VINI BUILDERS AND DEVELOPERS · P52100029439
For ARYAA DREAM TOWN (P52100029439), 60 of 147 entries were marked unsold in the MahaRERA unit list dated 18 July 2026 (saved-file date).
MahaRERA · per-unit inventory · saved-file date 18 July 2026
For ARYAA DREAM TOWN, ₹3,767 per sq ft of filed area is the median rate across 87 sold or booked entries with prices in the MahaRERA unit list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.
MahaRERA · per-unit inventory · saved-file date 18 July 2026
These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.
Builder’s completion target
The builder reported this target date. It is not a confirmed handover date.
Status shown on RERA
This is the status shown on RERA. It does not confirm an occupancy certificate or today’s construction progress.
Prices reported to RERA
₹3,767/ sq ft filed area
Across 87 sold or booked entries with reported prices. The middle 80% of rates fall between ₹2,932 and ₹4,231.
MahaRERA · per-unit inventory · saved-file date 18 July 2026
For each sold or booked entry, we divide the reported agreement value by its filed area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold units and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.
Sales Report
Compare filed values by building, unit-number pattern and area. See which units were marked unsold on the date shown.
Inside this registered phase
147 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.
MahaRERA · per-unit inventory · saved-file date 18 July 2026
Scroll sideways to see all columns.
| Filed building | Entries | Sold | Booked | Marked unsold | Other / unstated status | Recorded filed-area range |
|---|---|---|---|---|---|---|
| ARYAA DREAM TOWN -ROW HOUAES A TO H | 8 | 8 | 0 | 0 | 0 | 87.92 sq m≈ 946 sq ft |
| ARYAA DREAM TOWN BLDG D | 131 | 75 | 0 | 56 | 0 | 19.79–40.80 sq m≈ 213–439 sq ft |
| ARYAA DREAM TOWN ROW HOUSES I TO P | 8 | 4 | 0 | 4 | 0 | 87.92 sq m≈ 946 sq ft |
Area means carpet area for building units and plot area for plots. Size alone does not establish use or layout. How we read and summarise the filing →
Unit Report
Understand its light, privacy, layout and surroundings. See how it compares with similar units and other options in this project.
Didn’t help you decide? Full refund — no questions asked.
The same unit number may appear in more than one building. Check both before choosing.
MahaRERA · per-unit inventory · saved-file date 18 July 2026
| Unit / building | Floor in the record | Filed area | Reported status | Agreement value | Assess |
|---|---|---|---|---|---|
| Row House AARYAA DREAM TOWN -ROW HOUAES A TO H / Wing NA | 205 | 87.92 sq m≈ 946 sq ft · RERA carpet area | Sold | ₹2,200,000 | |
| Row House BARYAA DREAM TOWN -ROW HOUAES A TO H / Wing NA | 205 | 87.92 sq m≈ 946 sq ft · RERA carpet area | Sold | ₹3,379,000 | |
| Row House CARYAA DREAM TOWN -ROW HOUAES A TO H / Wing NA | 205 | 87.92 sq m≈ 946 sq ft · RERA carpet area | Sold | ₹3,351,851 | |
| Row House DARYAA DREAM TOWN -ROW HOUAES A TO H / Wing NA | 205 | 87.92 sq m≈ 946 sq ft · RERA carpet area | Sold | ₹3,564,800 | |
| Row House EARYAA DREAM TOWN -ROW HOUAES A TO H / Wing NA | 205 | 87.92 sq m≈ 946 sq ft · RERA carpet area | Sold | ₹4,489,900 | |
| Row House FARYAA DREAM TOWN -ROW HOUAES A TO H / Wing NA | 205 | 87.92 sq m≈ 946 sq ft · RERA carpet area | Sold | ₹3,424,952 | |
| Row House GARYAA DREAM TOWN -ROW HOUAES A TO H / Wing NA | 205 | 87.92 sq m≈ 946 sq ft · RERA carpet area | Sold | ₹3,287,037 | |
| Row House HARYAA DREAM TOWN -ROW HOUAES A TO H / Wing NA | 205 | 87.92 sq m≈ 946 sq ft · RERA carpet area | Sold | ₹3,189,275 | |
| 1001ARYAA DREAM TOWN BLDG D / Wing NA | 10 | 34.57 sq m≈ 372 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 1002ARYAA DREAM TOWN BLDG D / Wing NA | 10 | 19.8 sq m≈ 213 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 1003ARYAA DREAM TOWN BLDG D / Wing NA | 10 | 36.71 sq m≈ 395 sq ft · RERA carpet area | Sold | ₹1,383,729 | |
| 1004ARYAA DREAM TOWN BLDG D / Wing NA | 10 | 36.71 sq m≈ 395 sq ft · RERA carpet area | Sold | ₹1,802,751 |
Read every entry in one table: Read the complete saved unit list.
