The builder’s RERA record, explained
Ashtavinayak Reality · P52100048830
For Ashtavinayak City Phase - 4 (P52100048830), 42 of 299 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).
MahaRERA · per-home inventory · saved-file date 18 July 2026
For Ashtavinayak City Phase - 4, ₹7,180 per sq ft of carpet area is the median rate across 257 sold or booked entries with prices in the MahaRERA home list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.
MahaRERA · per-home inventory · saved-file date 18 July 2026
These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.
Builder’s completion target
This target date has passed. The record shown here does not confirm whether the project is complete or has received more time.
Status shown on RERA
This is the status shown on RERA. It does not confirm an occupancy certificate or today’s construction progress.
Prices reported to RERA
₹7,180/ sq ft carpet area
Across 257 sold or booked entries with reported prices. The middle 80% of rates fall between ₹6,945 and ₹8,037.
MahaRERA · per-home inventory · saved-file date 18 July 2026
For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.
Sales Report
Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.
Inside this registered phase
299 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.
MahaRERA · per-home inventory · saved-file date 18 July 2026
Scroll sideways to see all columns.
| Filed building | Entries | Sold | Booked | Marked unsold | Other / unstated status | Recorded carpet-area range |
|---|---|---|---|---|---|---|
| Building Number 1 | 20 | 0 | 0 | 20 | 0 | 59.58–59.71 sq m≈ 641–643 sq ft |
| Building Number 2 A and B Wing | 56 | 52 | 0 | 4 | 0 | 59.58–59.94 sq m≈ 641–645 sq ft |
| Building Number 3 C and D Wing | 56 | 50 | 0 | 6 | 0 | 59.58–59.94 sq m≈ 641–645 sq ft |
| Building Number 4 E and F Wing | 56 | 51 | 0 | 5 | 0 | 29.38 sq m≈ 316 sq ft |
| Building Number 5 C and D Wing | 56 | 56 | 0 | 0 | 0 | 29.38 sq m≈ 316 sq ft |
| Building Number 6 A and B Wing | 48 | 48 | 0 | 0 | 0 | 29.38 sq m≈ 316 sq ft |
| Convenience Shopping Centre | 7 | 0 | 0 | 7 | 0 | 14.80–33.88 sq m≈ 159–365 sq ft |
Different sizes are not necessarily different bedroom types. How we read and summarise the filing →
Unit Report
Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.
Didn’t help you decide? Full refund — no questions asked.
The same home number may appear in more than one building. Check both before choosing.
MahaRERA · per-home inventory · saved-file date 18 July 2026
| Home / building | Floor in the record | Carpet area | Reported status | Agreement value | Assess |
|---|---|---|---|---|---|
| 101Building Number 1 | 1 | 59.58 sq m≈ 641 sq ft | Marked unsold | Not stated | |
| 102Building Number 1 | 1 | 59.58 sq m≈ 641 sq ft | Marked unsold | Not stated | |
| 103Building Number 1 | 1 | 59.58 sq m≈ 641 sq ft | Marked unsold | Not stated | |
| 104Building Number 1 | 1 | 59.58 sq m≈ 641 sq ft | Marked unsold | Not stated | |
| 201Building Number 1 | 2 | 59.71 sq m≈ 643 sq ft | Marked unsold | Not stated | |
| 202Building Number 1 | 2 | 59.71 sq m≈ 643 sq ft | Marked unsold | Not stated | |
| 203Building Number 1 | 2 | 59.71 sq m≈ 643 sq ft | Marked unsold | Not stated | |
| 204Building Number 1 | 2 | 59.71 sq m≈ 643 sq ft | Marked unsold | Not stated | |
| 301Building Number 1 | 3 | 59.58 sq m≈ 641 sq ft | Marked unsold | Not stated | |
| 302Building Number 1 | 3 | 59.58 sq m≈ 641 sq ft | Marked unsold | Not stated | |
| 303Building Number 1 | 3 | 59.58 sq m≈ 641 sq ft | Marked unsold | Not stated | |
| 304Building Number 1 | 3 | 59.58 sq m≈ 641 sq ft | Marked unsold | Not stated |
Read every entry in one table: Read the complete saved home list.
Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.
More from the RERA documents
₹504,453,643 of an estimated ₹535,495,438 was reported as incurred (94.2%). This percentage is about costs. It does not show how much construction is complete.
