homeonpaper.

Builder’s RERA records,
explained for buyers.

The builder’s RERA record, explained

KALPAVRUKSHA-PHASE-I- A AND B

SUDARSHAN DATTATRAYA SHANWARE · P52100033723

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For KALPAVRUKSHA-PHASE-I- A AND B (P52100033723), 104 of 104 entries were marked unsold in the MahaRERA unit list dated 18 July 2026 (saved-file date).

MahaRERA · per-unit inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find units to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular unit

See its advantages, drawbacks and how it compares with other units in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended units in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Inside this registered phase

How do the buildings compare in the record?

104 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-unit inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and filed areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded filed-area range
KALPAVRUKSHA-PHASE I B WING480048040.32–64.57 sq m≈ 434–695 sq ft
KALPAVRUKSHA-PHASE-I A WING560056040.32–64.57 sq m≈ 434–695 sq ft

Area means carpet area for building units and plot area for plots. Size alone does not establish use or layout. How we read and summarise the filing →

Unit Report

Is this the right
unit for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar units and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your unit in the RERA list.

The same unit number may appear in more than one building. Check both before choosing.

104 listed entries

MahaRERA · per-unit inventory · saved-file date 18 July 2026

RERA unit list, not current availability
Unit / buildingFloor in the recordFiled areaReported statusAgreement valueAssess
101KALPAVRUKSHA-PHASE I B WING / Wing NA164.57 sq m≈ 695 sq ft · RERA carpet areaMarked unsoldNot stated
102KALPAVRUKSHA-PHASE I B WING / Wing NA144.04 sq m≈ 474 sq ft · RERA carpet areaMarked unsoldNot stated
103KALPAVRUKSHA-PHASE I B WING / Wing NA144.04 sq m≈ 474 sq ft · RERA carpet areaMarked unsoldNot stated
104KALPAVRUKSHA-PHASE I B WING / Wing NA164.57 sq m≈ 695 sq ft · RERA carpet areaMarked unsoldNot stated
105KALPAVRUKSHA-PHASE I B WING / Wing NA164.57 sq m≈ 695 sq ft · RERA carpet areaMarked unsoldNot stated
106KALPAVRUKSHA-PHASE I B WING / Wing NA144.04 sq m≈ 474 sq ft · RERA carpet areaMarked unsoldNot stated
107KALPAVRUKSHA-PHASE I B WING / Wing NA144.04 sq m≈ 474 sq ft · RERA carpet areaMarked unsoldNot stated
108KALPAVRUKSHA-PHASE I B WING / Wing NA164.57 sq m≈ 695 sq ft · RERA carpet areaMarked unsoldNot stated
201KALPAVRUKSHA-PHASE I B WING / Wing NA259.27 sq m≈ 638 sq ft · RERA carpet areaMarked unsoldNot stated
202KALPAVRUKSHA-PHASE I B WING / Wing NA240.32 sq m≈ 434 sq ft · RERA carpet areaMarked unsoldNot stated
203KALPAVRUKSHA-PHASE I B WING / Wing NA240.32 sq m≈ 434 sq ft · RERA carpet areaMarked unsoldNot stated
204KALPAVRUKSHA-PHASE I B WING / Wing NA259.27 sq m≈ 638 sq ft · RERA carpet areaMarked unsoldNot stated

Read every entry in one table: Read the complete saved unit list.

Choose the unit you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹62,033,960 of an estimated ₹190,547,249 was reported as incurred (32.6%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 19 July 2026 · registration P52100033723

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
KALPAVRUKSHA-PHASE-I A WINGExcavation100.0%
KALPAVRUKSHA-PHASE-I A WINGBasement (if any)70.0%
KALPAVRUKSHA-PHASE-I A WINGPodiums (if any) 70.0%
KALPAVRUKSHA-PHASE-I A WINGPlinth100.0%
KALPAVRUKSHA-PHASE-I A WINGStilt Floor 0.0%
KALPAVRUKSHA-PHASE-I A WINGSlabs of Super Structure70.0%
KALPAVRUKSHA-PHASE-I A WINGInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20.0%
KALPAVRUKSHA-PHASE-I A WINGSanitary Fittings within the flats / premises5.0%
KALPAVRUKSHA-PHASE-I A WINGStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20.0%
KALPAVRUKSHA-PHASE-I A WINGExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
KALPAVRUKSHA-PHASE-I A WINGInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
KALPAVRUKSHA-PHASE I B WINGExcavation100.0%
KALPAVRUKSHA-PHASE I B WINGBasement (if any)20.0%
KALPAVRUKSHA-PHASE I B WINGPodiums (if any) 0.0%
KALPAVRUKSHA-PHASE I B WINGPlinth30.0%
KALPAVRUKSHA-PHASE I B WINGStilt Floor 0.0%
KALPAVRUKSHA-PHASE I B WINGSlabs of Super Structure0.0%
KALPAVRUKSHA-PHASE I B WINGInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
KALPAVRUKSHA-PHASE I B WINGSanitary Fittings within the flats / premises0.0%
KALPAVRUKSHA-PHASE I B WINGStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
KALPAVRUKSHA-PHASE I B WINGExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
KALPAVRUKSHA-PHASE I B WINGInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 19 July 2026 · registration P52100033723

Reported deadline extensions

Revised targetReason given by the builder
31 December 2027Due to revisions made to the building plan for the project, we now require an extension of the project timeline until 31/12/2027.

MahaRERA project filing · read 19 July 2026 · registration P52100033723

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹70,000,000₹0₹116,874,285₹186,874,285
Actual raised₹64,359,330₹0₹0₹64,359,330

MahaRERA project filing · read 19 July 2026 · registration P52100033723

Quarterly filing record

19 elapsed quarterly periods in the captured compliance schedule. Active default was recorded for FY 2025-2026.

MahaRERA project filing · read 19 July 2026 · registration P52100033723

Documents named in the filing

  • Promoter PAN · 1 listed
  • Commencement certificate · 2 listed
  • Form 1 — Architect's certificate · 7 listed
  • Form 3 — CA certificate · 7 listed
  • Form 2 — Engineer's certificate · 7 listed
  • Form B — Promoter declaration · 2 listed
  • Title / search report · 3 listed
  • Sanctioned building plan · 13 listed
  • Sanctioned layout plan · 1 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100033723

Builder and past records

What else does the record show?

Projects registered under this company

SUDARSHAN DATTATRAYA SHANWARE

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

    Past records of sales and unsold units

    1. 26 September 2026

      104 marked unsold · 0 sold · 0 booked.

      Saved MahaRERA unit list

    2. 18 September 2026

      104 marked unsold · 0 sold · 0 booked.

      Saved MahaRERA unit list

    3. 9 September 2026

      104 marked unsold · 0 sold · 0 booked.

      Saved MahaRERA unit list

    4. 19 July 2026

      104 marked unsold · 0 sold · 0 booked.

      Saved MahaRERA unit list

    These dates show when the records were saved, not when units were sold. Sales may have changed since then, even if the saved counts are the same.

    Project Comparison Report

    Which project should you buy in?
    And which unit?

    Compare up to three projects. We read their plans and RERA documents, recommend units in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 12 July 2026

    MahaRERA · per-unit inventory · saved-file date 18 July 2026

    This is a past RERA unit list, not current availability. It does not give the date each unit was sold.

    The unit-list date is based on the saved file’s details.

    Filed area means carpet area for building units and plot area for plots. Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

    Open MahaRERA · search P52100033723 ↗
    homeonpaper