homeonpaper.

Builder’s RERA records,
explained for buyers.

The builder’s RERA record, explained

SHIVALAY 21

SHREE GURUDATTA DEVELOPERS · P52100047092

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For SHIVALAY 21 (P52100047092), 80 of 108 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).

MahaRERA · per-home inventory · saved-file date 18 July 2026

For SHIVALAY 21, ₹8,563 per sq ft of carpet area is the median rate across 27 sold or booked entries with prices in the MahaRERA home list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.

MahaRERA · per-home inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹8,563/ sq ft carpet area

Across 27 sold or booked entries with reported prices. The middle 80% of rates fall between ₹7,329 and ₹9,527.

MahaRERA · per-home inventory · saved-file date 18 July 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar homes sell for?

Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

108 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
BUILDING A241805147.64–48.28 sq m≈ 513–520 sq ft
BUILDING B289019038.03 sq m≈ 409 sq ft
BUILDING C280028062.55 sq m≈ 673 sq ft
BUILDING D280028062.55 sq m≈ 673 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

108 listed entries

MahaRERA · per-home inventory · saved-file date 18 July 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
A-101BUILDING A147.64 sq m≈ 513 sq ftMarked unsoldNot stated
A-102BUILDING A147.64 sq m≈ 513 sq ftSold₹4,490,000
A-103BUILDING A148.28 sq m≈ 520 sq ftSold₹4,450,000
A-104BUILDING A148.28 sq m≈ 520 sq ftMarked unsoldNot stated
A-201BUILDING A247.64 sq m≈ 513 sq ftSold₹4,450,000
A-202BUILDING A247.64 sq m≈ 513 sq ftSold₹4,000,000
A-203BUILDING A248.28 sq m≈ 520 sq ftSold₹4,000,000
A-204BUILDING A248.28 sq m≈ 520 sq ftSold₹4,000,000
A-301BUILDING A347.64 sq m≈ 513 sq ftSold₹4,000,000
A-302BUILDING A347.64 sq m≈ 513 sq ftNot for saleNot stated
A-303BUILDING A348.28 sq m≈ 520 sq ftSold₹4,450,000
A-304BUILDING A348.28 sq m≈ 520 sq ftSold₹4,999,000

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹104,282,000 of an estimated ₹190,435,000 was reported as incurred (54.8%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 19 July 2026 · registration P52100047092

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
BUILDING AExcavation100.0%
BUILDING ABasement (if any)70.0%
BUILDING APodiums (if any) 0.0%
BUILDING APlinth80.0%
BUILDING AStilt Floor 60.0%
BUILDING ASlabs of Super Structure100.0%
BUILDING AInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85.0%
BUILDING ASanitary Fittings within the flats / premises85.0%
BUILDING AStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUILDING AExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85.0%
BUILDING AInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10.0%
BUILDING BExcavation100.0%
BUILDING BBasement (if any)60.0%
BUILDING BPodiums (if any) 0.0%
BUILDING BPlinth60.0%
BUILDING BStilt Floor 30.0%
BUILDING BSlabs of Super Structure70.0%
BUILDING BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20.0%
BUILDING BSanitary Fittings within the flats / premises0.0%
BUILDING BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50.0%
BUILDING BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUILDING BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUILDING CExcavation0.0%
BUILDING CPlinth0.0%
BUILDING CStilt Floor 0.0%
BUILDING CSlabs of Super Structure0.0%
BUILDING CInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUILDING CSanitary Fittings within the flats / premises0.0%
BUILDING CStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUILDING CExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUILDING CInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUILDING DExcavation0.0%
BUILDING DPlinth0.0%
BUILDING DStilt Floor 0.0%
BUILDING DSlabs of Super Structure0.0%
BUILDING DInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUILDING DSanitary Fittings within the flats / premises0.0%
BUILDING DStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUILDING DExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUILDING DInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 19 July 2026 · registration P52100047092

Reported deadline extensions

Revised targetReason given by the builder
31 December 2027The construction of A wign is completed and B Wings is approximately 95% complete, whereas the construction of C and D Wings start in Jan 2026. The earlier project completion date was declared considering only two wings (A & B). Subsequently, the project scope has been expanded to include four wings (A, B, C, and D). In view of the revised project configuration and the additional construction involved, it has become necessary to apply for an extension of the project completion timeline. As per applicable regulations, the extension application shall be supported by the consent of more than 51% of the allottees.

MahaRERA project filing · read 19 July 2026 · registration P52100047092

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹79,642,158₹0₹192,858,211₹272,500,369
Actual raised₹72,002,013₹4,084,595₹81,469,802₹160,559,130

MahaRERA project filing · read 19 July 2026 · registration P52100047092

Quarterly filing record

18 elapsed quarterly periods in the captured compliance schedule. Active default was recorded for FY 2025-2026.

MahaRERA project filing · read 19 July 2026 · registration P52100047092

Documents named in the filing

  • Commencement certificate · 11 listed
  • Promoter PAN · 1 listed
  • Form 1 — Architect's certificate · 9 listed
  • Form 3 — CA certificate · 9 listed
  • Form 2 — Engineer's certificate · 10 listed
  • Title / search report · 4 listed
  • Form B — Promoter declaration · 1 listed
  • Sanctioned layout plan · 3 listed
  • Sanctioned building plan · 16 listed
  • Occupancy / completion certificate · 11 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100047092

Builder and past records

What else does the record show?

Projects registered under this company

SHREE GURUDATTA DEVELOPERS

2Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

Past records of sales and unsold homes

  1. 27 September 2026

    80 marked unsold · 27 sold · 0 booked.

    Saved MahaRERA home list

  2. 18 September 2026

    80 marked unsold · 27 sold · 0 booked.

    Saved MahaRERA home list

  3. 10 September 2026

    80 marked unsold · 27 sold · 0 booked.

    Saved MahaRERA home list

  4. 19 July 2026

    80 marked unsold · 27 sold · 0 booked.

    Saved MahaRERA home list

These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

More projects to explore

Other projects in this locality.

These projects list the same locality. They may differ in exact location, home type and price.

Project Comparison Report

Which project should you buy in?
And which home?

Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

Create my Comparison Report →

2 projects · ₹7,999
3 projects · ₹9,999

Within 1 working day

Didn’t help you decide? Full refund — no questions asked.

Compare project details for free →

Sources and dates.

MahaRERA · registration record · read 12 July 2026

MahaRERA · per-home inventory · saved-file date 18 July 2026

This is a past RERA home list, not current availability. It does not give the date each home was sold.

The home-list date is based on the saved file’s details.

Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

Open MahaRERA · search P52100047092 ↗
homeonpaper