The builder’s RERA record, explained

INFINITY AVANA

TULIP INFRA · P52100047662

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For INFINITY AVANA (P52100047662), 115 of 559 entries were marked unsold in the MahaRERA unit list read 10 September 2026.

MahaRERA · per-unit inventory · read 10 September 2026

For INFINITY AVANA, ₹10,484 per sq ft of filed area is the median rate across 383 sold or booked entries with prices in the MahaRERA unit list read 10 September 2026. These are historical agreement values, not current asking prices.

MahaRERA · per-unit inventory · read 10 September 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find units to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular unit

See its advantages, drawbacks and how it compares with other units in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended units in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹10,484/ sq ft filed area

Across 383 sold or booked entries with reported prices. The middle 80% of rates fall between ₹9,231 and ₹12,508.

MahaRERA · per-unit inventory · read 10 September 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its filed area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold units and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar units sell for?

Compare filed values by building, unit-number pattern and area. See which units were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

559 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-unit inventory · read 10 September 2026

Scroll sideways to see all columns.

Building names, sale status and filed areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded filed-area range
A WING142850421522.34–538.43 sq m≈ 240–5,796 sq ft
B WING12011307093.68–125.40 sq m≈ 1,008–1,350 sq ft
C WING129630254134.71–91.87 sq m≈ 374–989 sq ft
D WING128104019534.73–91.87 sq m≈ 374–989 sq ft
MHADA WING4018022037.98–38.36 sq m≈ 409–413 sq ft

Area means carpet area for building units and plot area for plots. Size alone does not establish use or layout. How we read and summarise the filing →

Unit Report

Is this the right
unit for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar units and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your unit in the RERA list.

The same unit number may appear in more than one building. Check both before choosing.

559 listed entries

MahaRERA · per-unit inventory · read 10 September 2026

RERA unit list, not current availability
Unit / buildingFloor in the recordFiled areaReported statusAgreement valueAssess
A 1001A WING / Wing NA10125.4 sq m≈ 1,350 sq ft · RERA carpet areaSold₹17,294,600
A 1002A WING / Wing NA1093.68 sq m≈ 1,008 sq ft · RERA carpet areaSold₹10,250,000
A 1003A WING / Wing NA1099.41 sq m≈ 1,070 sq ft · RERA carpet areaSold₹13,324,806
A 1004A WING / Wing NA10105.11 sq m≈ 1,131 sq ft · RERA carpet areaSold₹11,312,532
A 1101A WING / Wing NA11125.4 sq m≈ 1,350 sq ft · RERA carpet areaNot for saleNot stated
A 1102A WING / Wing NA1193.68 sq m≈ 1,008 sq ft · RERA carpet areaSold₹10,959,056
A 1103A WING / Wing NA1199.41 sq m≈ 1,070 sq ft · RERA carpet areaSold₹12,696,400
A 1104A WING / Wing NA11105.11 sq m≈ 1,131 sq ft · RERA carpet areaSold₹13,594,974
A 1201A WING / Wing NA12105.51 sq m≈ 1,136 sq ft · RERA carpet areaSold₹14,795,039
A 1202A WING / Wing NA1293.68 sq m≈ 1,008 sq ft · RERA carpet areaSold₹10,634,700
A 1203A WING / Wing NA1299.41 sq m≈ 1,070 sq ft · RERA carpet areaSold₹12,563,421
A 1204A WING / Wing NA12105.11 sq m≈ 1,131 sq ft · RERA carpet areaSold₹10,800,000

Read every entry in one table: Read the complete saved unit list.

Choose the unit you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹1,997,786,011 of an estimated ₹2,880,000,000 was reported as incurred (69.4%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 19 July 2026 · registration P52100047662

