homeonpaper.

Builder’s RERA records,
explained for buyers.

The builder’s RERA record, explained

Nexus Atrium ABC

Nexus Buildwell · P52100032575

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For Nexus Atrium ABC (P52100032575), 7 of 104 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).

MahaRERA · per-home inventory · saved-file date 18 July 2026

For Nexus Atrium ABC, ₹8,541 per sq ft of carpet area is the median rate across 97 sold or booked entries with prices in the MahaRERA home list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.

MahaRERA · per-home inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹8,541/ sq ft carpet area

Across 97 sold or booked entries with reported prices. The middle 80% of rates fall between ₹7,056 and ₹9,299.

MahaRERA · per-home inventory · saved-file date 18 July 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar homes sell for?

Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

104 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
Building A201406045.72–96.41 sq m≈ 492–1,038 sq ft
Building B424200032.27–57.53 sq m≈ 347–619 sq ft
Building C424101032.27–57.53 sq m≈ 347–619 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

104 listed entries

MahaRERA · per-home inventory · saved-file date 18 July 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
A -102Building A156.54 sq m≈ 609 sq ftMarked unsoldNot stated
A - 101Building A146.08 sq m≈ 496 sq ftMarked unsoldNot stated
A - 103Building A196.14 sq m≈ 1,035 sq ftMarked unsoldNot stated
A - 201Building A246.08 sq m≈ 496 sq ftSold₹4,340,400
A - 202Building A245.72 sq m≈ 492 sq ftSold₹4,340,400
A - 203Building A296.14 sq m≈ 1,035 sq ftSold₹5,546,300
A - 301Building A346.08 sq m≈ 496 sq ftSold₹4,340,400
A - 303Building A396.14 sq m≈ 1,035 sq ftSold₹6,500,000
A - 402Building A456.54 sq m≈ 609 sq ftSold₹3,261,800
A - 502Building A556.54 sq m≈ 609 sq ftSold₹3,500,000
A - 503Building A596.14 sq m≈ 1,035 sq ftSold₹3,261,800
A - 601Building A646.08 sq m≈ 496 sq ftSold₹8,925,750

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹173,555,595 of an estimated ₹173,555,595 was reported as incurred (100.0%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 19 July 2026 · registration P52100032575

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
Building AExcavation100.0%
Building ABasement (if any)100.0%
Building APodiums (if any) 100.0%
Building APlinth100.0%
Building AStilt Floor 0.0%
Building ASlabs of Super Structure100.0%
Building AInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
Building ASanitary Fittings within the flats / premises100.0%
Building AStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Building AExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
Building AInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
Building BExcavation100.0%
Building BBasement (if any)100.0%
Building BPodiums (if any) 100.0%
Building BPlinth100.0%
Building BStilt Floor 0.0%
Building BSlabs of Super Structure100.0%
Building BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
Building BSanitary Fittings within the flats / premises100.0%
Building BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Building BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
Building BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
Building CExcavation100.0%
Building CBasement (if any)100.0%
Building CPodiums (if any) 100.0%
Building CPlinth100.0%
Building CStilt Floor 0.0%
Building CSlabs of Super Structure100.0%
Building CInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
Building CSanitary Fittings within the flats / premises100.0%
Building CStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Building CExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
Building CInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%

MahaRERA project filing · read 19 July 2026 · registration P52100032575

Reported deadline extensions

Revised targetReason given by the builder
31 January 2026I respectfully request that my application for extension up to 31.01.2026 be processed and approved. Although the OC has already been received on 11/09/2025, the extension is essential to complete the correction process on the MahaRERA portal before applying for project closure. Since the originally registered BUA and number of units differ from the revised approved plans, direct closure is not possible. Additionally, MahaRERA has raised a query regarding expiry of the project completion date. Therefore, I request that the Authority kindly grant the extension, enabling us to complete the correction process and subsequently apply for project closure.

MahaRERA project filing · read 19 July 2026 · registration P52100032575

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹50,000,000₹0₹183,293,720₹233,293,720
Actual raised₹-36,180,229₹0₹255,297,742₹219,117,513

MahaRERA project filing · read 19 July 2026 · registration P52100032575

Quarterly filing record

17 elapsed quarterly periods in the captured compliance schedule. Active default was recorded for FY 2025-2026.

MahaRERA project filing · read 19 July 2026 · registration P52100032575

Documents named in the filing

  • Form 1 — Architect's certificate · 9 listed
  • Form 3 — CA certificate · 12 listed
  • Form 2 — Engineer's certificate · 10 listed
  • Form B — Promoter declaration · 2 listed
  • Title / search report · 4 listed
  • Sanctioned layout plan · 2 listed
  • Sanctioned building plan · 12 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100032575

Builder and past records

What else does the record show?

Projects registered under this company

Nexus Buildwell

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

    Past records of sales and unsold homes

    1. 26 September 2026

      7 marked unsold · 97 sold · 0 booked.

      Saved MahaRERA home list

    2. 17 September 2026

      7 marked unsold · 97 sold · 0 booked.

      Saved MahaRERA home list

    3. 9 September 2026

      7 marked unsold · 97 sold · 0 booked.

      Saved MahaRERA home list

    4. 19 July 2026

      7 marked unsold · 97 sold · 0 booked.

      Saved MahaRERA home list

    These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

    More projects to explore

    Other projects in this locality.

    These projects list the same locality. They may differ in exact location, home type and price.

    Project Comparison Report

    Which project should you buy in?
    And which home?

    Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 12 July 2026

    MahaRERA · per-home inventory · saved-file date 18 July 2026

    This is a past RERA home list, not current availability. It does not give the date each home was sold.

    The home-list date is based on the saved file’s details.

    Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

    Open MahaRERA · search P52100032575 ↗
    homeonpaper