For LUSH RESIDENCES (P52100046871), 257 of 911 entries were marked unsold in the MahaRERA unit list dated 18 July 2026 (saved-file date).

MahaRERA · per-unit inventory · saved-file date 18 July 2026

For LUSH RESIDENCES, ₹8,922 per sq ft of filed area is the median rate across 654 sold or booked entries with prices in the MahaRERA unit list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.

MahaRERA · per-unit inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find units to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular unit

See its advantages, drawbacks and how it compares with other units in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended units in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹8,922/ sq ft filed area

Across 654 sold or booked entries with reported prices. The middle 80% of rates fall between ₹6,846 and ₹9,337.

MahaRERA · per-unit inventory · saved-file date 18 July 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its filed area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold units and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar units sell for?

Compare filed values by building, unit-number pattern and area. See which units were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

911 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-unit inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and filed areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded filed-area range
TOWER A175020155050.08–96.93 sq m≈ 539–1,043 sq ft
TOWER B176164012046.96–95.46 sq m≈ 505–1,028 sq ft
TOWER C17517005046.96–95.46 sq m≈ 505–1,028 sq ft
TOWER D17517302046.96–95.46 sq m≈ 505–1,028 sq ft
TOWER E MHADA780078039.14 sq m≈ 421 sq ft
TOWER F13212705061.88–122.90 sq m≈ 666–1,323 sq ft

Area means carpet area for building units and plot area for plots. Size alone does not establish use or layout. How we read and summarise the filing →

Unit Report

Is this the right
unit for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar units and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your unit in the RERA list.

The same unit number may appear in more than one building. Check both before choosing.

911 listed entries

MahaRERA · per-unit inventory · saved-file date 18 July 2026

RERA unit list, not current availability
Unit / buildingFloor in the recordFiled areaReported statusAgreement valueAssess
1001TOWER A / Wing NA1096.93 sq m≈ 1,043 sq ft · RERA carpet areaMarked unsoldNot stated
1002TOWER A / Wing NA1094.21 sq m≈ 1,014 sq ft · RERA carpet areaMarked unsoldNot stated
1003TOWER A / Wing NA1068.37 sq m≈ 736 sq ft · RERA carpet areaMarked unsoldNot stated
1004TOWER A / Wing NA1069.39 sq m≈ 747 sq ft · RERA carpet areaBooked₹7,975,750
1005TOWER A / Wing NA1096.93 sq m≈ 1,043 sq ft · RERA carpet areaMarked unsoldNot stated
1006TOWER A / Wing NA1094.21 sq m≈ 1,014 sq ft · RERA carpet areaMarked unsoldNot stated
1007TOWER A / Wing NA1071.69 sq m≈ 772 sq ft · RERA carpet areaBooked₹8,343,000
1008TOWER A / Wing NA1071.69 sq m≈ 772 sq ft · RERA carpet areaMarked unsoldNot stated
101TOWER A / Wing NA196.93 sq m≈ 1,043 sq ft · RERA carpet areaMarked unsoldNot stated
102TOWER A / Wing NA194.21 sq m≈ 1,014 sq ft · RERA carpet areaMarked unsoldNot stated
104TOWER A / Wing NA169.39 sq m≈ 747 sq ft · RERA carpet areaMarked unsoldNot stated
105TOWER A / Wing NA196.93 sq m≈ 1,043 sq ft · RERA carpet areaMarked unsoldNot stated

Read every entry in one table: Read the complete saved unit list.

Choose the unit you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹2,261,227,982 of an estimated ₹3,253,362,838 was reported as incurred (69.5%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 19 July 2026 · registration P52100046871

