Buyer’s Report
Understand this project
Find homes to consider, with advice on light, layout, privacy and surroundings.
₹4,999
Builder’s RERA records,
explained for buyers.
The builder’s RERA record, explained
SHRIRAM ASSOCIATES · P52100050974
For Divine Garden Phase II (P52100050974), 118 of 304 entries were marked unsold in the MahaRERA home list read 10 September 2026.
For Divine Garden Phase II, ₹8,992 per sq ft of carpet area is the median rate across 106 sold or booked entries with prices in the MahaRERA home list read 10 September 2026. These are historical agreement values, not current asking prices.
These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.
Builder’s completion target
The builder reported this target date. It is not a confirmed handover date.
Status shown on RERA
This is the status shown on RERA. It does not confirm an occupancy certificate or today’s construction progress.
Prices reported to RERA
₹8,992/ sq ft carpet area
Across 106 sold or booked entries with reported prices. The middle 80% of rates fall between ₹6,942 and ₹9,765.
MahaRERA · per-home inventory · read 10 September 2026
For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.
Sales Report
Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.
Inside this registered phase
304 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.
MahaRERA · per-home inventory · read 10 September 2026
Scroll sideways to see all columns.
| Filed building | Entries | Sold | Booked | Marked unsold | Other / unstated status | Recorded carpet-area range |
|---|---|---|---|---|---|---|
| Wing A7 | 108 | 45 | 0 | 36 | 27 | 49.88–89.06 sq m≈ 537–959 sq ft |
| Wing A8 | 108 | 35 | 0 | 43 | 30 | 49.88–89.06 sq m≈ 537–959 sq ft |
| Wing B1 | 88 | 26 | 0 | 39 | 23 | 65.68–91.21 sq m≈ 707–982 sq ft |
Different sizes are not necessarily different bedroom types. How we read and summarise the filing →
Unit Report
Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.
Didn’t help you decide? Full refund — no questions asked.
The same home number may appear in more than one building. Check both before choosing.
MahaRERA · per-home inventory · read 10 September 2026
| Home / building | Floor in the record | Carpet area | Reported status | Agreement value | Assess |
|---|---|---|---|---|---|
| A7-1Wing A7 | 205 | 67.75 sq m≈ 729 sq ft | Marked unsold | Not stated | |
| A7-10Wing A7 | 205 | 83.07 sq m≈ 894 sq ft | Marked unsold | Not stated | |
| A7-1001Wing A7 | 10 | 67.75 sq m≈ 729 sq ft | Marked unsold | Not stated | |
| A7-1002Wing A7 | 10 | 68.92 sq m≈ 742 sq ft | Not for sale | Not stated | |
| A7-1003Wing A7 | 10 | 68.92 sq m≈ 742 sq ft | Sold | ₹6,930,400 | |
| A7-1004Wing A7 | 10 | 67.75 sq m≈ 729 sq ft | Not for sale | Not stated | |
| A7-1005Wing A7 | 10 | 67.75 sq m≈ 729 sq ft | Marked unsold | Not stated | |
| A7-1006Wing A7 | 10 | 67.66 sq m≈ 728 sq ft | Not for sale | Not stated | |
| A7-1007Wing A7 | 10 | 67.75 sq m≈ 729 sq ft | Sold | ₹6,552,000 | |
| A7-1008Wing A7 | 10 | 87.86 sq m≈ 946 sq ft | Not for sale | Not stated | |
| A7-1009Wing A7 | 10 | 87.86 sq m≈ 946 sq ft | Not for sale | Not stated | |
| A7-101Wing A7 | 1 | 67.75 sq m≈ 729 sq ft | Marked unsold | Not stated |
Read every entry in one table: Read the complete saved home list.
Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.
More from the RERA documents
₹255,383,857 of an estimated ₹751,300,001 was reported as incurred (34.0%). This percentage is about costs. It does not show how much construction is complete.
MahaRERA project filing · read 19 July 2026 · registration P52100050974
Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.
| Building | Activity | Reported |
|---|---|---|
| Wing A7 | Excavation | 100.0% |
| Wing A7 | Basement (if any) | 100.0% |
| Wing A7 | Podiums (if any) | 0.0% |
| Wing A7 | Plinth | 100.0% |
| Wing A7 | Stilt Floor | 100.0% |
| Wing A7 | Slabs of Super Structure | 9.0% |
| Wing A7 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| Wing A7 | Sanitary Fittings within the flats / premises | 0.0% |
| Wing A7 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 25.4% |
| Wing A7 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 1.8% |
| Wing A7 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| Wing A8 | Excavation | 100.0% |
| Wing A8 | Basement (if any) | 100.0% |
| Wing A8 | Podiums (if any) | 50.0% |
| Wing A8 | Plinth | 100.0% |
| Wing A8 | Stilt Floor | 100.0% |
| Wing A8 | Slabs of Super Structure | 40.0% |
| Wing A8 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 16.0% |
| Wing A8 | Sanitary Fittings within the flats / premises | 0.0% |
| Wing A8 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50.0% |
| Wing A8 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 7.0% |
| Wing A8 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| Wing B1 | Excavation | 100.0% |
| Wing B1 | Basement (if any) | 100.0% |
| Wing B1 | Podiums (if any) | 75.0% |
| Wing B1 | Plinth | 100.0% |
| Wing B1 | Stilt Floor | 100.0% |
| Wing B1 | Slabs of Super Structure | 90.0% |
| Wing B1 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 23.0% |
| Wing B1 | Sanitary Fittings within the flats / premises | 32.0% |
| Wing B1 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 74.0% |
| Wing B1 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 22.5% |
| Wing B1 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
MahaRERA project filing · read 19 July 2026 · registration P52100050974
RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.
| Filing | Own funds | Borrowing | Payments from buyers | Total |
|---|---|---|---|---|
| Estimated plan | ₹3,945,960 | ₹0 | ₹1,065,144,050 | ₹1,069,090,010 |
| Actual raised | ₹363,414,846 | ₹0 | ₹26,624,350 | ₹390,039,196 |
MahaRERA project filing · read 19 July 2026 · registration P52100050974
12 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.
MahaRERA project filing · read 19 July 2026 · registration P52100050974
A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.
MahaRERA project filing · read 19 July 2026 · registration P52100050974
Builder and past records
Projects registered under this company
4Pune registrations
These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.
MahaRERA Pune registration records · read 12 July 2026
Past records of sales and unsold homes
27 September 2026
118 marked unsold · 106 sold · 0 booked.
Saved MahaRERA home list
19 September 2026
118 marked unsold · 106 sold · 0 booked.
Saved MahaRERA home list
10 September 2026
118 marked unsold · 106 sold · 0 booked.
Saved MahaRERA home list
19 July 2026
144 marked unsold · 70 sold · 10 booked.
Saved MahaRERA home list
These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.
Project Comparison Report
Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.
2 projects · ₹7,999
3 projects · ₹9,999
Within 1 working day
Didn’t help you decide? Full refund — no questions asked.
Compare project details for free →MahaRERA · registration record · read 12 July 2026
MahaRERA · per-home inventory · read 10 September 2026
This is a past RERA home list, not current availability. It does not give the date each home was sold.
Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.
Open MahaRERA · search P52100050974 ↗