The builder’s RERA record, explained

PRIMEROSE

GURUKRUPA DEVELOPERS · P52100051551

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For PRIMEROSE (P52100051551), 69 of 174 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).

MahaRERA · per-home inventory · saved-file date 18 July 2026

For PRIMEROSE, ₹9,976 per sq ft of carpet area is the median rate across 105 sold or booked entries with prices in the MahaRERA home list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.

MahaRERA · per-home inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹9,976/ sq ft carpet area

Across 105 sold or booked entries with reported prices. The middle 80% of rates fall between ₹9,522 and ₹10,693.

MahaRERA · per-home inventory · saved-file date 18 July 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar homes sell for?

Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

174 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
B14428016039.01–93.33 sq m≈ 420–1,005 sq ft
B24419025039.01–93.33 sq m≈ 420–1,005 sq ft
B34232010039.01–93.33 sq m≈ 420–1,005 sq ft
B44426018039.01–93.33 sq m≈ 420–1,005 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

174 listed entries

MahaRERA · per-home inventory · saved-file date 18 July 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
B1-1001B11039.01 sq m≈ 420 sq ftSold₹4,450,000
B1-1002B11055.84 sq m≈ 601 sq ftSold₹6,335,500
B1-1003B11053.71 sq m≈ 578 sq ftMarked unsoldNot stated
B1-101B1139.01 sq m≈ 420 sq ftSold₹4,490,000
B1-102B1155.84 sq m≈ 601 sq ftMarked unsoldNot stated
B1-103B1153.71 sq m≈ 578 sq ftMarked unsoldNot stated
B1-1101B11139.01 sq m≈ 420 sq ftSold₹4,395,600
B1-1102B11155.84 sq m≈ 601 sq ftSold₹6,325,000
B1-1103B11153.71 sq m≈ 578 sq ftMarked unsoldNot stated
B1-1201B11239.01 sq m≈ 420 sq ftSold₹4,010,000
B1-1202B11255.84 sq m≈ 601 sq ftSold₹6,668,500
B1-1203B11253.71 sq m≈ 578 sq ftMarked unsoldNot stated

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
B1Excavation100.0%
B1Basement (if any)100.0%
B1Podiums (if any) 100.0%
B1Plinth100.0%
B1Stilt Floor 100.0%
B1Slabs of Super Structure38.0%
B1Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises11.0%
B1Sanitary Fittings within the flats / premises0.0%
B1Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
B1External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
B1Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
B2Excavation100.0%
B2Basement (if any)100.0%
B2Podiums (if any) 100.0%
B2Plinth100.0%
B2Stilt Floor 100.0%
B2Slabs of Super Structure38.0%
B2Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises11.0%
B2Sanitary Fittings within the flats / premises0.0%
B2Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
B2External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
B2Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
B3Excavation100.0%
B3Basement (if any)100.0%
B3Podiums (if any) 100.0%
B3Plinth100.0%
B3Stilt Floor 100.0%
B3Slabs of Super Structure38.0%
B3Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises11.0%
B3Sanitary Fittings within the flats / premises0.0%
B3Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
B3External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
B3Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
B4Excavation100.0%
B4Basement (if any)100.0%
B4Podiums (if any) 100.0%
B4Plinth100.0%
B4Stilt Floor 100.0%
B4Slabs of Super Structure38.0%
B4Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises11.0%
B4Sanitary Fittings within the flats / premises0.0%
B4Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
B4External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
B4Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 19 July 2026 · registration P52100051551

Reported deadline extensions

Revised targetReason given by the builder
31 March 2027The project was originally registered based on the Commencement Certificate, with a declared completion date of 31/03/2026. Subsequently, during development, the promoter decided to utilize Transferable Development Rights (TDR) in order to optimally and lawfully harness the sanctioned development potential of the project. The approval and sanctioning of the TDR took approximately one year, owing to the extensive administrative and regulatory procedures involved. Since the utilization of TDR was mandatory for implementing the revised sanctioned plans, construction activities directly dependent on such approvals could not be progressed during the pendency of TDR sanctioning. As a result, the construction schedule was substantially impacted due to reasons beyond the control of the promoter. The prolonged time taken by the planning authority for sanctioning the TDR and approving the revised plans directly affected the execution of construction works, thereby making it impracticable to adhere to the originally declared project completion timeline.

MahaRERA project filing · read 19 July 2026 · registration P52100051551

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹25,000,000₹50,000,000₹92,027,975₹167,027,975
Actual raised₹0₹144,765,912₹268,242,061₹491,440,570

MahaRERA project filing · read 19 July 2026 · registration P52100051551

Quarterly filing record

12 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 19 July 2026 · registration P52100051551

Documents named in the filing

  • Promoter PAN · 1 listed
  • Form 1 — Architect's certificate · 11 listed
  • Form 3 — CA certificate · 12 listed
  • Form 2 — Engineer's certificate · 11 listed
  • Title / search report · 1 listed
  • Form B — Promoter declaration · 1 listed
  • Sanctioned building plan · 1 listed
  • Sanctioned layout plan · 29 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100051551

Builder and past records

What else does the record show?

Projects registered under this company

GURUKRUPA DEVELOPERS

4Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

Past records of sales and unsold homes

  1. 27 September 2026

    69 marked unsold · 105 sold · 0 booked.

    Saved MahaRERA home list

  2. 19 September 2026

    69 marked unsold · 105 sold · 0 booked.

    Saved MahaRERA home list

  3. 10 September 2026

    69 marked unsold · 105 sold · 0 booked.

    Saved MahaRERA home list

  4. 19 July 2026

    69 marked unsold · 105 sold · 0 booked.

    Saved MahaRERA home list

These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

More projects to explore

Other projects in this locality.

These projects list the same locality. They may differ in exact location, home type and price.

Project Comparison Report

Which project should you buy in?
And which home?

Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

Create my Comparison Report →

2 projects · ₹7,999
3 projects · ₹9,999

Within 1 working day

Didn’t help you decide? Full refund — no questions asked.

Compare project details for free →

Sources and dates.

MahaRERA · registration record · read 12 July 2026

MahaRERA · per-home inventory · saved-file date 18 July 2026

This is a past RERA home list, not current availability. It does not give the date each home was sold.

The home-list date is based on the saved file’s details.

Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

Open MahaRERA · search P52100051551 ↗