MahaRERA project filing · read 19 July 2026 · registration P52100048830
Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.
| Building | Activity | Reported |
|---|---|---|
| Building Number 1 | Excavation | 100.0% |
| Building Number 1 | Basement (if any) | 0.0% |
| Building Number 1 | Podiums (if any) | 0.0% |
| Building Number 1 | Plinth | 100.0% |
| Building Number 1 | Stilt Floor | 0.0% |
| Building Number 1 | Slabs of Super Structure | 100.0% |
| Building Number 1 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| Building Number 1 | Sanitary Fittings within the flats / premises | 0.0% |
| Building Number 1 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| Building Number 1 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| Building Number 1 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| Building Number 2 A and B Wing | Excavation | 100.0% |
| Building Number 2 A and B Wing | Basement (if any) | 0.0% |
| Building Number 2 A and B Wing | Podiums (if any) | 0.0% |
| Building Number 2 A and B Wing | Plinth | 100.0% |
| Building Number 2 A and B Wing | Stilt Floor | 0.0% |
| Building Number 2 A and B Wing | Slabs of Super Structure | 100.0% |
| Building Number 2 A and B Wing | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| Building Number 2 A and B Wing | Sanitary Fittings within the flats / premises | 100.0% |
| Building Number 2 A and B Wing | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| Building Number 2 A and B Wing | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| Building Number 2 A and B Wing | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| Building Number 3 C and D Wing | Excavation | 100.0% |
| Building Number 3 C and D Wing | Basement (if any) | 0.0% |
| Building Number 3 C and D Wing | Podiums (if any) | 0.0% |
| Building Number 3 C and D Wing | Plinth | 100.0% |
| Building Number 3 C and D Wing | Stilt Floor | 0.0% |
| Building Number 3 C and D Wing | Slabs of Super Structure | 100.0% |
| Building Number 3 C and D Wing | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| Building Number 3 C and D Wing | Sanitary Fittings within the flats / premises | 100.0% |
| Building Number 3 C and D Wing | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| Building Number 3 C and D Wing | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| Building Number 3 C and D Wing | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| Building Number 4 E and F Wing | Excavation | 100.0% |
| Building Number 4 E and F Wing | Basement (if any) | 0.0% |
| Building Number 4 E and F Wing | Podiums (if any) | 0.0% |
| Building Number 4 E and F Wing | Plinth | 100.0% |
| Building Number 4 E and F Wing | Stilt Floor | 0.0% |
| Building Number 4 E and F Wing | Slabs of Super Structure | 100.0% |
| Building Number 4 E and F Wing | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| Building Number 4 E and F Wing | Sanitary Fittings within the flats / premises | 100.0% |
| Building Number 4 E and F Wing | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| Building Number 4 E and F Wing | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| Building Number 4 E and F Wing | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| Building Number 5 C and D Wing | Excavation | 100.0% |
| Building Number 5 C and D Wing | Basement (if any) | 0.0% |
| Building Number 5 C and D Wing | Podiums (if any) | 0.0% |
| Building Number 5 C and D Wing | Plinth | 100.0% |
| Building Number 5 C and D Wing | Stilt Floor | 0.0% |
| Building Number 5 C and D Wing | Slabs of Super Structure | 100.0% |
| Building Number 5 C and D Wing | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| Building Number 5 C and D Wing | Sanitary Fittings within the flats / premises | 100.0% |
| Building Number 5 C and D Wing | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| Building Number 5 C and D Wing | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| Building Number 5 C and D Wing | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| Building Number 6 A and B Wing | Excavation | 100.0% |
| Building Number 6 A and B Wing | Basement (if any) | 0.0% |
| Building Number 6 A and B Wing | Podiums (if any) | 0.0% |
| Building Number 6 A and B Wing | Plinth | 100.0% |
| Building Number 6 A and B Wing | Stilt Floor | 0.0% |
| Building Number 6 A and B Wing | Slabs of Super Structure | 100.0% |
| Building Number 6 A and B Wing | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| Building Number 6 A and B Wing | Sanitary Fittings within the flats / premises | 100.0% |
| Building Number 6 A and B Wing | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| Building Number 6 A and B Wing | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| Building Number 6 A and B Wing | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| Convenience Shopping Centre | Excavation | 100.0% |
| Convenience Shopping Centre | Basement (if any) | 0.0% |
| Convenience Shopping Centre | Podiums (if any) | 0.0% |
| Convenience Shopping Centre | Plinth | 100.0% |
| Convenience Shopping Centre | Stilt Floor | 0.0% |
| Convenience Shopping Centre | Slabs of Super Structure | 100.0% |
| Convenience Shopping Centre | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| Convenience Shopping Centre | Sanitary Fittings within the flats / premises | 100.0% |
