homeonpaper.

Builder’s RERA records,
explained for buyers.

The builder’s RERA record, explained

Ashtavinayak City Phase - 4

Ashtavinayak Reality · P52100048830

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For Ashtavinayak City Phase - 4 (P52100048830), 42 of 299 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).

MahaRERA · per-home inventory · saved-file date 18 July 2026

For Ashtavinayak City Phase - 4, ₹7,180 per sq ft of carpet area is the median rate across 257 sold or booked entries with prices in the MahaRERA home list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.

MahaRERA · per-home inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹7,180/ sq ft carpet area

Across 257 sold or booked entries with reported prices. The middle 80% of rates fall between ₹6,945 and ₹8,037.

MahaRERA · per-home inventory · saved-file date 18 July 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar homes sell for?

Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

299 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
Building Number 1200020059.58–59.71 sq m≈ 641–643 sq ft
Building Number 2 A and B Wing565204059.58–59.94 sq m≈ 641–645 sq ft
Building Number 3 C and D Wing565006059.58–59.94 sq m≈ 641–645 sq ft
Building Number 4 E and F Wing565105029.38 sq m≈ 316 sq ft
Building Number 5 C and D Wing565600029.38 sq m≈ 316 sq ft
Building Number 6 A and B Wing484800029.38 sq m≈ 316 sq ft
Convenience Shopping Centre7007014.80–33.88 sq m≈ 159–365 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

299 listed entries

MahaRERA · per-home inventory · saved-file date 18 July 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
101Building Number 1159.58 sq m≈ 641 sq ftMarked unsoldNot stated
102Building Number 1159.58 sq m≈ 641 sq ftMarked unsoldNot stated
103Building Number 1159.58 sq m≈ 641 sq ftMarked unsoldNot stated
104Building Number 1159.58 sq m≈ 641 sq ftMarked unsoldNot stated
201Building Number 1259.71 sq m≈ 643 sq ftMarked unsoldNot stated
202Building Number 1259.71 sq m≈ 643 sq ftMarked unsoldNot stated
203Building Number 1259.71 sq m≈ 643 sq ftMarked unsoldNot stated
204Building Number 1259.71 sq m≈ 643 sq ftMarked unsoldNot stated
301Building Number 1359.58 sq m≈ 641 sq ftMarked unsoldNot stated
302Building Number 1359.58 sq m≈ 641 sq ftMarked unsoldNot stated
303Building Number 1359.58 sq m≈ 641 sq ftMarked unsoldNot stated
304Building Number 1359.58 sq m≈ 641 sq ftMarked unsoldNot stated

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹504,453,643 of an estimated ₹535,495,438 was reported as incurred (94.2%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 19 July 2026 · registration P52100048830

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
Building Number 1Excavation100.0%
Building Number 1Basement (if any)0.0%
Building Number 1Podiums (if any) 0.0%
Building Number 1Plinth100.0%
Building Number 1Stilt Floor 0.0%
Building Number 1Slabs of Super Structure100.0%
Building Number 1Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
Building Number 1Sanitary Fittings within the flats / premises0.0%
Building Number 1Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Building Number 1External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
Building Number 1Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
Building Number 2 A and B WingExcavation100.0%
Building Number 2 A and B WingBasement (if any)0.0%
Building Number 2 A and B WingPodiums (if any) 0.0%
Building Number 2 A and B WingPlinth100.0%
Building Number 2 A and B WingStilt Floor 0.0%
Building Number 2 A and B WingSlabs of Super Structure100.0%
Building Number 2 A and B WingInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
Building Number 2 A and B WingSanitary Fittings within the flats / premises100.0%
Building Number 2 A and B WingStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Building Number 2 A and B WingExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
Building Number 2 A and B WingInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
Building Number 3 C and D WingExcavation100.0%
Building Number 3 C and D WingBasement (if any)0.0%
Building Number 3 C and D WingPodiums (if any) 0.0%
Building Number 3 C and D WingPlinth100.0%
Building Number 3 C and D WingStilt Floor 0.0%
Building Number 3 C and D WingSlabs of Super Structure100.0%
Building Number 3 C and D WingInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
Building Number 3 C and D WingSanitary Fittings within the flats / premises100.0%
Building Number 3 C and D WingStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Building Number 3 C and D WingExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
Building Number 3 C and D WingInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
Building Number 4 E and F WingExcavation100.0%
Building Number 4 E and F WingBasement (if any)0.0%
Building Number 4 E and F WingPodiums (if any) 0.0%
Building Number 4 E and F WingPlinth100.0%
Building Number 4 E and F WingStilt Floor 0.0%
Building Number 4 E and F WingSlabs of Super Structure100.0%
Building Number 4 E and F WingInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
Building Number 4 E and F WingSanitary Fittings within the flats / premises100.0%
Building Number 4 E and F WingStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Building Number 4 E and F WingExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
Building Number 4 E and F WingInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
Building Number 5 C and D WingExcavation100.0%
Building Number 5 C and D WingBasement (if any)0.0%
Building Number 5 C and D WingPodiums (if any) 0.0%
Building Number 5 C and D WingPlinth100.0%
Building Number 5 C and D WingStilt Floor 0.0%
Building Number 5 C and D WingSlabs of Super Structure100.0%
Building Number 5 C and D WingInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
Building Number 5 C and D WingSanitary Fittings within the flats / premises100.0%
Building Number 5 C and D WingStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Building Number 5 C and D WingExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
Building Number 5 C and D WingInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
Building Number 6 A and B WingExcavation100.0%
Building Number 6 A and B WingBasement (if any)0.0%
Building Number 6 A and B WingPodiums (if any) 0.0%
Building Number 6 A and B WingPlinth100.0%
Building Number 6 A and B WingStilt Floor 0.0%
Building Number 6 A and B WingSlabs of Super Structure100.0%
Building Number 6 A and B WingInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
Building Number 6 A and B WingSanitary Fittings within the flats / premises100.0%
Building Number 6 A and B WingStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Building Number 6 A and B WingExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
Building Number 6 A and B WingInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
Convenience Shopping CentreExcavation100.0%
Convenience Shopping CentreBasement (if any)0.0%
Convenience Shopping CentrePodiums (if any) 0.0%
Convenience Shopping CentrePlinth100.0%
Convenience Shopping CentreStilt Floor 0.0%
Convenience Shopping CentreSlabs of Super Structure100.0%
Convenience Shopping CentreInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
Convenience Shopping CentreSanitary Fittings within the flats / premises100.0%
Convenience Shopping CentreStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Convenience Shopping CentreExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
Convenience Shopping CentreInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%

