What does the RERA record show?

For JD Gaatha (P52100028163), 51 of 152 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).

MahaRERA · per-home inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Inside this registered phase

How do the buildings compare in the record?

152 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
Building A Wing I8857031067.08–98.08 sq m≈ 722–1,056 sq ft
Building A Wing II3322011067.08–92.76 sq m≈ 722–998 sq ft
Lower Ground11902022.35–48.39 sq m≈ 241–521 sq ft
Upper Ground201307034.17–90.78 sq m≈ 368–977 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

152 listed entries

MahaRERA · per-home inventory · saved-file date 18 July 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
1001Building A Wing I1094.45 sq m≈ 1,017 sq ftMarked unsoldNot stated
1002Building A Wing I1072.52 sq m≈ 781 sq ftSoldNot stated
1003Building A Wing I1072.52 sq m≈ 781 sq ftMarked unsoldNot stated
1004Building A Wing I1067.08 sq m≈ 722 sq ftSoldNot stated
1005Building A Wing I1071.49 sq m≈ 770 sq ftSoldNot stated
1006Building A Wing I1095.1 sq m≈ 1,024 sq ftSoldNot stated
1007Building A Wing I1095.1 sq m≈ 1,024 sq ftMarked unsoldNot stated
1008Building A Wing I1098.08 sq m≈ 1,056 sq ftSoldNot stated
101Building A Wing I194.45 sq m≈ 1,017 sq ftMarked unsoldNot stated
102Building A Wing I172.52 sq m≈ 781 sq ftMarked unsoldNot stated
103Building A Wing I172.52 sq m≈ 781 sq ftMarked unsoldNot stated
104Building A Wing I167.08 sq m≈ 722 sq ftMarked unsoldNot stated

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
Building A Wing IExcavation100.0%
Building A Wing IBasement (if any)100.0%
Building A Wing IPodiums (if any) 100.0%
Building A Wing IPlinth100.0%
Building A Wing IStilt Floor 100.0%
Building A Wing ISlabs of Super Structure100.0%
Building A Wing IInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75.0%
Building A Wing ISanitary Fittings within the flats / premises35.0%
Building A Wing IStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75.0%
Building A Wing IExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60.0%
Building A Wing IInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Upper GroundExcavation100.0%
Upper GroundBasement (if any)100.0%
Upper GroundPodiums (if any) 100.0%
Upper GroundPlinth100.0%
Upper GroundStilt Floor 100.0%
Upper GroundSlabs of Super Structure100.0%
Upper GroundInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
Upper GroundSanitary Fittings within the flats / premises100.0%
Upper GroundStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Upper GroundExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
Upper GroundInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Lower GroundExcavation100.0%
Lower GroundBasement (if any)100.0%
Lower GroundPodiums (if any) 100.0%
Lower GroundPlinth100.0%
Lower GroundStilt Floor 100.0%
Lower GroundSlabs of Super Structure100.0%
Lower GroundInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
Lower GroundSanitary Fittings within the flats / premises100.0%
Lower GroundStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Lower GroundExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
Lower GroundInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Building A Wing IIExcavation100.0%
Building A Wing IIBasement (if any)100.0%
Building A Wing IIPodiums (if any) 100.0%
Building A Wing IIPlinth100.0%
Building A Wing IIStilt Floor 100.0%
Building A Wing IISlabs of Super Structure100.0%
Building A Wing IIInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75.0%
Building A Wing IISanitary Fittings within the flats / premises35.0%
Building A Wing IIStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75.0%
Building A Wing IIExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60.0%
Building A Wing IIInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 19 July 2026 · registration P52100028163

Reported deadline extensions

Revised targetReason given by the builder
31 March 2026Inspite of genuine efforts, project could not be completed within the stipulated time hence applying for the extension after getting approval of 2/3rd of allottees as per section 7(3). Requesting the MAHARERA authority to grant the extension.

MahaRERA project filing · read 19 July 2026 · registration P52100028163

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹83,600,000₹100,000,000₹182,779,515₹366,379,515
Actual raised₹83,600,000₹58,787,053₹176,249,052₹318,636,105

MahaRERA project filing · read 19 July 2026 · registration P52100028163

Quarterly filing record

21 elapsed quarterly periods in the captured compliance schedule. Active default was recorded for FY 2025-2026.

MahaRERA project filing · read 19 July 2026 · registration P52100028163

Documents named in the filing

  • Commencement certificate · 1 listed
  • Promoter PAN · 1 listed
  • Form 1 — Architect's certificate · 1 listed
  • Form 3 — CA certificate · 1 listed
  • Form 2 — Engineer's certificate · 1 listed
  • Title / search report · 1 listed
  • Form B — Promoter declaration · 2 listed
  • Sanctioned building plan · 13 listed
  • Sanctioned layout plan · 7 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100028163

Builder and past records

What else does the record show?

Projects registered under this company

Shree Jagadguru Developers

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

    Past records of sales and unsold homes

    1. 26 September 2026

      51 marked unsold · 101 sold · 0 booked.

      Saved MahaRERA home list

    2. 17 September 2026

      51 marked unsold · 101 sold · 0 booked.

      Saved MahaRERA home list

    3. 9 September 2026

      51 marked unsold · 101 sold · 0 booked.

      Saved MahaRERA home list

    4. 19 July 2026

      51 marked unsold · 101 sold · 0 booked.

      Saved MahaRERA home list

    These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

    Project Comparison Report

    Which project should you buy in?
    And which home?

    Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 12 July 2026

    MahaRERA · per-home inventory · saved-file date 18 July 2026

    This is a past RERA home list, not current availability. It does not give the date each home was sold.

    The home-list date is based on the saved file’s details.

    Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

    Open MahaRERA · search P52100028163 ↗
    homeonpaper