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
TOWER AExcavation100.0%
TOWER ABasement (if any)100.0%
TOWER APodiums (if any) 75.0%
TOWER APlinth100.0%
TOWER AStilt Floor 0.0%
TOWER ASlabs of Super Structure0.0%
TOWER AInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
TOWER ASanitary Fittings within the flats / premises0.0%
TOWER AStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
TOWER AExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
TOWER AInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
TOWER BExcavation100.0%
TOWER BBasement (if any)100.0%
TOWER BPodiums (if any) 100.0%
TOWER BPlinth100.0%
TOWER BStilt Floor 100.0%
TOWER BSlabs of Super Structure95.0%
TOWER BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15.0%
TOWER BSanitary Fittings within the flats / premises0.0%
TOWER BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
TOWER BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
TOWER BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
TOWER CExcavation100.0%
TOWER CBasement (if any)100.0%
TOWER CPodiums (if any) 100.0%
TOWER CPlinth100.0%
TOWER CStilt Floor 100.0%
TOWER CSlabs of Super Structure100.0%
TOWER CInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
TOWER CSanitary Fittings within the flats / premises0.0%
TOWER CStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70.0%
TOWER CExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40.0%
TOWER CInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
TOWER DExcavation100.0%
TOWER DBasement (if any)100.0%
TOWER DPodiums (if any) 100.0%
TOWER DPlinth100.0%
TOWER DStilt Floor 100.0%
TOWER DSlabs of Super Structure100.0%
TOWER DInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90.0%
TOWER DSanitary Fittings within the flats / premises10.0%
TOWER DStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95.0%
TOWER DExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
TOWER DInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50.0%
TOWER E MHADAExcavation100.0%
TOWER E MHADABasement (if any)100.0%
TOWER E MHADAPodiums (if any) 100.0%
TOWER E MHADAPlinth100.0%
TOWER E MHADAStilt Floor 100.0%
TOWER E MHADASlabs of Super Structure100.0%
TOWER E MHADAInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
TOWER E MHADASanitary Fittings within the flats / premises10.0%
TOWER E MHADAStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90.0%
TOWER E MHADAExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
TOWER E MHADAInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50.0%
TOWER FExcavation100.0%
TOWER FBasement (if any)100.0%
TOWER FPodiums (if any) 100.0%
TOWER FPlinth100.0%
TOWER FStilt Floor 100.0%
TOWER FSlabs of Super Structure100.0%
TOWER FInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90.0%
TOWER FSanitary Fittings within the flats / premises10.0%
TOWER FStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90.0%
TOWER FExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
TOWER FInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50.0%

MahaRERA project filing · read 19 July 2026 · registration P52100046871

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹150,000,000₹400,000,000₹1,682,220,664₹2,292,220,664
Actual raised₹544,677,454₹0₹2,716,163,849₹3,530,713,885

MahaRERA project filing · read 19 July 2026 · registration P52100046871

Quarterly filing record

15 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 19 July 2026 · registration P52100046871

Documents named in the filing

  • Promoter PAN · 2 listed
  • Occupancy / completion certificate · 2 listed
  • Form 1 — Architect's certificate · 13 listed
  • Form 3 — CA certificate · 11 listed
  • Form 2 — Engineer's certificate · 6 listed
  • Title / search report · 2 listed
  • Form B — Promoter declaration · 2 listed
  • Sanctioned layout plan · 7 listed
  • Sanctioned building plan · 42 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100046871

Builder and past records

What else does the record show?

Projects registered under this company

LUSH RESIDENCES LLP

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

    Past records of sales and unsold units

    1. 27 September 2026

      257 marked unsold · 634 sold · 20 booked.

      Saved MahaRERA unit list

    2. 18 September 2026

      257 marked unsold · 634 sold · 20 booked.

      Saved MahaRERA unit list

    3. 10 September 2026

      257 marked unsold · 634 sold · 20 booked.

      Saved MahaRERA unit list

    4. 19 July 2026

      257 marked unsold · 634 sold · 20 booked.

      Saved MahaRERA unit list

    These dates show when the records were saved, not when units were sold. Sales may have changed since then, even if the saved counts are the same.

    Project Comparison Report

    Which project should you buy in?
    And which unit?

    Compare up to three projects. We read their plans and RERA documents, recommend units in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 12 July 2026

    MahaRERA · per-unit inventory · saved-file date 18 July 2026

    This is a past RERA unit list, not current availability. It does not give the date each unit was sold.

    The unit-list date is based on the saved file’s details.

    Filed area means carpet area for building units and plot area for plots. Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

    Open MahaRERA · search P52100046871 ↗