| Convenience Shopping Centre | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| Convenience Shopping Centre | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| Convenience Shopping Centre | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
MahaRERA project filing · read 19 July 2026 · registration P52100048830
| Revised target | Reason given by the builder |
|---|---|
| 30 June 2025 | Reason 1 For Extension: - Project is under Pradhan Mantri Awas Yojana of Government of India Ministry of Housing Department & Project completion date of said Housing Scheme is extended up to 31 Dec 2025. Our project is under PMAY (Pradhan Mantri Awas Yojana) and earlier last date of completion of PMAY project was 31st Dec 2024 which was extended by Ministry of Housing & Urban Affairs of Government of India through their order no N-11011/37/2021-HFA-UD(FTS-9111947) till 31st Dec 2025, We while registering our project in RERA we mentioned 31st Dec 2024 as date of completion of the project was mandatory by PMAY to complete the project by 31st Dec 2024 but said date is now extended till 31st Dec 2025 through above mentioned notification. We will also like to inform you even through Central Government extended PMAY up to 31st Dec 2025, our extension application is only for Six months i.e. 30 June 2025. Reason 2 For Extension: - Delay in NOCs which required for completion of project from local body due to State Government Notification |
| 31 December 2025 | 1. Completion Status: All buildings within the said project have been completed in every respect on site. This fact stands duly certified by our Registered Architect, Ar. Shreyash Suniel Rukari, vide Form 1 dated 17/07/2025, a copy of which has been enclosed with our extension application. 2. Occupancy Certificates for Sold Units: All sold units in the project were completed within the stipulated time frame. Occupancy Certificates for these units have been duly issued by the competent authority, and possession has been handed over to the respective allottees. 3. Litigation Status: There are no pending litigations, disputes, or complaints in respect of the said project, sold units, or their allottees before any court of law or statutory authority. 4. Request for Extension: The Full Occupancy Certificate from MHADA can only be obtained upon submission of a MahaRERA registration certificate valid until the date of application for the said Occupancy Certificate. In view of this requirement, we humbly request your good office to grant an extension of our MahaRERA project registration at the earliest, so as to enable us to complete all formalities and secure the Full Occupancy Certificate without delay. We hereby solemnly affirm that the information set forth herein is true and correct to the best of our knowledge, belief, and understanding. We shall remain obliged for your prompt and favorable consideration of our request. Thanking You Ashtavinayak Reality |
MahaRERA project filing · read 19 July 2026 · registration P52100048830
RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.
| Filing | Own funds | Borrowing | Payments from buyers | Total |
|---|---|---|---|---|
| Estimated plan | ₹299,978,839 | ₹0 | ₹345,667,918 | ₹645,646,757 |
| Actual raised | ₹25,391,386 | ₹0 | ₹617,511,827 | ₹642,903,213 |
MahaRERA project filing · read 19 July 2026 · registration P52100048830
12 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.
MahaRERA project filing · read 19 July 2026 · registration P52100048830
A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.
MahaRERA project filing · read 19 July 2026 · registration P52100048830
Builder and past records
Projects registered under this company
1Pune registrations
These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.
MahaRERA Pune registration records · read 12 July 2026
Past records of sales and unsold homes
27 September 2026
42 marked unsold · 257 sold · 0 booked.
Saved MahaRERA home list
18 September 2026
42 marked unsold · 257 sold · 0 booked.
Saved MahaRERA home list
10 September 2026
42 marked unsold · 257 sold · 0 booked.
Saved MahaRERA home list
19 July 2026
42 marked unsold · 257 sold · 0 booked.
Saved MahaRERA home list
These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.
More projects to explore
These projects list the same locality. They may differ in exact location, home type and price.
Fursungi · Pune
P52100078194
255 of 526 entries marked unsold
MahaRERA · per-home inventory · read 11 September 2026
View project details →Fursungi · Pune
PR1260002503056
283 of 283 entries marked unsold
MahaRERA · per-home inventory · saved-file date 18 July 2026
View project details →Fursungi · Pune
P52100026716
2 of 222 entries marked unsold
MahaRERA · per-home inventory · saved-file date 18 July 2026
View project details →Project Comparison Report
Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.
2 projects · ₹7,999
3 projects · ₹9,999
Within 1 working day
Didn’t help you decide? Full refund — no questions asked.
Compare project details for free →MahaRERA · registration record · read 12 July 2026
MahaRERA · per-home inventory · saved-file date 18 July 2026
This is a past RERA home list, not current availability. It does not give the date each home was sold.
The home-list date is based on the saved file’s details.
Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.