MahaRERA project filing · read 19 July 2026 · registration P52100048830

Reported deadline extensions

Revised targetReason given by the builder
30 June 2025Reason 1 For Extension: - Project is under Pradhan Mantri Awas Yojana of Government of India Ministry of Housing Department & Project completion date of said Housing Scheme is extended up to 31 Dec 2025. Our project is under PMAY (Pradhan Mantri Awas Yojana) and earlier last date of completion of PMAY project was 31st Dec 2024 which was extended by Ministry of Housing & Urban Affairs of Government of India through their order no N-11011/37/2021-HFA-UD(FTS-9111947) till 31st Dec 2025, We while registering our project in RERA we mentioned 31st Dec 2024 as date of completion of the project was mandatory by PMAY to complete the project by 31st Dec 2024 but said date is now extended till 31st Dec 2025 through above mentioned notification. We will also like to inform you even through Central Government extended PMAY up to 31st Dec 2025, our extension application is only for Six months i.e. 30 June 2025. Reason 2 For Extension: - Delay in NOCs which required for completion of project from local body due to State Government Notification
31 December 20251. Completion Status: All buildings within the said project have been completed in every respect on site. This fact stands duly certified by our Registered Architect, Ar. Shreyash Suniel Rukari, vide Form 1 dated 17/07/2025, a copy of which has been enclosed with our extension application. 2. Occupancy Certificates for Sold Units: All sold units in the project were completed within the stipulated time frame. Occupancy Certificates for these units have been duly issued by the competent authority, and possession has been handed over to the respective allottees. 3. Litigation Status: There are no pending litigations, disputes, or complaints in respect of the said project, sold units, or their allottees before any court of law or statutory authority. 4. Request for Extension: The Full Occupancy Certificate from MHADA can only be obtained upon submission of a MahaRERA registration certificate valid until the date of application for the said Occupancy Certificate. In view of this requirement, we humbly request your good office to grant an extension of our MahaRERA project registration at the earliest, so as to enable us to complete all formalities and secure the Full Occupancy Certificate without delay. We hereby solemnly affirm that the information set forth herein is true and correct to the best of our knowledge, belief, and understanding. We shall remain obliged for your prompt and favorable consideration of our request. Thanking You Ashtavinayak Reality

MahaRERA project filing · read 19 July 2026 · registration P52100048830

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹299,978,839₹0₹345,667,918₹645,646,757
Actual raised₹25,391,386₹0₹617,511,827₹642,903,213

MahaRERA project filing · read 19 July 2026 · registration P52100048830

Quarterly filing record

12 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 19 July 2026 · registration P52100048830

Documents named in the filing

  • Promoter PAN · 1 listed
  • Occupancy / completion certificate · 1 listed
  • Form 1 — Architect's certificate · 6 listed
  • Form 3 — CA certificate · 4 listed
  • Form 2 — Engineer's certificate · 6 listed
  • Title / search report · 1 listed
  • Form B — Promoter declaration · 3 listed
  • Sanctioned building plan · 11 listed
  • Sanctioned layout plan · 1 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100048830

Builder and past records

What else does the record show?

Projects registered under this company

Ashtavinayak Reality

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

    Past records of sales and unsold homes

    1. 27 September 2026

      42 marked unsold · 257 sold · 0 booked.

      Saved MahaRERA home list

    2. 18 September 2026

      42 marked unsold · 257 sold · 0 booked.

      Saved MahaRERA home list

    3. 10 September 2026

      42 marked unsold · 257 sold · 0 booked.

      Saved MahaRERA home list

    4. 19 July 2026

      42 marked unsold · 257 sold · 0 booked.

      Saved MahaRERA home list

    These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

    More projects to explore

    Other projects in this locality.

    These projects list the same locality. They may differ in exact location, home type and price.

    Project Comparison Report

    Which project should you buy in?
    And which home?

    Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 12 July 2026

    MahaRERA · per-home inventory · saved-file date 18 July 2026

    This is a past RERA home list, not current availability. It does not give the date each home was sold.

    The home-list date is based on the saved file’s details.

    Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

    Open MahaRERA · search P52100048830 ↗