Buyer’s Report
Understand this project
Find homes to consider, with advice on light, layout, privacy and surroundings.
₹4,999
Builder’s RERA records,
explained for buyers.
The builder’s RERA record, explained
RAVIRAJ SHETH DEVELOPERS LLP · P52100021159
For Raviraj Splendour Greens (P52100021159), 141 of 215 entries were marked unsold in the MahaRERA home list read 8 September 2026.
For Raviraj Splendour Greens, ₹7,985 per sq ft of carpet area is the median rate across 74 sold or booked entries with prices in the MahaRERA home list read 8 September 2026. These are historical agreement values, not current asking prices.
These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.
Builder’s completion target
The builder reported this target date. It is not a confirmed handover date.
Status shown on RERA
This is the status shown on RERA. It does not confirm an occupancy certificate or today’s construction progress.
Prices reported to RERA
₹7,985/ sq ft carpet area
Across 74 sold or booked entries with reported prices. The middle 80% of rates fall between ₹4,389 and ₹9,008.
MahaRERA · per-home inventory · read 8 September 2026
For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.
Sales Report
Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.
Inside this registered phase
215 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.
MahaRERA · per-home inventory · read 8 September 2026
Scroll sideways to see all columns.
| Filed building | Entries | Sold | Booked | Marked unsold | Other / unstated status | Recorded carpet-area range |
|---|---|---|---|---|---|---|
| A | 75 | 2 | 0 | 73 | 0 | 57.24–64.85 sq m≈ 616–698 sq ft |
| B | 56 | 28 | 3 | 25 | 0 | 30.56–46.99 sq m≈ 329–506 sq ft |
| C | 84 | 28 | 13 | 43 | 0 | 57.24–64.85 sq m≈ 616–698 sq ft |
Different sizes are not necessarily different bedroom types. How we read and summarise the filing →
Unit Report
Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.
Didn’t help you decide? Full refund — no questions asked.
The same home number may appear in more than one building. Check both before choosing.
MahaRERA · per-home inventory · read 8 September 2026
| Home / building | Floor in the record | Carpet area | Reported status | Agreement value | Assess |
|---|---|---|---|---|---|
| A-1001A | 10 | 61.29 sq m≈ 660 sq ft | Marked unsold | Not stated | |
| A-1002A | 10 | 57.46 sq m≈ 618 sq ft | Marked unsold | Not stated | |
| A-1003A | 10 | 57.24 sq m≈ 616 sq ft | Marked unsold | Not stated | |
| A-1004A | 10 | 59.38 sq m≈ 639 sq ft | Marked unsold | Not stated | |
| A-1005A | 10 | 58.76 sq m≈ 632 sq ft | Marked unsold | Not stated | |
| A-1006A | 10 | 64.85 sq m≈ 698 sq ft | Marked unsold | Not stated | |
| A-101A | 1 | 61.29 sq m≈ 660 sq ft | Marked unsold | Not stated | |
| A-102A | 1 | 57.46 sq m≈ 618 sq ft | Marked unsold | Not stated | |
| A-103A | 1 | 57.24 sq m≈ 616 sq ft | Marked unsold | Not stated | |
| A-104A | 1 | 59.38 sq m≈ 639 sq ft | Marked unsold | Not stated | |
| A-105A | 1 | 58.76 sq m≈ 632 sq ft | Marked unsold | Not stated | |
| A-106A | 1 | 64.85 sq m≈ 698 sq ft | Marked unsold | Not stated |
Read every entry in one table: Read the complete saved home list.
Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.
More from the RERA documents
₹231,116,411 of an estimated ₹599,800,000 was reported as incurred (38.5%). This percentage is about costs. It does not show how much construction is complete.
MahaRERA project filing · read 19 July 2026 · registration P52100021159
Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.
