The builder’s RERA record, explained

The Camelia Phase - 1

Akanksha Builders · P52100045231

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For The Camelia Phase - 1 (P52100045231), 37 of 426 entries were marked unsold in the MahaRERA unit list read 9 September 2026.

MahaRERA · per-unit inventory · read 9 September 2026

For The Camelia Phase - 1, ₹9,367 per sq ft of filed area is the median rate across 325 sold or booked entries with prices in the MahaRERA unit list read 9 September 2026. These are historical agreement values, not current asking prices.

MahaRERA · per-unit inventory · read 9 September 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find units to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular unit

See its advantages, drawbacks and how it compares with other units in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended units in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹9,367/ sq ft filed area

Across 325 sold or booked entries with reported prices. The middle 80% of rates fall between ₹8,521 and ₹10,183.

MahaRERA · per-unit inventory · read 9 September 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its filed area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold units and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar units sell for?

Compare filed values by building, unit-number pattern and area. See which units were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

426 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-unit inventory · read 9 September 2026

Scroll sideways to see all columns.

Building names, sale status and filed areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded filed-area range
Wing - B12495012861.09–63.42 sq m≈ 658–683 sq ft
Wing - C plus MHADA21813819362542.28–64.58 sq m≈ 455–695 sq ft
Wing A8472101145.55–167.13 sq m≈ 490–1,799 sq ft

Area means carpet area for building units and plot area for plots. Size alone does not establish use or layout. How we read and summarise the filing →

Unit Report

Is this the right
unit for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar units and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your unit in the RERA list.

The same unit number may appear in more than one building. Check both before choosing.

426 listed entries

MahaRERA · per-unit inventory · read 9 September 2026

RERA unit list, not current availability
Unit / buildingFloor in the recordFiled areaReported statusAgreement valueAssess
B1001Wing - B / Wing NA1061.09 sq m≈ 658 sq ft · RERA carpet areaSold₹6,223,949
B1002Wing - B / Wing NA1063.12 sq m≈ 679 sq ft · RERA carpet areaSold₹6,214,300
B1003Wing - B / Wing NA1063.12 sq m≈ 679 sq ft · RERA carpet areaSold₹6,223,600
B1004Wing - B / Wing NA1063.42 sq m≈ 683 sq ft · RERA carpet areaSold₹6,334,300
B1005Wing - B / Wing NA1063.42 sq m≈ 683 sq ft · RERA carpet areaSold₹6,312,385
B1006Wing - B / Wing NA1063.12 sq m≈ 679 sq ft · RERA carpet areaSold₹6,285,700
B1007Wing - B / Wing NA1063.12 sq m≈ 679 sq ft · RERA carpet areaSold₹6,276,350
B1008Wing - B / Wing NA1061.09 sq m≈ 658 sq ft · RERA carpet areaSold₹5,910,600
B101Wing - B / Wing NA161.09 sq m≈ 658 sq ft · RERA carpet areaOwner investorNot stated
B102Wing - B / Wing NA163.12 sq m≈ 679 sq ft · RERA carpet areaOwner investorNot stated
B103Wing - B / Wing NA163.12 sq m≈ 679 sq ft · RERA carpet areaOwner investorNot stated
B104Wing - B / Wing NA163.42 sq m≈ 683 sq ft · RERA carpet areaOwner investorNot stated

Read every entry in one table: Read the complete saved unit list.

Choose the unit you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹931,856,681 of an estimated ₹1,254,002,259 was reported as incurred (74.3%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 19 July 2026 · registration P52100045231

