homeonpaper.

Builder’s RERA records,
explained for buyers.

The builder’s RERA record, explained

SAINAGAR

SHRIMUDRA CONSTRUCTION · P52100020563

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For SAINAGAR (P52100020563), 83 of 213 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).

MahaRERA · per-home inventory · saved-file date 18 July 2026

For SAINAGAR, ₹3,682 per sq ft of carpet area is the median rate across 97 sold or booked entries with prices in the MahaRERA home list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.

MahaRERA · per-home inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹3,682/ sq ft carpet area

Across 97 sold or booked entries with reported prices. The middle 80% of rates fall between ₹2,979 and ₹4,759.

MahaRERA · per-home inventory · saved-file date 18 July 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar homes sell for?

Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

213 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
A7300480.12 sq m≈ 862 sq ft
B7200584.18 sq m≈ 906 sq ft
Building D520052014.24–85.30 sq m≈ 153–918 sq ft
Building E300030015.19–81.95 sq m≈ 164–882 sq ft
C7200579.10–111.24 sq m≈ 851–1,197 sq ft
F11090011912.74–53.26 sq m≈ 137–573 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

213 listed entries

MahaRERA · per-home inventory · saved-file date 18 July 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
RH 1A20580.12 sq m≈ 862 sq ftNot for saleNot stated
RH 2A20580.12 sq m≈ 862 sq ftNot for saleNot stated
RH 3A20580.12 sq m≈ 862 sq ftNot for saleNot stated
RH 4A20580.12 sq m≈ 862 sq ftNot for saleNot stated
RH 5A20580.12 sq m≈ 862 sq ftSold₹5,000,000
RH 6A20580.12 sq m≈ 862 sq ftSold₹3,300,000
RH 7A20580.12 sq m≈ 862 sq ftSold₹3,000,000
RH 10B20584.18 sq m≈ 906 sq ftNot for saleNot stated
RH 11B20584.18 sq m≈ 906 sq ftNot for saleNot stated
RH 12B20584.18 sq m≈ 906 sq ftSold₹3,000,000
RH 13B20584.18 sq m≈ 906 sq ftNot for saleNot stated
RH 14B20584.18 sq m≈ 906 sq ftNot for saleNot stated

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹174,000,000 of an estimated ₹174,000,000 was reported as incurred (100.0%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 19 July 2026 · registration P52100020563

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
CExcavation100.0%
CBasement (if any)100.0%
CPodiums (if any) 100.0%
CPlinth100.0%
CStilt Floor 100.0%
CSlabs of Super Structure100.0%
CInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
CSanitary Fittings within the flats / premises100.0%
CStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
CExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
CInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
AExcavation100.0%
ABasement (if any)100.0%
APodiums (if any) 100.0%
APlinth100.0%
AStilt Floor 100.0%
ASlabs of Super Structure100.0%
AInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
ASanitary Fittings within the flats / premises100.0%
AStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
AExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
AInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BExcavation100.0%
BBasement (if any)100.0%
BPodiums (if any) 100.0%
BPlinth100.0%
BStilt Floor 100.0%
BSlabs of Super Structure100.0%
BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BSanitary Fittings within the flats / premises100.0%
BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
FExcavation100.0%
FBasement (if any)100.0%
FPodiums (if any) 100.0%
FPlinth100.0%
FStilt Floor 100.0%
FSlabs of Super Structure1000.0%
FInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
FSanitary Fittings within the flats / premises100.0%
FStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
FExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
FInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
Building EExcavation90.0%
Building EBasement (if any)20.0%
Building EPlinth0.0%
Building EStilt Floor 0.0%
Building ESlabs of Super Structure0.0%
Building EInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Building ESanitary Fittings within the flats / premises0.0%
Building EStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Building EExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Building EInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Building DExcavation90.0%
Building DBasement (if any)20.0%
Building DPlinth0.0%
Building DStilt Floor 0.0%
Building DSlabs of Super Structure0.0%
Building DInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Building DSanitary Fittings within the flats / premises0.0%
Building DStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Building DExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Building DInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 19 July 2026 · registration P52100020563

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹6,902,140₹15,000,000₹337,172,100₹359,074,240
Actual raised₹6,902,140₹15,000,000₹145,707,374₹167,609,514

MahaRERA project filing · read 19 July 2026 · registration P52100020563

Quarterly filing record

28 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 19 July 2026 · registration P52100020563

Documents named in the filing

  • Promoter PAN · 1 listed
  • Form 1 — Architect's certificate · 1 listed
  • Form 3 — CA certificate · 2 listed
  • Form B — Promoter declaration · 3 listed
  • Title / search report · 3 listed
  • Sanctioned building plan · 4 listed
  • Sanctioned layout plan · 1 listed
  • Occupancy / completion certificate · 2 listed
  • Form 2 — Engineer's certificate · 1 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100020563

Builder and past records

What else does the record show?

Projects registered under this company

SHRIMUDRA CONSTRUCTION

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

    Past records of sales and unsold homes

    1. 26 September 2026

      83 marked unsold · 97 sold · 0 booked.

      Saved MahaRERA home list

    2. 17 September 2026

      83 marked unsold · 97 sold · 0 booked.

      Saved MahaRERA home list

    3. 8 September 2026

      83 marked unsold · 97 sold · 0 booked.

      Saved MahaRERA home list

    4. 19 July 2026

      83 marked unsold · 97 sold · 0 booked.

      Saved MahaRERA home list

    These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

    More projects to explore

    Other projects in this locality.

    These projects list the same locality. They may differ in exact location, home type and price.

    Project Comparison Report

    Which project should you buy in?
    And which home?

    Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 12 July 2026

    MahaRERA · per-home inventory · saved-file date 18 July 2026

    This is a past RERA home list, not current availability. It does not give the date each home was sold.

    The home-list date is based on the saved file’s details.

    Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

    Open MahaRERA · search P52100020563 ↗
    homeonpaper