64 sq m≈ 298 sq ftSold₹1,689,800
1004Building D - Commercial And MHADA1026.05 sq m≈ 280 sq ftSold₹1,615,000
1005Building D - Commercial And MHADA1027.72 sq m≈ 298 sq ftSold₹1,691,700
1006Building D - Commercial And MHADA1028.61 sq m≈ 308 sq ftSold₹1,726,200
1007Building D - Commercial And MHADA1030.35 sq m≈ 327 sq ftSold₹1,818,800
1008Building D - Commercial And MHADA1029.23 sq m≈ 315 sq ftBooked₹1,756,200
1009Building D - Commercial And MHADA1024.46 sq m≈ 263 sq ftSold₹1,570,600
101Building D - Commercial And MHADA160.0 sq m≈ 646 sq ftMarked unsoldNot stated
1010Building D - Commercial And MHADA1020.61 sq m≈ 222 sq ftMarked unsoldNot stated

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹961,642,320 of an estimated ₹1,003,823,186 was reported as incurred (95.8%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 19 July 2026 · registration P52100019739

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
Building D - Commercial And MHADAExcavation100.0%
Building D - Commercial And MHADABasement (if any)100.0%
Building D - Commercial And MHADAPodiums (if any) 0.0%
Building D - Commercial And MHADAPlinth100.0%
Building D - Commercial And MHADAStilt Floor 100.0%
Building D - Commercial And MHADASlabs of Super Structure100.0%
Building D - Commercial And MHADAInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75.0%
Building D - Commercial And MHADASanitary Fittings within the flats / premises5.0%
Building D - Commercial And MHADAStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Building D - Commercial And MHADAExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70.0%
Building D - Commercial And MHADAInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30.0%
Wing AExcavation100.0%
Wing ABasement (if any)100.0%
Wing APodiums (if any) 0.0%
Wing APlinth100.0%
Wing AStilt Floor 100.0%
Wing ASlabs of Super Structure100.0%
Wing AInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
Wing ASanitary Fittings within the flats / premises70.0%
Wing AStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Wing AExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
Wing AInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.97.0%
Wing BExcavation100.0%
Wing BBasement (if any)100.0%
Wing BPodiums (if any) 0.0%
Wing BPlinth100.0%
Wing BStilt Floor 100.0%
Wing BSlabs of Super Structure100.0%
Wing BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96.0%
Wing BSanitary Fittings within the flats / premises66.0%
Wing BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Wing BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
Wing BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.96.0%
Wing CExcavation100.0%
Wing CBasement (if any)100.0%
Wing CPodiums (if any) 0.0%
Wing CPlinth100.0%
Wing CStilt Floor 100.0%
Wing CSlabs of Super Structure100.0%
Wing CInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
Wing CSanitary Fittings within the flats / premises75.0%
Wing CStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Wing CExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
Wing CInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.96.0%

MahaRERA project filing · read 19 July 2026 · registration P52100019739

Reported deadline extensions

Revised targetReason given by the builder
30 March 20251) We are the Promoters of the Real Estate Project known as “GAGAN KLARA” under implementation by us on land admeasuring 00 H 89 Ares bearing Survey Nos. 38 Hissa No. 8A situate, lying and being at village Balewadi within the Registration Sub- District of Taluka Haveli, District- Pune. You were kind enough to grant Registration of the said Project vide your Registration Certificate No. P52100019739 dated 05/03/2019. 2) In anticipation that we would complete the said Project on or before 30/03/2024, in our application to you for Registration of our Project, we had mentioned the date of Completion as 30/03/2024. However, due to unforeseen and unexpected delays in the Municipal Corporation of Pune sanctioning the revised Building Plans in respect of the said Project and the very severe adverse market conditions, we anticipate that we will not able to complete the Project beyond the stipulated date. 3) We have therefore to request you to grant Extension of Twelve Month for completion by us of the said Project and to issue an Extension Certificate to us accordingly.
30 March 2026We have received the part occupancy certificate bearing no. OCC/0589/24 on dated 21/08/2024 for building D. And we are in process of obtaining all NOC’s required for application of Completion Certificate to obtain the full occupancy certificate for building A, B and C at earliest. Hence the completion of the project was delayed and we require extension.

MahaRERA project filing · read 19 July 2026 · registration P52100019739

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹0₹487,539,502₹1,173,071,378₹1,660,610,880
Actual raised₹143,778,500₹62,606,526₹1,168,432,139₹1,379,242,165

MahaRERA project filing · read 19 July 2026 · registration P52100019739

Quarterly filing record

29 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 19 July 2026 · registration P52100019739

Documents named in the filing

  • Commencement certificate · 2 listed
  • Form 1 — Architect's certificate · 5 listed
  • Form 3 — CA certificate · 7 listed
  • Form 2 — Engineer's certificate · 6 listed
  • Title / search report · 1 listed
  • Form B — Promoter declaration · 3 listed
  • Sanctioned building plan · 33 listed
  • Sanctioned layout plan · 6 listed
  • Occupancy / completion certificate · 2 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100019739

Builder and past records

What else does the record show?

Projects registered under this company

Gagan Housing And Landmarks LLP

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

    Past records of sales and unsold homes

    1. 26 September 2026

      65 marked unsold · 303 sold · 5 booked.

      Saved MahaRERA home list

    2. 17 September 2026

      65 marked unsold · 303 sold · 5 booked.

      Saved MahaRERA home list

    3. 8 September 2026

      65 marked unsold · 303 sold · 5 booked.

      Saved MahaRERA home list

    4. 19 July 2026

      65 marked unsold · 303 sold · 5 booked.

      Saved MahaRERA home list

    These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

    More projects to explore

    Other projects in this locality.

    These projects list the same locality. They may differ in exact location, home type and price.

    Project Comparison Report

    Which project should you buy in?
    And which home?

    Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 12 July 2026

    MahaRERA · per-home inventory · saved-file date 18 July 2026

    This is a past RERA home list, not current availability. It does not give the date each home was sold.

    The home-list date is based on the saved file’s details.

    Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.