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
Wing - BExcavation100.0%
Wing - BBasement (if any)100.0%
Wing - BPodiums (if any) 100.0%
Wing - BPlinth100.0%
Wing - BStilt Floor 0.0%
Wing - BSlabs of Super Structure100.0%
Wing - BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98.0%
Wing - BSanitary Fittings within the flats / premises50.0%
Wing - BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80.0%
Wing - BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.96.0%
Wing - BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50.0%
Wing - C plus MHADAExcavation100.0%
Wing - C plus MHADABasement (if any)100.0%
Wing - C plus MHADAPodiums (if any) 100.0%
Wing - C plus MHADAPlinth100.0%
Wing - C plus MHADAStilt Floor 0.0%
Wing - C plus MHADASlabs of Super Structure100.0%
Wing - C plus MHADAInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
Wing - C plus MHADASanitary Fittings within the flats / premises50.0%
Wing - C plus MHADAStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80.0%
Wing - C plus MHADAExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95.0%
Wing - C plus MHADAInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50.0%
Wing AExcavation100.0%
Wing ABasement (if any)100.0%
Wing APodiums (if any) 100.0%
Wing APlinth100.0%
Wing AStilt Floor 0.0%
Wing ASlabs of Super Structure100.0%
Wing AInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises83.33%
Wing ASanitary Fittings within the flats / premises55.0%
Wing AStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85.0%
Wing AExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.87.5%
Wing AInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25.0%

MahaRERA project filing · read 19 July 2026 · registration P52100045231

Reported deadline extensions

Revised targetReason given by the builder
31 January 2027We hereby state and declare that there has been a delay in the completion of the project as well as in the submission of the present request due to circumstances beyond our control. The delay has occurred due to unforeseen factors, including disruption in the supply chain of construction materials. The shipment of essential materials was put on hold due to the prevailing war situation, resulting in an inability to procure the required materials for a significant period. Further, there was a widespread shortage of gas during the said period, which directly impacted project execution. The gas shortage severely affected the tiles manufacturing industry, a critical component in construction activities. As a result, tile manufacturing units were either shut down or operating at limited capacity, leading to non-availability and delayed supply of tiles required for the project. Additionally, amendments to the previously sanctioned plans required approval from the concerned authority, which took around 4–5 months. After approval, these changes had to be implemented in the construction process, which further delayed the completion of the project. Despite these challenges, we confirm that we are taking all necessary steps and making continuous efforts to resolve the issues and complete the remaining work at the earliest. In view of the above circumstances, we kindly request an extension until 31/01/2027 for completion of the project and compliance with all applicable regulatory requirements

MahaRERA project filing · read 19 July 2026 · registration P52100045231

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹425,614,920₹0₹638,422,380₹1,064,037,300
Actual raised₹0₹0₹1,618,243,971₹1,618,243,971

MahaRERA project filing · read 19 July 2026 · registration P52100045231

Quarterly filing record

15 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 19 July 2026 · registration P52100045231

Documents named in the filing

  • Promoter PAN · 1 listed
  • Form 1 — Architect's certificate · 3 listed
  • Form 3 — CA certificate · 4 listed
  • Form 2 — Engineer's certificate · 4 listed
  • Form B — Promoter declaration · 1 listed
  • Title / search report · 1 listed
  • Sanctioned layout plan · 5 listed
  • Sanctioned building plan · 60 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100045231

Builder and past records

What else does the record show?

Projects registered under this company

Akanksha Builders

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

    Past records of sales and unsold units

    1. 27 September 2026

      37 marked unsold · 305 sold · 20 booked.

      Saved MahaRERA unit list

    2. 18 September 2026

      37 marked unsold · 305 sold · 20 booked.

      Saved MahaRERA unit list

    3. 9 September 2026

      37 marked unsold · 305 sold · 20 booked.

      Saved MahaRERA unit list

    4. 19 July 2026

      56 marked unsold · 305 sold · 1 booked.

      Saved MahaRERA unit list

    These dates show when the records were saved, not when units were sold. Sales may have changed since then, even if the saved counts are the same.

    More projects to explore

    Other projects in this locality.

    These projects list the same locality. They may differ in exact location, property type and price.

    Project Comparison Report

    Which project should you buy in?
    And which unit?

    Compare up to three projects. We read their plans and RERA documents, recommend units in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 12 July 2026

    MahaRERA · per-unit inventory · read 9 September 2026

    This is a past RERA unit list, not current availability. It does not give the date each unit was sold.

    Filed area means carpet area for building units and plot area for plots. Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.