Choose the unit you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.
More from the RERA documents
₹85,414,731 of an estimated ₹121,800,000 was reported as incurred (70.1%). This percentage is about costs. It does not show how much construction is complete.
MahaRERA project filing · read 19 July 2026 · registration P52100029439
Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.
| Building | Activity | Reported |
|---|---|---|
| ARYAA DREAM TOWN BLDG D | Excavation | 100.0% |
| ARYAA DREAM TOWN BLDG D | Basement (if any) | 0.0% |
| ARYAA DREAM TOWN BLDG D | Podiums (if any) | 0.0% |
| ARYAA DREAM TOWN BLDG D | Plinth | 0.0% |
| ARYAA DREAM TOWN BLDG D | Stilt Floor | 100.0% |
| ARYAA DREAM TOWN BLDG D | Slabs of Super Structure | 100.0% |
| ARYAA DREAM TOWN BLDG D | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90.0% |
| ARYAA DREAM TOWN BLDG D | Sanitary Fittings within the flats / premises | 45.0% |
| ARYAA DREAM TOWN BLDG D | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 45.0% |
| ARYAA DREAM TOWN BLDG D | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60.0% |
| ARYAA DREAM TOWN BLDG D | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| ARYAA DREAM TOWN -ROW HOUAES A TO H | Excavation | 100.0% |
| ARYAA DREAM TOWN -ROW HOUAES A TO H | Basement (if any) | 0.0% |
| ARYAA DREAM TOWN -ROW HOUAES A TO H | Podiums (if any) | 0.0% |
| ARYAA DREAM TOWN -ROW HOUAES A TO H | Plinth | 0.0% |
| ARYAA DREAM TOWN -ROW HOUAES A TO H | Stilt Floor | 100.0% |
| ARYAA DREAM TOWN -ROW HOUAES A TO H | Slabs of Super Structure | 100.0% |
| ARYAA DREAM TOWN -ROW HOUAES A TO H | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90.0% |
| ARYAA DREAM TOWN -ROW HOUAES A TO H | Sanitary Fittings within the flats / premises | 45.0% |
| ARYAA DREAM TOWN -ROW HOUAES A TO H | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 45.0% |
| ARYAA DREAM TOWN -ROW HOUAES A TO H | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60.0% |
| ARYAA DREAM TOWN -ROW HOUAES A TO H | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| ARYAA DREAM TOWN ROW HOUSES I TO P | Excavation | 100.0% |
| ARYAA DREAM TOWN ROW HOUSES I TO P | Basement (if any) | 0.0% |
| ARYAA DREAM TOWN ROW HOUSES I TO P | Podiums (if any) | 0.0% |
| ARYAA DREAM TOWN ROW HOUSES I TO P | Plinth | 0.0% |
| ARYAA DREAM TOWN ROW HOUSES I TO P | Stilt Floor | 100.0% |
| ARYAA DREAM TOWN ROW HOUSES I TO P | Slabs of Super Structure | 100.0% |
| ARYAA DREAM TOWN ROW HOUSES I TO P | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90.0% |
| ARYAA DREAM TOWN ROW HOUSES I TO P | Sanitary Fittings within the flats / premises | 45.0% |
| ARYAA DREAM TOWN ROW HOUSES I TO P | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 45.0% |
| ARYAA DREAM TOWN ROW HOUSES I TO P | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60.0% |
| ARYAA DREAM TOWN ROW HOUSES I TO P | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| ARYAA DREAM TOWN BLDG A1 | Excavation | 0.0% |
| ARYAA DREAM TOWN BLDG A1 | Basement (if any) | 0.0% |
| ARYAA DREAM TOWN BLDG A1 | Podiums (if any) | 0.0% |
| ARYAA DREAM TOWN BLDG A1 | Plinth | 0.0% |
| ARYAA DREAM TOWN BLDG A1 | Stilt Floor | 0.0% |
