homeonpaper.

Builder’s RERA records,
explained for buyers.

The builder’s RERA record, explained

AP4 Tech Park

Amar Pristine Landmarks LLP · P52100050630

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For AP4 Tech Park (P52100050630), 43 of 104 entries were marked unsold in the MahaRERA unit list read 10 September 2026.

MahaRERA · per-unit inventory · read 10 September 2026

For AP4 Tech Park, ₹11,200 per sq ft of filed area is the median rate across 54 sold or booked entries with prices in the MahaRERA unit list read 10 September 2026. These are historical agreement values, not current asking prices.

MahaRERA · per-unit inventory · read 10 September 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find units to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular unit

See its advantages, drawbacks and how it compares with other units in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended units in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹11,200/ sq ft filed area

Across 54 sold or booked entries with reported prices. The middle 80% of rates fall between ₹9,800 and ₹12,950.

MahaRERA · per-unit inventory · read 10 September 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its filed area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold units and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar units sell for?

Compare filed values by building, unit-number pattern and area. See which units were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

104 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-unit inventory · read 10 September 2026

Scroll sideways to see all columns.

Building names, sale status and filed areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded filed-area range
Wing A42380041,072.28–1,675.27 sq m≈ 11,542–18,032 sq ft
Wing B421602331,410.53–1,675.27 sq m≈ 15,183–18,032 sq ft
Wing C20002001,410.53–1,675.27 sq m≈ 15,183–18,032 sq ft

Area means carpet area for building units and plot area for plots. Size alone does not establish use or layout. How we read and summarise the filing →

Unit Report

Is this the right
unit for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar units and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your unit in the RERA list.

The same unit number may appear in more than one building. Check both before choosing.

104 listed entries

MahaRERA · per-unit inventory · read 10 September 2026

RERA unit list, not current availability
Unit / buildingFloor in the recordFiled areaReported statusAgreement valueAssess
1001Wing A / Wing NA101264.85 sq m≈ 13,615 sq ft · RERA carpet areaSold₹133,427,000
1002Wing A / Wing NA101264.85 sq m≈ 13,615 sq ft · RERA carpet areaSold₹152,488,000
1003Wing A / Wing NA101675.27 sq m≈ 18,032 sq ft · RERA carpet areaSold₹176,713,600
1004Wing A / Wing NA101675.27 sq m≈ 18,032 sq ft · RERA carpet areaNot for saleNot stated
1101Wing A / Wing NA111264.85 sq m≈ 13,615 sq ft · RERA carpet areaSold₹162,000,000
1102Wing A / Wing NA111264.85 sq m≈ 13,615 sq ft · RERA carpet areaSold₹133,427,000
1103Wing A / Wing NA111675.27 sq m≈ 18,032 sq ft · RERA carpet areaSold₹201,960,000
1104Wing A / Wing NA111675.27 sq m≈ 18,032 sq ft · RERA carpet areaNot for saleNot stated
1201Wing A / Wing NA121264.85 sq m≈ 13,615 sq ft · RERA carpet areaSold₹133,427,000
1202Wing A / Wing NA121072.28 sq m≈ 11,542 sq ft · RERA carpet areaSold₹113,112,000
1203Wing A / Wing NA121482.7 sq m≈ 15,960 sq ft · RERA carpet areaSold₹189,924,000
1204Wing A / Wing NA121675.27 sq m≈ 18,032 sq ft · RERA carpet areaSold₹176,720,000

Read every entry in one table: Read the complete saved unit list.

Choose the unit you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹9,079,081,500 of an estimated ₹12,234,500,000 was reported as incurred (74.2%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 19 July 2026 · registration P52100050630

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
Wing AExcavation100.0%
Wing ABasement (if any)100.0%
Wing APodiums (if any) 0.0%
Wing APlinth100.0%
Wing AStilt Floor 100.0%
Wing ASlabs of Super Structure100.0%
Wing AInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
Wing ASanitary Fittings within the flats / premises100.0%
Wing AStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Wing AExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
Wing AInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.99.0%
Wing BExcavation100.0%
Wing BBasement (if any)100.0%
Wing BPodiums (if any) 0.0%
Wing BPlinth100.0%
Wing BStilt Floor 100.0%
Wing BSlabs of Super Structure100.0%
Wing BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
Wing BSanitary Fittings within the flats / premises100.0%
Wing BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Wing BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
Wing BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.99.0%
Wing CExcavation100.0%
Wing CBasement (if any)100.0%
Wing CPodiums (if any) 0.0%
Wing CPlinth100.0%
Wing CStilt Floor 0.0%
Wing CSlabs of Super Structure100.0%
Wing CInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises43.0%
Wing CSanitary Fittings within the flats / premises5.0%
Wing CStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks52.0%
Wing CExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Wing CInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.18.0%
Wing DExcavation100.0%
Wing DBasement (if any)100.0%
Wing DPodiums (if any) 0.0%
Wing DPlinth100.0%
Wing DStilt Floor 0.0%
Wing DSlabs of Super Structure20.0%
Wing DInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Wing DSanitary Fittings within the flats / premises0.0%
Wing DStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25.0%
Wing DExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Wing DInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.8.0%

MahaRERA project filing · read 19 July 2026 · registration P52100050630

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹2,180,727,000₹0₹19,461,402,866₹21,642,129,866
Actual raised₹2,478,582,000₹3,119,095,697₹5,755,756,567₹11,353,434,264

MahaRERA project filing · read 19 July 2026 · registration P52100050630

Quarterly filing record

12 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 19 July 2026 · registration P52100050630

Documents named in the filing

  • Occupancy / completion certificate · 1 listed
  • Promoter PAN · 1 listed
  • Form 1 — Architect's certificate · 5 listed
  • Form 3 — CA certificate · 4 listed
  • Form 2 — Engineer's certificate · 5 listed
  • Form B — Promoter declaration · 1 listed
  • Title / search report · 2 listed
  • Sanctioned layout plan · 1 listed
  • Sanctioned building plan · 21 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100050630

Builder and past records

What else does the record show?

Projects registered under this company

Amar Pristine Landmarks LLP

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

    Past records of sales and unsold units

    1. 27 September 2026

      43 marked unsold · 54 sold · 0 booked.

      Saved MahaRERA unit list

    2. 19 September 2026

      43 marked unsold · 54 sold · 0 booked.

      Saved MahaRERA unit list

    3. 10 September 2026

      43 marked unsold · 54 sold · 0 booked.

      Saved MahaRERA unit list

    4. 19 July 2026

      44 marked unsold · 53 sold · 0 booked.

      Saved MahaRERA unit list

    These dates show when the records were saved, not when units were sold. Sales may have changed since then, even if the saved counts are the same.

    More projects to explore

    Other projects in this locality.

    These projects list the same locality. They may differ in exact location, property type and price.

    Project Comparison Report

    Which project should you buy in?
    And which unit?

    Compare up to three projects. We read their plans and RERA documents, recommend units in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 12 July 2026

    MahaRERA · per-unit inventory · read 10 September 2026

    This is a past RERA unit list, not current availability. It does not give the date each unit was sold.

    Filed area means carpet area for building units and plot area for plots. Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

    Open MahaRERA · search P52100050630 ↗
    homeonpaper