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
A WINGExcavation100.0%
A WINGBasement (if any)100.0%
A WINGPodiums (if any) 70.0%
A WINGPlinth100.0%
A WINGStilt Floor 70.0%
A WINGSlabs of Super Structure98.0%
A WINGInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60.0%
A WINGSanitary Fittings within the flats / premises0.0%
A WINGStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50.0%
A WINGExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25.0%
A WINGInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
B WINGExcavation100.0%
B WINGBasement (if any)100.0%
B WINGPodiums (if any) 100.0%
B WINGPlinth100.0%
B WINGStilt Floor 100.0%
B WINGSlabs of Super Structure100.0%
B WINGInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90.0%
B WINGSanitary Fittings within the flats / premises0.0%
B WINGStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90.0%
B WINGExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60.0%
B WINGInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
C WINGExcavation100.0%
C WINGBasement (if any)100.0%
C WINGPodiums (if any) 100.0%
C WINGPlinth100.0%
C WINGStilt Floor 100.0%
C WINGSlabs of Super Structure98.0%
C WINGInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60.0%
C WINGSanitary Fittings within the flats / premises0.0%
C WINGStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50.0%
C WINGExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25.0%
C WINGInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
D WINGExcavation100.0%
D WINGBasement (if any)100.0%
D WINGPodiums (if any) 100.0%
D WINGPlinth100.0%
D WINGStilt Floor 100.0%
D WINGSlabs of Super Structure100.0%
D WINGInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95.0%
D WINGSanitary Fittings within the flats / premises0.0%
D WINGStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90.0%
D WINGExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60.0%
D WINGInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
MHADA WINGExcavation100.0%
MHADA WINGBasement (if any)100.0%
MHADA WINGPodiums (if any) 100.0%
MHADA WINGPlinth100.0%
MHADA WINGStilt Floor 100.0%
MHADA WINGSlabs of Super Structure100.0%
MHADA WINGInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95.0%
MHADA WINGSanitary Fittings within the flats / premises0.0%
MHADA WINGStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75.0%
MHADA WINGExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90.0%
MHADA WINGInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
COMMERCIALExcavation0.0%
COMMERCIALBasement (if any)0.0%
COMMERCIALPodiums (if any) 0.0%
COMMERCIALPlinth0.0%
COMMERCIALStilt Floor 0.0%
COMMERCIALSlabs of Super Structure0.0%
COMMERCIALInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
COMMERCIALSanitary Fittings within the flats / premises0.0%
COMMERCIALStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
COMMERCIALExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
COMMERCIALInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 19 July 2026 · registration P52100047662

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹557,718,523₹0₹3,110,531,477₹3,678,250,000
Actual raised₹261,267,963₹0₹2,396,216,117₹2,661,143,280

MahaRERA project filing · read 19 July 2026 · registration P52100047662

Quarterly filing record

14 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 19 July 2026 · registration P52100047662

Documents named in the filing

  • Promoter PAN · 2 listed
  • Form 1 — Architect's certificate · 4 listed
  • Form 3 — CA certificate · 4 listed
  • Form 2 — Engineer's certificate · 4 listed
  • Form B — Promoter declaration · 1 listed
  • Title / search report · 2 listed
  • Sanctioned layout plan · 1 listed
  • Sanctioned building plan · 96 listed
  • Occupancy / completion certificate · 1 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100047662

Builder and past records

What else does the record show?

Projects registered under this company

TULIP INFRA

2Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

Past records of sales and unsold units

  1. 27 September 2026

    115 marked unsold · 383 sold · 0 booked.

    Saved MahaRERA unit list

  2. 18 September 2026

    115 marked unsold · 383 sold · 0 booked.

    Saved MahaRERA unit list

  3. 10 September 2026

    115 marked unsold · 383 sold · 0 booked.

    Saved MahaRERA unit list

  4. 19 July 2026

    112 marked unsold · 373 sold · 0 booked.

    Saved MahaRERA unit list

These dates show when the records were saved, not when units were sold. Sales may have changed since then, even if the saved counts are the same.

More projects to explore

Other projects in this locality.

These projects list the same locality. They may differ in exact location, property type and price.

Project Comparison Report

Which project should you buy in?
And which unit?

Compare up to three projects. We read their plans and RERA documents, recommend units in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

Create my Comparison Report →

2 projects · ₹7,999
3 projects · ₹9,999

Within 1 working day

Didn’t help you decide? Full refund — no questions asked.

Compare project details for free →

Sources and dates.

MahaRERA · registration record · read 12 July 2026

MahaRERA · per-unit inventory · read 10 September 2026

This is a past RERA unit list, not current availability. It does not give the date each unit was sold.

Filed area means carpet area for building units and plot area for plots. Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

Open MahaRERA · search P52100047662 ↗