| ARYAA DREAM TOWN BLDG A1 | Slabs of Super Structure | 0.0% |
| ARYAA DREAM TOWN BLDG A1 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| ARYAA DREAM TOWN BLDG A1 | Sanitary Fittings within the flats / premises | 0.0% |
| ARYAA DREAM TOWN BLDG A1 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| ARYAA DREAM TOWN BLDG A1 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| ARYAA DREAM TOWN BLDG A1 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
MahaRERA project filing · read 19 July 2026 · registration P52100029439
| Revised target | Reason given by the builder |
|---|---|
| 31 December 2025 | We applied for an Occupancy Certificate but have not yet received it from the Municipal Corporation. Therefore, we need an extension for the project until December 31, 2025. |
| 31 December 2026 | We applied for an Occupancy Certificate but have not yet received it from the Municipal Corporation. Therefore, we need an extension for the project until December 31, 2026. |
MahaRERA project filing · read 19 July 2026 · registration P52100029439
RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.
| Filing | Own funds | Borrowing | Payments from buyers | Total |
|---|---|---|---|---|
| Estimated plan | ₹5,000,000 | ₹0 | ₹164,470,000 | ₹169,470,000 |
| Actual raised | ₹5,000,000 | ₹0 | ₹83,912,511 | ₹88,912,511 |
MahaRERA project filing · read 19 July 2026 · registration P52100029439
21 elapsed quarterly periods in the captured compliance schedule. Active default was recorded for FY 2025-2026.
MahaRERA project filing · read 19 July 2026 · registration P52100029439
A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.
MahaRERA project filing · read 19 July 2026 · registration P52100029439
Builder and past records
Projects registered under this company
2Pune registrations
These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.
MahaRERA Pune registration records · read 12 July 2026
Past records of sales and unsold units
26 September 2026
60 marked unsold · 87 sold · 0 booked.
Saved MahaRERA unit list
17 September 2026
60 marked unsold · 87 sold · 0 booked.
Saved MahaRERA unit list
9 September 2026
60 marked unsold · 87 sold · 0 booked.
Saved MahaRERA unit list
19 July 2026
60 marked unsold · 87 sold · 0 booked.
Saved MahaRERA unit list
These dates show when the records were saved, not when units were sold. Sales may have changed since then, even if the saved counts are the same.
Project Comparison Report
Compare up to three projects. We read their plans and RERA documents, recommend units in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.
2 projects · ₹7,999
3 projects · ₹9,999
Within 1 working day
Didn’t help you decide? Full refund — no questions asked.
Compare project details for free →MahaRERA · registration record · read 12 July 2026
MahaRERA · per-unit inventory · saved-file date 18 July 2026
This is a past RERA unit list, not current availability. It does not give the date each unit was sold.
The unit-list date is based on the saved file’s details.
Filed area means carpet area for building units and plot area for plots. Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.
Open MahaRERA · search P52100029439 ↗