homeonpaper.

Builder’s RERA records,
explained for buyers.

The builder’s RERA record, explained

Sukhwani Kingsley

Sukhwani Chawla Constructions · P52100031299

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For Sukhwani Kingsley (P52100031299), 471 of 831 entries were marked unsold in the MahaRERA unit list dated 18 July 2026 (saved-file date).

MahaRERA · per-unit inventory · saved-file date 18 July 2026

For Sukhwani Kingsley, ₹8,474 per sq ft of filed area is the median rate across 360 sold or booked entries with prices in the MahaRERA unit list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.

MahaRERA · per-unit inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find units to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular unit

See its advantages, drawbacks and how it compares with other units in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended units in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹8,474/ sq ft filed area

Across 360 sold or booked entries with reported prices. The middle 80% of rates fall between ₹7,950 and ₹9,662.

MahaRERA · per-unit inventory · saved-file date 18 July 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its filed area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold units and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar units sell for?

Compare filed values by building, unit-number pattern and area. See which units were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

831 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-unit inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and filed areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded filed-area range
A807073052.16–90.65 sq m≈ 561–976 sq ft
B7928051050.18–128.51 sq m≈ 540–1,383 sq ft
C807604049.06–72.99 sq m≈ 528–786 sq ft
D807802052.37–92.34 sq m≈ 564–994 sq ft
E807703047.92–84.41 sq m≈ 516–909 sq ft
F807505047.57–84.39 sq m≈ 512–908 sq ft
G40190210126.30–145.46 sq m≈ 1,359–1,566 sq ft
H800080052.89–82.36 sq m≈ 569–887 sq ft
I800080053.89–88.68 sq m≈ 580–955 sq ft
J800080056.61–108.64 sq m≈ 609–1,169 sq ft
MHADA720072045.88 sq m≈ 494 sq ft

Area means carpet area for building units and plot area for plots. Size alone does not establish use or layout. How we read and summarise the filing →

Unit Report

Is this the right
unit for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar units and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your unit in the RERA list.

The same unit number may appear in more than one building. Check both before choosing.

831 listed entries

MahaRERA · per-unit inventory · saved-file date 18 July 2026

RERA unit list, not current availability
Unit / buildingFloor in the recordFiled areaReported statusAgreement valueAssess
A-1001A / Wing NA1090.65 sq m≈ 976 sq ft · RERA carpet areaSold₹10,419,848
A-1002A / Wing NA1090.56 sq m≈ 975 sq ft · RERA carpet areaMarked unsoldNot stated
A-1003A / Wing NA1052.16 sq m≈ 561 sq ft · RERA carpet areaSold₹5,344,800
A-1004A / Wing NA1072.12 sq m≈ 776 sq ft · RERA carpet areaMarked unsoldNot stated
A-101A / Wing NA190.65 sq m≈ 976 sq ft · RERA carpet areaMarked unsoldNot stated
A-102A / Wing NA190.56 sq m≈ 975 sq ft · RERA carpet areaMarked unsoldNot stated
A-103A / Wing NA172.63 sq m≈ 782 sq ft · RERA carpet areaMarked unsoldNot stated
A-104A / Wing NA172.12 sq m≈ 776 sq ft · RERA carpet areaMarked unsoldNot stated
A-1101A / Wing NA1190.65 sq m≈ 976 sq ft · RERA carpet areaMarked unsoldNot stated
A-1102A / Wing NA1190.56 sq m≈ 975 sq ft · RERA carpet areaMarked unsoldNot stated
A-1103A / Wing NA1172.63 sq m≈ 782 sq ft · RERA carpet areaMarked unsoldNot stated
A-1104A / Wing NA1172.12 sq m≈ 776 sq ft · RERA carpet areaMarked unsoldNot stated

Read every entry in one table: Read the complete saved unit list.

Choose the unit you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹1,480,570,902 of an estimated ₹2,408,211,240 was reported as incurred (61.5%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 19 July 2026 · registration P52100031299

