homeonpaper.

Builder’s RERA records,
explained for buyers.

The builder’s RERA record, explained

BLOOM RESIDENCY - A, B and Commercial Wing

BLOOM INFRASTRUCTURE · P52100034545

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For BLOOM RESIDENCY - A, B and Commercial Wing (P52100034545), 59 of 218 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).

MahaRERA · per-home inventory · saved-file date 18 July 2026

For BLOOM RESIDENCY - A, B and Commercial Wing, ₹6,284 per sq ft of carpet area is the median rate across 79 sold or booked entries with prices in the MahaRERA home list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.

MahaRERA · per-home inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹6,284/ sq ft carpet area

Across 79 sold or booked entries with reported prices. The middle 80% of rates fall between ₹5,928 and ₹7,763.

MahaRERA · per-home inventory · saved-file date 18 July 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar homes sell for?

Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

218 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
BLOOM SQUARE COMMERCIAL BUILDING506025199.35–232.00 sq m≈ 101–2,497 sq ft
WING A84240322826.03–41.00 sq m≈ 280–441 sq ft
WING B8449023326.03–51.43 sq m≈ 280–554 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

218 listed entries

MahaRERA · per-home inventory · saved-file date 18 July 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
Shop - 1BLOOM SQUARE COMMERCIAL BUILDING20511.75 sq m≈ 126 sq ftMarked unsoldNot stated
Shop - 1BLOOM SQUARE COMMERCIAL BUILDING136.38 sq m≈ 392 sq ftMarked unsoldNot stated
Shop - 1BLOOM SQUARE COMMERCIAL BUILDING236.38 sq m≈ 392 sq ftNot for saleNot stated
Shop - 1BLOOM SQUARE COMMERCIAL BUILDING3232.0 sq m≈ 2,497 sq ftMarked unsoldNot stated
Shop - 10BLOOM SQUARE COMMERCIAL BUILDING2059.35 sq m≈ 101 sq ftMarked unsoldNot stated
Shop - 10BLOOM SQUARE COMMERCIAL BUILDING1138.8 sq m≈ 1,494 sq ftMarked unsoldNot stated
Shop - 10BLOOM SQUARE COMMERCIAL BUILDING2138.8 sq m≈ 1,494 sq ftNot for saleNot stated
Shop - 11BLOOM SQUARE COMMERCIAL BUILDING2059.35 sq m≈ 101 sq ftMarked unsoldNot stated
Shop - 12BLOOM SQUARE COMMERCIAL BUILDING2059.35 sq m≈ 101 sq ftNot for saleNot stated
Shop - 13BLOOM SQUARE COMMERCIAL BUILDING2059.35 sq m≈ 101 sq ftNot for saleNot stated
Shop - 14BLOOM SQUARE COMMERCIAL BUILDING2059.35 sq m≈ 101 sq ftNot for saleNot stated
Shop - 15BLOOM SQUARE COMMERCIAL BUILDING2059.35 sq m≈ 101 sq ftNot for saleNot stated

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹183,303,010 of an estimated ₹198,303,047 was reported as incurred (92.4%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 19 July 2026 · registration P52100034545

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
BLOOM SQUARE COMMERCIAL BUILDINGExcavation100.0%
BLOOM SQUARE COMMERCIAL BUILDINGBasement (if any)100.0%
BLOOM SQUARE COMMERCIAL BUILDINGPodiums (if any) 0.0%
BLOOM SQUARE COMMERCIAL BUILDINGPlinth100.0%
BLOOM SQUARE COMMERCIAL BUILDINGStilt Floor 100.0%
BLOOM SQUARE COMMERCIAL BUILDINGSlabs of Super Structure100.0%
BLOOM SQUARE COMMERCIAL BUILDINGInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BLOOM SQUARE COMMERCIAL BUILDINGSanitary Fittings within the flats / premises100.0%
BLOOM SQUARE COMMERCIAL BUILDINGStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BLOOM SQUARE COMMERCIAL BUILDINGExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BLOOM SQUARE COMMERCIAL BUILDINGInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
WING AExcavation100.0%
WING ABasement (if any)100.0%
WING APodiums (if any) 0.0%
WING APlinth100.0%
WING AStilt Floor 100.0%
WING ASlabs of Super Structure100.0%
WING AInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60.0%
WING ASanitary Fittings within the flats / premises35.0%
WING AStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70.0%
WING AExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.55.0%
WING AInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25.0%
WING BExcavation100.0%
WING BBasement (if any)100.0%
WING BPodiums (if any) 0.0%
WING BPlinth100.0%
WING BStilt Floor 100.0%
WING BSlabs of Super Structure100.0%
WING BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
WING BSanitary Fittings within the flats / premises100.0%
WING BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
WING BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
WING BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%

