What does the RERA record show?

For ISHANAND (P52100025427), 45 of 116 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).

MahaRERA · per-home inventory · saved-file date 18 July 2026

For ISHANAND, ₹10,246 per sq ft of carpet area is the median rate across 71 sold or booked entries with prices in the MahaRERA home list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.

MahaRERA · per-home inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹10,246/ sq ft carpet area

Across 71 sold or booked entries with reported prices. The middle 80% of rates fall between ₹8,636 and ₹12,209.

MahaRERA · per-home inventory · saved-file date 18 July 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar homes sell for?

Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

116 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
Ishanand Building Wing A7025144061.77–103.80 sq m≈ 665–1,117 sq ft
Ishanand Building Wing B464501043.02–143.96 sq m≈ 463–1,550 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

116 listed entries

MahaRERA · per-home inventory · saved-file date 18 July 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
1001Ishanand Building Wing A1065.21 sq m≈ 702 sq ftMarked unsoldNot stated
1002Ishanand Building Wing A1093.0 sq m≈ 1,001 sq ftMarked unsoldNot stated
1003Ishanand Building Wing A1094.67 sq m≈ 1,019 sq ftMarked unsoldNot stated
1004Ishanand Building Wing A10102.01 sq m≈ 1,098 sq ftMarked unsoldNot stated
1005Ishanand Building Wing A1099.25 sq m≈ 1,068 sq ftMarked unsoldNot stated
1006Ishanand Building Wing A1095.25 sq m≈ 1,025 sq ftMarked unsoldNot stated
101Ishanand Building Wing A166.08 sq m≈ 711 sq ftSold₹8,105,500
102Ishanand Building Wing A193.0 sq m≈ 1,001 sq ftMarked unsoldNot stated
103Ishanand Building Wing A194.67 sq m≈ 1,019 sq ftSold₹10,053,000
104Ishanand Building Wing A1103.8 sq m≈ 1,117 sq ftSold₹11,107,000
1101Ishanand Building Wing A1166.08 sq m≈ 711 sq ftMarked unsoldNot stated
1102Ishanand Building Wing A1193.0 sq m≈ 1,001 sq ftMarked unsoldNot stated

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹304,415,000 of an estimated ₹418,771,000 was reported as incurred (72.7%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 19 July 2026 · registration P52100025427

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
Ishanand Building Wing AExcavation100.0%
Ishanand Building Wing ABasement (if any)100.0%
Ishanand Building Wing APodiums (if any) 100.0%
Ishanand Building Wing APlinth100.0%
Ishanand Building Wing AStilt Floor 100.0%
Ishanand Building Wing ASlabs of Super Structure70.0%
Ishanand Building Wing AInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90.0%
Ishanand Building Wing ASanitary Fittings within the flats / premises100.0%
Ishanand Building Wing AStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75.0%
Ishanand Building Wing AExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70.0%
Ishanand Building Wing AInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70.0%
Ishanand Building Wing BExcavation100.0%
Ishanand Building Wing BBasement (if any)100.0%
Ishanand Building Wing BPodiums (if any) 100.0%
Ishanand Building Wing BPlinth100.0%
Ishanand Building Wing BStilt Floor 100.0%
Ishanand Building Wing BSlabs of Super Structure70.0%
Ishanand Building Wing BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90.0%
Ishanand Building Wing BSanitary Fittings within the flats / premises100.0%
Ishanand Building Wing BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75.0%
Ishanand Building Wing BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70.0%
Ishanand Building Wing BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70.0%

MahaRERA project filing · read 19 July 2026 · registration P52100025427

Reported deadline extensions

Revised targetReason given by the builder
30 June 2025Due to UDCPR, we had to go for EC and as due to Election and SEAC Committee not formed since last 6 months it's been delayed.
30 June 2027We are applying for an extension under RERA as the construction work for Ishanand Building Wing A is still pending. The primary cause of the delay is that the Environmental Clearance (EC) for the project has not yet been received. All required documents have been submitted, and we are actively following up with the concerned authorities, but the approval process is still ongoing. As per statutory norms, construction activity for Ishanand Building Wing A cannot be commenced without the EC. Furthermore, once the EC is granted, we will need to apply for revised building plan sanctions based on the conditions outlined in the clearance, which will require additional time. These regulatory steps are mandatory and beyond our control.

MahaRERA project filing · read 19 July 2026 · registration P52100025427

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹50,000,000₹130,000,000₹263,521,677₹593,521,677
Actual raised₹0₹82,310,890₹325,564,106₹446,289,126

MahaRERA project filing · read 19 July 2026 · registration P52100025427

Quarterly filing record

24 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 19 July 2026 · registration P52100025427

Documents named in the filing

  • Promoter PAN · 1 listed
  • Commencement certificate · 1 listed
  • Form 1 — Architect's certificate · 1 listed
  • Form 3 — CA certificate · 1 listed
  • Form 2 — Engineer's certificate · 1 listed
  • Title / search report · 1 listed
  • Form B — Promoter declaration · 2 listed
  • Sanctioned layout plan · 1 listed
  • Sanctioned building plan · 4 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100025427

Builder and past records

What else does the record show?

Projects registered under this company

MAKAWANA BROS & CO (HWP)

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

    Past records of sales and unsold homes

    1. 26 September 2026

      45 marked unsold · 70 sold · 1 booked.

      Saved MahaRERA home list

    2. 17 September 2026

      45 marked unsold · 70 sold · 1 booked.

      Saved MahaRERA home list

    3. 9 September 2026

      45 marked unsold · 70 sold · 1 booked.

      Saved MahaRERA home list

    4. 19 July 2026

      45 marked unsold · 70 sold · 1 booked.

      Saved MahaRERA home list

    These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

    More projects to explore

    Other projects in this locality.

    These projects list the same locality. They may differ in exact location, home type and price.

    Project Comparison Report

    Which project should you buy in?
    And which home?

    Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 12 July 2026

    MahaRERA · per-home inventory · saved-file date 18 July 2026

    This is a past RERA home list, not current availability. It does not give the date each home was sold.

    The home-list date is based on the saved file’s details.

    Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.