| Building | Activity | Reported |
|---|---|---|
| A | Excavation | 100.0% |
| A | Basement (if any) | 80.0% |
| A | Podiums (if any) | 0.0% |
| A | Plinth | 0.0% |
| A | Stilt Floor | 80.0% |
| A | Slabs of Super Structure | 40.0% |
| A | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 14.0% |
| A | Sanitary Fittings within the flats / premises | 0.0% |
| A | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| A | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| A | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| B | Excavation | 100.0% |
| B | Basement (if any) | 80.0% |
| B | Podiums (if any) | 0.0% |
| B | Plinth | 0.0% |
| B | Stilt Floor | 80.0% |
| B | Slabs of Super Structure | 93.0% |
| B | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 18.0% |
| B | Sanitary Fittings within the flats / premises | 0.0% |
| B | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| B | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| B | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| C | Excavation | 100.0% |
| C | Basement (if any) | 80.0% |
| C | Podiums (if any) | 0.0% |
| C | Plinth | 0.0% |
| C | Stilt Floor | 80.0% |
| C | Slabs of Super Structure | 93.0% |
| C | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| C | Sanitary Fittings within the flats / premises | 0.0% |
| C | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| C | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| C | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
MahaRERA project filing · read 19 July 2026 · registration P52100021159
| Revised target | Reason given by the builder |
|---|---|
| 30 December 2026 | The construction of the project is delayed due to the outbrake of COVID 19 pandemic in India. Maharashtra being the most affected state and Pune being one of the worst affected cities, labour were not available due migration. Hence the construction activity had to be stopped. The construction work has just recently commenced. |
| 31 December 2027 | We would like to submit that the construction schedule of the project has been significantly impacted due to various genuine and unavoidable circumstances beyond the control of the promoter. These factors have cumulatively led to delays in the timely execution of the project as originally planned. The key reasons are detailed below: Disruption in Supply Chain and Delay in Procurement of Construction Materials: One of the primary causes of delay has been the disruption in the supply chain of essential construction materials such as cement, steel, sand, aggregates, plumbing components, electrical fittings, and finishing materials. The post-pandemic global and domestic logistical constraints have caused a considerable increase in lead times for procurement. Additionally, local market shortages and continuous price volatility of these key materials have further compounded the issue, leading to intermittent halts in construction activities. The irregular availability and unpredictability in costs have made it extremely challenging to adhere to the original construction timelines. Labour Shortage – Skilled and Unskilled Workforce: The project also encountered a consistent shortage of both skilled and unskilled labour. Due to reverse migration during the pandemic and an overall labour market imbalance in the construction sector, retaining a stable and sufficient workforce became increasingly difficult. Frequent attrition, increased wage demands, and limited availability of trained manpower adversely affected the pace and continuity of construction work. The labour shortfall directly impacted civil works, finishing activities, and other critical on-site operations. Price Escalation and Cost Overruns: The sudden and steep escalation in the cost of construction materials and labour wages resulted in substantial budgetary pressure. These unforeseen financial burdens led to cash flow mismatches, thereby impacting the timely mobilisation of vendors and contractors. While efforts were made to manage these cost escalations through re-negotiations and re-scheduling of work packages, the overall progress was affected. |
MahaRERA project filing · read 19 July 2026 · registration P52100021159
RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.
| Filing | Own funds | Borrowing | Payments from buyers | Total |
|---|---|---|---|---|
| Estimated plan | ₹21,669,476 | ₹139,972,078 | ₹642,532,779 | ₹990,413,410 |
| Actual raised | ₹153,223,272 | ₹103,446,312 | ₹92,984,212 | ₹535,892,873 |
MahaRERA project filing · read 19 July 2026 · registration P52100021159
28 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.
MahaRERA project filing · read 19 July 2026 · registration P52100021159
A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.
MahaRERA project filing · read 19 July 2026 · registration P52100021159
Builder and past records
Projects registered under this company
1Pune registrations
These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.
MahaRERA Pune registration records · read 12 July 2026
Past records of sales and unsold homes
26 September 2026
141 marked unsold · 58 sold · 16 booked.
Saved MahaRERA home list
17 September 2026
141 marked unsold · 58 sold · 16 booked.
Saved MahaRERA home list
8 September 2026
141 marked unsold · 58 sold · 16 booked.
Saved MahaRERA home list
19 July 2026
102 marked unsold · 58 sold · 16 booked.
Saved MahaRERA home list
These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.
More projects to explore
These projects list the same locality. They may differ in exact location, home type and price.
Kondhwa Budruk · Pune
P52100050157
123 of 360 entries marked unsold
MahaRERA · per-home inventory · read 19 July 2026
View project details →Kondhwa Budruk · Pune
P52100080079
61 of 120 entries marked unsold
MahaRERA · per-home inventory · read 11 September 2026
View project details →Project Comparison Report
Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.
2 projects · ₹7,999
3 projects · ₹9,999
Within 1 working day
Didn’t help you decide? Full refund — no questions asked.
Compare project details for free →MahaRERA · registration record · read 12 July 2026
MahaRERA · per-home inventory · read 8 September 2026
This is a past RERA home list, not current availability. It does not give the date each home was sold.
Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.
Open MahaRERA · search P52100021159 ↗