MahaRERA project filing · read 19 July 2026 · registration P52100034545

Reported deadline extensions

Revised targetReason given by the builder
30 December 2025This delay is largely due to underestimating the time and resources required for key phases of the project, including finalizing the design, procuring materials, obtaining regulatory approvals, and managing labor shortages. While we are making every effort to adhere to the committed timeline, challenges such as delays have been compounded. We will endeavor to complete the work of the project by 30 December 2025, ensuring that all aspects of the project are executed to the highest standards.
31 December 2026Dear Sir/Ma’am, We, Bloom Infrastructure, hereby declare the following with respect to the project “BLOOM RESIDENCY - A, B and Commercial Wing” bearing registration number P52100034545 registered under MahaRERA 1. Status of Work Completed: We are pleased to inform you that we have completed the 100% of RCC (Reinforced Cement Concrete) work for the buildings. Currently, we are undertaking the finishing work, which includes plastering, flooring, electrical fittings, and other essential internal and external works. 2. Expected Timeline for Completion: We are committed to completing all balance works and applying for the Occupation Certificate (OC) promptly. We anticipate receiving the OC before 31st December 2026. 3. Consent from Allottees: We have obtained consent from 51.90% of the allottees, indicating their support for the extension request and the continuation of the project towards timely completion. 4. Reason for Delay: The delay in completion has been due to unforeseen challenges, Despite these hurdles, we have maintained steady progress and are now in the final stages of the project. 5. Attached herewith the CPM Report and detailed project planning schedule outlining the timeline and milestones for completing the remaining work. 6. Request for Extension: In view of the above, we respectfully request an extension of the project completion timeline to ensure a smooth transition and timely delivery to our valued allottees. This extension will enable us to complete all pending works with due diligence and quality standards. We sincerely urge you to grant the requested extension, which is crucial for the successful completion of the project and to uphold the commitments made to our allottees.

MahaRERA project filing · read 19 July 2026 · registration P52100034545

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹70,000,000₹50,000,000₹153,725,007₹273,725,007
Actual raised₹70,000,000₹37,763,630₹110,231,351₹217,994,981

MahaRERA project filing · read 19 July 2026 · registration P52100034545

Quarterly filing record

16 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 19 July 2026 · registration P52100034545

Documents named in the filing

  • Promoter PAN · 1 listed
  • Form 1 — Architect's certificate · 5 listed
  • Form 3 — CA certificate · 6 listed
  • Form 2 — Engineer's certificate · 5 listed
  • Title / search report · 2 listed
  • Form B — Promoter declaration · 2 listed
  • Sanctioned layout plan · 1 listed
  • Sanctioned building plan · 6 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100034545

Builder and past records

What else does the record show?

Projects registered under this company

BLOOM INFRASTRUCTURE

2Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

Past records of sales and unsold homes

  1. 26 September 2026

    59 marked unsold · 79 sold · 0 booked.

    Saved MahaRERA home list

  2. 18 September 2026

    59 marked unsold · 79 sold · 0 booked.

    Saved MahaRERA home list

  3. 9 September 2026

    59 marked unsold · 79 sold · 0 booked.

    Saved MahaRERA home list

  4. 19 July 2026

    59 marked unsold · 79 sold · 0 booked.

    Saved MahaRERA home list

These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

More projects to explore

Other projects in this locality.

These projects list the same locality. They may differ in exact location, home type and price.

Project Comparison Report

Which project should you buy in?
And which home?

Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

Create my Comparison Report →

2 projects · ₹7,999
3 projects · ₹9,999

Within 1 working day

Didn’t help you decide? Full refund — no questions asked.

Compare project details for free →

Sources and dates.

MahaRERA · registration record · read 12 July 2026

MahaRERA · per-home inventory · saved-file date 18 July 2026

This is a past RERA home list, not current availability. It does not give the date each home was sold.

The home-list date is based on the saved file’s details.

Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

Open MahaRERA · search P52100034545 ↗
homeonpaper