homeonpaper.

Builder’s RERA records,
explained for buyers.

The builder’s RERA record, explained

L Axis Phase III Cluster A

Pharande Promoters and Builders · P52100047349

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For L Axis Phase III Cluster A (P52100047349), 0 of 96 entries were marked unsold in the MahaRERA unit list dated 18 July 2026 (saved-file date).

MahaRERA · per-unit inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find units to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular unit

See its advantages, drawbacks and how it compares with other units in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended units in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Inside this registered phase

How do the buildings compare in the record?

96 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-unit inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and filed areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded filed-area range
P4848000711.00–917.00 sq m≈ 7,653–9,871 sq ft
Q4848000711.00–917.00 sq m≈ 7,653–9,871 sq ft

Area means carpet area for building units and plot area for plots. Size alone does not establish use or layout. How we read and summarise the filing →

Unit Report

Is this the right
unit for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar units and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your unit in the RERA list.

The same unit number may appear in more than one building. Check both before choosing.

96 listed entries

MahaRERA · per-unit inventory · saved-file date 18 July 2026

RERA unit list, not current availability
Unit / buildingFloor in the recordFiled areaReported statusAgreement valueAssess
1001P / Wing NA10917.0 sq m≈ 9,871 sq ft · RERA carpet areaSold₹9,164,583
1002P / Wing NA10711.0 sq m≈ 7,653 sq ft · RERA carpet areaSold₹7,526,400
1003P / Wing NA10711.0 sq m≈ 7,653 sq ft · RERA carpet areaSold₹7,428,000
1004P / Wing NA10886.0 sq m≈ 9,537 sq ft · RERA carpet areaSold₹8,548,500
101P / Wing NA1917.0 sq m≈ 9,871 sq ft · RERA carpet areaSold₹9,714,168
102P / Wing NA1711.0 sq m≈ 7,653 sq ft · RERA carpet areaSold₹6,838,100
103P / Wing NA1711.0 sq m≈ 7,653 sq ft · RERA carpet areaSold₹6,820,800
104P / Wing NA1886.0 sq m≈ 9,537 sq ft · RERA carpet areaSold₹9,058,140
1101P / Wing NA11917.0 sq m≈ 9,871 sq ft · RERA carpet areaSold₹9,847,618
1102P / Wing NA11711.0 sq m≈ 7,653 sq ft · RERA carpet areaSold₹6,670,000
1103P / Wing NA11711.0 sq m≈ 7,653 sq ft · RERA carpet areaSold₹7,380,952
1104P / Wing NA11737.0 sq m≈ 7,933 sq ft · RERA carpet areaSold₹7,743,960

Read every entry in one table: Read the complete saved unit list.

Choose the unit you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
PExcavation100.0%
PBasement (if any)100.0%
PPodiums (if any) 100.0%
PPlinth100.0%
PStilt Floor 50.0%
PSlabs of Super Structure67.0%
PInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises2.0%
PSanitary Fittings within the flats / premises0.0%
PStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40.0%
PExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
PInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
QExcavation100.0%
QBasement (if any)100.0%
QPodiums (if any) 100.0%
QPlinth100.0%
QStilt Floor 50.0%
QSlabs of Super Structure67.0%
QInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises2.0%
QSanitary Fittings within the flats / premises0.0%
QStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40.0%
QExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
QInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 19 July 2026 · registration P52100047349

Quarterly filing record

18 elapsed quarterly periods in the captured compliance schedule. Active default was recorded for FY 2025-2026.

MahaRERA project filing · read 19 July 2026 · registration P52100047349

Documents named in the filing

  • Promoter PAN · 1 listed
  • Form 1 — Architect's certificate · 3 listed
  • Form 3 — CA certificate · 1 listed
  • Form 2 — Engineer's certificate · 1 listed
  • Form B — Promoter declaration · 1 listed
  • Title / search report · 1 listed
  • Sanctioned layout plan · 1 listed
  • Sanctioned building plan · 2 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100047349

Builder and past records

What else does the record show?

Projects registered under this company

Pharande Promoters and Builders

19Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026 – 10 September 2026

Explore other registrations

Past records of sales and unsold units

  1. 27 September 2026

    0 marked unsold · 96 sold · 0 booked.

    Saved MahaRERA unit list

  2. 18 September 2026

    0 marked unsold · 96 sold · 0 booked.

    Saved MahaRERA unit list

  3. 10 September 2026

    0 marked unsold · 96 sold · 0 booked.

    Saved MahaRERA unit list

  4. 19 July 2026

    0 marked unsold · 96 sold · 0 booked.

    Saved MahaRERA unit list

These dates show when the records were saved, not when units were sold. Sales may have changed since then, even if the saved counts are the same.

More projects to explore

Other projects in this locality.

These projects list the same locality. They may differ in exact location, property type and price.

Project Comparison Report

Which project should you buy in?
And which unit?

Compare up to three projects. We read their plans and RERA documents, recommend units in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

Create my Comparison Report →

2 projects · ₹7,999
3 projects · ₹9,999

Within 1 working day

Didn’t help you decide? Full refund — no questions asked.

Compare project details for free →

Sources and dates.

MahaRERA · registration record · read 12 July 2026

MahaRERA · per-unit inventory · saved-file date 18 July 2026

This is a past RERA unit list, not current availability. It does not give the date each unit was sold.

The unit-list date is based on the saved file’s details.

Filed area means carpet area for building units and plot area for plots. Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

Open MahaRERA · search P52100047349 ↗
homeonpaper