homeonpaper.

Builder’s RERA records,
explained for buyers.

The builder’s RERA record, explained

KAMAL BAUG

SAPTARSHI BUILDCON · P52100052708

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For KAMAL BAUG (P52100052708), 103 of 174 entries were marked unsold in the MahaRERA home list read 4 September 2026.

MahaRERA · per-home inventory · read 4 September 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Inside this registered phase

How do the buildings compare in the record?

174 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · read 4 September 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
WING-A160001638.38 sq m≈ 413 sq ft
WING-B320003238.01–38.38 sq m≈ 409–413 sq ft
WING-C240022238.38 sq m≈ 413 sq ft
WING-D240024037.45–38.75 sq m≈ 403–417 sq ft
WING-E400040038.38 sq m≈ 413 sq ft
WING-F240023138.38–39.87 sq m≈ 413–429 sq ft
WING-G140014037.83–60.32 sq m≈ 407–649 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

174 listed entries

MahaRERA · per-home inventory · read 4 September 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
101WING-A138.38 sq m≈ 413 sq ftNot for saleNot stated
102WING-A138.38 sq m≈ 413 sq ftNot for saleNot stated
103WING-A138.38 sq m≈ 413 sq ftNot for saleNot stated
104WING-A138.38 sq m≈ 413 sq ftNot for saleNot stated
201WING-A238.38 sq m≈ 413 sq ftNot for saleNot stated
202WING-A238.38 sq m≈ 413 sq ftNot for saleNot stated
203WING-A238.38 sq m≈ 413 sq ftNot for saleNot stated
204WING-A238.38 sq m≈ 413 sq ftNot for saleNot stated
301WING-A338.38 sq m≈ 413 sq ftNot for saleNot stated
302WING-A338.38 sq m≈ 413 sq ftNot for saleNot stated
303WING-A338.38 sq m≈ 413 sq ftNot for saleNot stated
304WING-A338.38 sq m≈ 413 sq ftNot for saleNot stated

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
WING-AExcavation0.0%
WING-ABasement (if any)0.0%
WING-APodiums (if any) 0.0%
WING-APlinth0.0%
WING-AStilt Floor 0.0%
WING-ASlabs of Super Structure0.0%
WING-AInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
WING-ASanitary Fittings within the flats / premises0.0%
WING-AStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
WING-AExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
WING-AInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
WING-BExcavation0.0%
WING-BBasement (if any)0.0%
WING-BPodiums (if any) 0.0%
WING-BPlinth0.0%
WING-BStilt Floor 0.0%
WING-BSlabs of Super Structure0.0%
WING-BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
WING-BSanitary Fittings within the flats / premises0.0%
WING-BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
WING-BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
WING-BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
WING-CExcavation0.0%
WING-CBasement (if any)0.0%
WING-CPodiums (if any) 0.0%
WING-CPlinth0.0%
WING-CStilt Floor 0.0%
WING-CSlabs of Super Structure0.0%
WING-CInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
WING-CSanitary Fittings within the flats / premises0.0%
WING-CStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
WING-CExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
WING-CInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
WING-DExcavation0.0%
WING-DBasement (if any)0.0%
WING-DPodiums (if any) 0.0%
WING-DPlinth0.0%
WING-DStilt Floor 0.0%
WING-DSlabs of Super Structure0.0%
WING-DInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
WING-DSanitary Fittings within the flats / premises0.0%
WING-DStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
WING-DExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
WING-DInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
WING-EExcavation0.0%
WING-EBasement (if any)0.0%
WING-EPodiums (if any) 0.0%
WING-EPlinth0.0%
WING-EStilt Floor 0.0%
WING-ESlabs of Super Structure0.0%
WING-EInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
WING-ESanitary Fittings within the flats / premises0.0%
WING-EStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
WING-EExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
WING-EInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
WING-FExcavation0.0%
WING-FBasement (if any)0.0%
WING-FPodiums (if any) 0.0%
WING-FPlinth0.0%
WING-FStilt Floor 0.0%
WING-FSlabs of Super Structure0.0%
WING-FInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
WING-FSanitary Fittings within the flats / premises0.0%
WING-FStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
WING-FExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
WING-FInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
WING-GExcavation0.0%
WING-GBasement (if any)0.0%
WING-GPodiums (if any) 0.0%
WING-GPlinth0.0%
WING-GStilt Floor 0.0%
WING-GSlabs of Super Structure0.0%
WING-GInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
WING-GSanitary Fittings within the flats / premises0.0%
WING-GStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
WING-GExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
WING-GInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 18 July 2026 · registration P52100052708

Quarterly filing record

15 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 18 July 2026 · registration P52100052708

Documents named in the filing

  • Promoter PAN · 1 listed
  • Form 1 — Architect's certificate · 1 listed
  • Form 3 — CA certificate · 1 listed
  • Form 2 — Engineer's certificate · 1 listed
  • Form B — Promoter declaration · 1 listed
  • Title / search report · 1 listed
  • Sanctioned layout plan · 2 listed
  • Sanctioned building plan · 10 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 18 July 2026 · registration P52100052708

Builder and past records

What else does the record show?

Projects registered under this company

SAPTARSHI BUILDCON

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

    Past records of sales and unsold homes

    1. 21 September 2026

      103 marked unsold · 0 sold · 0 booked.

      Saved MahaRERA home list

    2. 12 September 2026

      103 marked unsold · 0 sold · 0 booked.

      Saved MahaRERA home list

    3. 4 September 2026

      103 marked unsold · 0 sold · 0 booked.

      Saved MahaRERA home list

    These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

    qpr noncompliance

    September

    MahaRERA · due-non-compliance-qpr · read 2026-07-27T23:06:00.826927+00:00

    Project Comparison Report

    Which project should you buy in?
    And which home?

    Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 12 July 2026

    MahaRERA · per-home inventory · read 4 September 2026

    This is a past RERA home list, not current availability. It does not give the date each home was sold.

    Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

    Open MahaRERA · search P52100052708 ↗
    homeonpaper