homeonpaper.

Builder’s RERA records,
explained for buyers.

The builder’s RERA record, explained

OSIAN ONE AND ONLY PHASE I

AHURA BUILDERS · P52100030568

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For OSIAN ONE AND ONLY PHASE I (P52100030568), 1 of 96 entries were marked unsold in the MahaRERA unit list dated 18 July 2026 (saved-file date).

MahaRERA · per-unit inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find units to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular unit

See its advantages, drawbacks and how it compares with other units in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended units in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Inside this registered phase

How do the buildings compare in the record?

96 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-unit inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and filed areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded filed-area range
E484701054.35–89.60 sq m≈ 585–964 sq ft
F484800045.08–89.60 sq m≈ 485–964 sq ft

Area means carpet area for building units and plot area for plots. Size alone does not establish use or layout. How we read and summarise the filing →

Unit Report

Is this the right
unit for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar units and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your unit in the RERA list.

The same unit number may appear in more than one building. Check both before choosing.

96 listed entries

MahaRERA · per-unit inventory · saved-file date 18 July 2026

RERA unit list, not current availability
Unit / buildingFloor in the recordFiled areaReported statusAgreement valueAssess
1001E / Wing NA1061.48 sq m≈ 662 sq ft · RERA carpet areaSoldNot stated
1002E / Wing NA1061.48 sq m≈ 662 sq ft · RERA carpet areaSoldNot stated
1003E / Wing NA1089.6 sq m≈ 964 sq ft · RERA carpet areaSoldNot stated
1004E / Wing NA1087.58 sq m≈ 943 sq ft · RERA carpet areaSoldNot stated
101E / Wing NA161.48 sq m≈ 662 sq ft · RERA carpet areaSoldNot stated
102E / Wing NA161.48 sq m≈ 662 sq ft · RERA carpet areaSoldNot stated
103E / Wing NA187.58 sq m≈ 943 sq ft · RERA carpet areaSoldNot stated
104E / Wing NA189.6 sq m≈ 964 sq ft · RERA carpet areaSoldNot stated
1101E / Wing NA1161.48 sq m≈ 662 sq ft · RERA carpet areaSoldNot stated
1102E / Wing NA1154.35 sq m≈ 585 sq ft · RERA carpet areaMarked unsoldNot stated
1103E / Wing NA1189.6 sq m≈ 964 sq ft · RERA carpet areaSoldNot stated
1104E / Wing NA1189.6 sq m≈ 964 sq ft · RERA carpet areaSoldNot stated

Read every entry in one table: Read the complete saved unit list.

Choose the unit you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹342,890,000 of an estimated ₹343,976,400 was reported as incurred (99.7%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 19 July 2026 · registration P52100030568

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
FExcavation100.0%
FBasement (if any)100.0%
FPodiums (if any) 100.0%
FPlinth100.0%
FStilt Floor 100.0%
FSlabs of Super Structure95.0%
FInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80.0%
FSanitary Fittings within the flats / premises50.0%
FStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
FExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95.0%
FInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95.0%
EExcavation100.0%
EBasement (if any)100.0%
EPodiums (if any) 100.0%
EPlinth100.0%
EStilt Floor 100.0%
ESlabs of Super Structure95.0%
EInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95.0%
ESanitary Fittings within the flats / premises50.0%
EStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95.0%
EExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95.0%
EInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95.0%

MahaRERA project filing · read 19 July 2026 · registration P52100030568

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹0₹0₹688,010,764₹688,010,764
Actual raised₹17,383,764₹0₹654,913,726₹672,297,490

MahaRERA project filing · read 19 July 2026 · registration P52100030568

Quarterly filing record

20 elapsed quarterly periods in the captured compliance schedule. Active default was recorded for FY 2025-2026.

MahaRERA project filing · read 19 July 2026 · registration P52100030568

Documents named in the filing

  • Commencement certificate · 1 listed
  • Promoter PAN · 1 listed
  • Form 1 — Architect's certificate · 4 listed
  • Form 3 — CA certificate · 4 listed
  • Form 2 — Engineer's certificate · 4 listed
  • Title / search report · 1 listed
  • Form B — Promoter declaration · 1 listed
  • Sanctioned layout plan · 2 listed
  • Sanctioned building plan · 3 listed
  • Occupancy / completion certificate · 1 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100030568

Builder and past records

What else does the record show?

Projects registered under this company

AHURA BUILDERS

5Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

Past records of sales and unsold units

  1. 26 September 2026

    1 marked unsold · 95 sold · 0 booked.

    Saved MahaRERA unit list

  2. 17 September 2026

    1 marked unsold · 95 sold · 0 booked.

    Saved MahaRERA unit list

  3. 9 September 2026

    1 marked unsold · 95 sold · 0 booked.

    Saved MahaRERA unit list

  4. 19 July 2026

    1 marked unsold · 95 sold · 0 booked.

    Saved MahaRERA unit list

These dates show when the records were saved, not when units were sold. Sales may have changed since then, even if the saved counts are the same.

More projects to explore

Other projects in this locality.

These projects list the same locality. They may differ in exact location, property type and price.

Project Comparison Report

Which project should you buy in?
And which unit?

Compare up to three projects. We read their plans and RERA documents, recommend units in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

Create my Comparison Report →

2 projects · ₹7,999
3 projects · ₹9,999

Within 1 working day

Didn’t help you decide? Full refund — no questions asked.

Compare project details for free →

Sources and dates.

MahaRERA · registration record · read 12 July 2026

MahaRERA · per-unit inventory · saved-file date 18 July 2026

This is a past RERA unit list, not current availability. It does not give the date each unit was sold.

The unit-list date is based on the saved file’s details.

Filed area means carpet area for building units and plot area for plots. Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

Open MahaRERA · search P52100030568 ↗
homeonpaper