Buyer’s Report
Understand this project
Find homes to consider, with advice on light, layout, privacy and surroundings.
₹4,999
Builder’s RERA records,
explained for buyers.
The builder’s RERA record, explained
Sunil Ganpati Aitavadekar · P52100053452
For Vrundavan Park (P52100053452), 288 of 288 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).
MahaRERA · per-home inventory · saved-file date 18 July 2026
These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.
Builder’s completion target
The builder reported this target date. It is not a confirmed handover date.
Status shown on RERA
This is the status shown on RERA. It does not confirm an occupancy certificate or today’s construction progress.
Inside this registered phase
288 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.
MahaRERA · per-home inventory · saved-file date 18 July 2026
Scroll sideways to see all columns.
| Filed building | Entries | Sold | Booked | Marked unsold | Other / unstated status | Recorded carpet-area range |
|---|---|---|---|---|---|---|
| Vrundavan Park Building A | 144 | 0 | 0 | 144 | 0 | 37.09–57.02 sq m≈ 399–614 sq ft |
| Vrundavan Park Building B | 144 | 0 | 0 | 144 | 0 | 37.09–57.02 sq m≈ 399–614 sq ft |
Different sizes are not necessarily different bedroom types. How we read and summarise the filing →
Unit Report
Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.
Didn’t help you decide? Full refund — no questions asked.
The same home number may appear in more than one building. Check both before choosing.
MahaRERA · per-home inventory · saved-file date 18 July 2026
| Home / building | Floor in the record | Carpet area | Reported status | Agreement value | Assess |
|---|---|---|---|---|---|
| 101Vrundavan Park Building A | 1 | 43.11 sq m≈ 464 sq ft | Marked unsold | Not stated | |
| 102Vrundavan Park Building A | 1 | 57.02 sq m≈ 614 sq ft | Marked unsold | Not stated | |
| 103Vrundavan Park Building A | 1 | 57.02 sq m≈ 614 sq ft | Marked unsold | Not stated | |
| 104Vrundavan Park Building A | 1 | 37.74 sq m≈ 406 sq ft | Marked unsold | Not stated | |
| 105Vrundavan Park Building A | 1 | 41.79 sq m≈ 450 sq ft | Marked unsold | Not stated | |
| 106Vrundavan Park Building A | 1 | 46.22 sq m≈ 498 sq ft | Marked unsold | Not stated | |
| 107Vrundavan Park Building A | 1 | 42.04 sq m≈ 453 sq ft | Marked unsold | Not stated | |
| 108Vrundavan Park Building A | 1 | 37.09 sq m≈ 399 sq ft | Marked unsold | Not stated | |
| 109Vrundavan Park Building A | 1 | 37.09 sq m≈ 399 sq ft | Marked unsold | Not stated | |
| 110Vrundavan Park Building A | 1 | 37.09 sq m≈ 399 sq ft | Marked unsold | Not stated | |
| 111Vrundavan Park Building A | 1 | 37.09 sq m≈ 399 sq ft | Marked unsold | Not stated | |
| 112Vrundavan Park Building A | 1 | 37.09 sq m≈ 399 sq ft | Marked unsold | Not stated |
Read every entry in one table: Read the complete saved home list.
Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.
More from the RERA documents
₹180,000,000 of an estimated ₹750,000,000 was reported as incurred (24.0%). This percentage is about costs. It does not show how much construction is complete.
MahaRERA project filing · read 19 July 2026 · registration P52100053452
Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.
| Building | Activity | Reported |
|---|---|---|
| Vrundavan Park Building A | Excavation | 100.0% |
| Vrundavan Park Building A | Basement (if any) | 0.0% |
| Vrundavan Park Building A | Podiums (if any) | 0.0% |
| Vrundavan Park Building A | Plinth | 0.0% |
| Vrundavan Park Building A | Stilt Floor | 100.0% |
| Vrundavan Park Building A | Slabs of Super Structure | 50.0% |
| Vrundavan Park Building A | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| Vrundavan Park Building A | Sanitary Fittings within the flats / premises | 0.0% |
| Vrundavan Park Building A | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20.0% |
| Vrundavan Park Building A | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 10.0% |
| Vrundavan Park Building A | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| Vrundavan Park Building B | Excavation | 100.0% |
| Vrundavan Park Building B | Basement (if any) | 0.0% |
| Vrundavan Park Building B | Podiums (if any) | 0.0% |
| Vrundavan Park Building B | Plinth | 0.0% |
| Vrundavan Park Building B | Stilt Floor | 100.0% |
| Vrundavan Park Building B | Slabs of Super Structure | 50.0% |
| Vrundavan Park Building B | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10.0% |
| Vrundavan Park Building B | Sanitary Fittings within the flats / premises | 0.0% |
| Vrundavan Park Building B | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20.0% |
| Vrundavan Park Building B | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| Vrundavan Park Building B | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
MahaRERA project filing · read 19 July 2026 · registration P52100053452
| Revised target | Reason given by the builder |
|---|---|
| 7 April 2027 | The project, initially scheduled to be completed within the stipulated timeframe (i.e. dated 7 April 2025), is facing unforeseen challenges due to its complexity and the volume of work involved. |
| 31 December 2027 | Due to delays caused by material shortages, labor shortages, and insufficient funding, the project has been delayed. However, with the funding now available, we kindly request an extension until 31/12/2027 to complete the project |
MahaRERA project filing · read 19 July 2026 · registration P52100053452
RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.
| Filing | Own funds | Borrowing | Payments from buyers | Total |
|---|---|---|---|---|
| Estimated plan | ₹80,598,276 | ₹80,598,276 | ₹241,794,828 | ₹402,991,380 |
| Actual raised | ₹118,351,662 | ₹50,482,756 | ₹95,000 | ₹168,929,418 |
MahaRERA project filing · read 19 July 2026 · registration P52100053452
10 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.
MahaRERA project filing · read 19 July 2026 · registration P52100053452
A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.
MahaRERA project filing · read 19 July 2026 · registration P52100053452
Builder and past records
Projects registered under this company
1Pune registrations
These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.
MahaRERA Pune registration records · read 12 July 2026
Past records of sales and unsold homes
27 September 2026
288 marked unsold · 0 sold · 0 booked.
Saved MahaRERA home list
19 September 2026
288 marked unsold · 0 sold · 0 booked.
Saved MahaRERA home list
10 September 2026
288 marked unsold · 0 sold · 0 booked.
Saved MahaRERA home list
19 July 2026
288 marked unsold · 0 sold · 0 booked.
Saved MahaRERA home list
These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.
Project Comparison Report
Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.
2 projects · ₹7,999
3 projects · ₹9,999
Within 1 working day
Didn’t help you decide? Full refund — no questions asked.
Compare project details for free →MahaRERA · registration record · read 12 July 2026
MahaRERA · per-home inventory · saved-file date 18 July 2026
This is a past RERA home list, not current availability. It does not give the date each home was sold.
The home-list date is based on the saved file’s details.
Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.
Open MahaRERA · search P52100053452 ↗