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
AExcavation100.0%
ABasement (if any)0.0%
APodiums (if any) 100.0%
APlinth100.0%
AStilt Floor 70.0%
ASlabs of Super Structure0.0%
AInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
ASanitary Fittings within the flats / premises0.0%
AStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
AExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
AInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.11.1%
BExcavation100.0%
BBasement (if any)0.0%
BPodiums (if any) 100.0%
BPlinth100.0%
BStilt Floor 100.0%
BSlabs of Super Structure20.0%
BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises6.0%
BSanitary Fittings within the flats / premises0.0%
BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10.5%
BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.11.1%
CExcavation100.0%
CBasement (if any)0.0%
CPodiums (if any) 100.0%
CPlinth100.0%
CStilt Floor 100.0%
CSlabs of Super Structure100.0%
CInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60.0%
CSanitary Fittings within the flats / premises0.0%
CStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks68.8%
CExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
CInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.11.1%
DExcavation100.0%
DBasement (if any)0.0%
DPodiums (if any) 100.0%
DPlinth100.0%
DStilt Floor 100.0%
DSlabs of Super Structure100.0%
DInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
DSanitary Fittings within the flats / premises100.0%
DStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
DExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
DInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.66.7%
EExcavation100.0%
EBasement (if any)0.0%
EPodiums (if any) 100.0%
EPlinth100.0%
EStilt Floor 100.0%
ESlabs of Super Structure100.0%
EInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
ESanitary Fittings within the flats / premises100.0%
EStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
EExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
EInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.66.7%
FExcavation100.0%
FBasement (if any)0.0%
FPodiums (if any) 100.0%
FPlinth100.0%
FStilt Floor 100.0%
FSlabs of Super Structure100.0%
FInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
FSanitary Fittings within the flats / premises100.0%
FStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
FExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
FInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.66.7%
GExcavation100.0%
GBasement (if any)0.0%
GPodiums (if any) 100.0%
GPlinth100.0%
GStilt Floor 100.0%
GSlabs of Super Structure100.0%
GInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
GSanitary Fittings within the flats / premises100.0%
GStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
GExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
GInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.66.7%
HExcavation100.0%
HBasement (if any)100.0%
HPodiums (if any) 70.0%
HPlinth100.0%
HStilt Floor 0.0%
HSlabs of Super Structure0.0%
HInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
HSanitary Fittings within the flats / premises0.0%
HStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
HExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
HInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.11.1%
IExcavation100.0%
IBasement (if any)0.0%
IPodiums (if any) 70.0%
IPlinth100.0%
IStilt Floor 0.0%
ISlabs of Super Structure0.0%
IInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
ISanitary Fittings within the flats / premises0.0%
IStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
IExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
IInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.11.1%
JExcavation100.0%
JBasement (if any)0.0%
JPodiums (if any) 0.0%
JPlinth100.0%
JStilt Floor 0.0%
JSlabs of Super Structure0.0%
JInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
JSanitary Fittings within the flats / premises0.0%
JStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
JExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
JInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.11.1%
MHADAExcavation100.0%
MHADABasement (if any)0.0%
MHADAPodiums (if any) 0.0%
MHADAPlinth100.0%
MHADAStilt Floor 100.0%
MHADASlabs of Super Structure100.0%
MHADAInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
MHADASanitary Fittings within the flats / premises0.0%
MHADAStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
MHADAExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
MHADAInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.66.7%

MahaRERA project filing · read 19 July 2026 · registration P52100031299

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹100,000,000₹1,000,000,000₹4,994,445,426₹6,094,445,426
Actual raised₹672,695,207₹376,863,556₹1,891,097,681₹2,940,656,444

MahaRERA project filing · read 19 July 2026 · registration P52100031299

Quarterly filing record

18 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 19 July 2026 · registration P52100031299

Documents named in the filing

  • Promoter PAN · 1 listed
  • Form 1 — Architect's certificate · 3 listed
  • Form 3 — CA certificate · 3 listed
  • Form 2 — Engineer's certificate · 3 listed
  • Title / search report · 2 listed
  • Form B — Promoter declaration · 1 listed
  • Sanctioned layout plan · 13 listed
  • Sanctioned building plan · 117 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100031299

Builder and past records

What else does the record show?

Projects registered under this company

Sukhwani Chawla Constructions

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

    Past records of sales and unsold units

    1. 26 September 2026

      471 marked unsold · 360 sold · 0 booked.

      Saved MahaRERA unit list

    2. 17 September 2026

      471 marked unsold · 360 sold · 0 booked.

      Saved MahaRERA unit list

    3. 9 September 2026

      471 marked unsold · 360 sold · 0 booked.

      Saved MahaRERA unit list

    4. 19 July 2026

      471 marked unsold · 360 sold · 0 booked.

      Saved MahaRERA unit list

    These dates show when the records were saved, not when units were sold. Sales may have changed since then, even if the saved counts are the same.

    Project Comparison Report

    Which project should you buy in?
    And which unit?

    Compare up to three projects. We read their plans and RERA documents, recommend units in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 12 July 2026

    MahaRERA · per-unit inventory · saved-file date 18 July 2026

    This is a past RERA unit list, not current availability. It does not give the date each unit was sold.

    The unit-list date is based on the saved file’s details.

    Filed area means carpet area for building units and plot area for plots. Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

    Open MahaRERA · search P52100031299 ↗
    homeonpaper