For ANANDAM PHASE I (P52100055818), 118 of 276 entries were marked unsold in the MahaRERA home list read 28 September 2026.
For ANANDAM PHASE I, ₹6,030 per sq ft of carpet area is the median rate across 79 sold or booked entries with prices in the MahaRERA home list read 28 September 2026. These are historical agreement values, not current asking prices.
These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.
Builder’s completion target
The builder reported this target date. It is not a confirmed handover date.
Status shown on RERA
This is the status shown on RERA. It does not confirm an occupancy certificate or today’s construction progress.
Prices reported to RERA
₹6,030/ sq ft carpet area
Across 79 sold or booked entries with reported prices. The middle 80% of rates fall between ₹5,827 and ₹6,234.
MahaRERA · per-home inventory · read 28 September 2026
For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.
Sales Report
Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.
Inside this registered phase
276 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.
MahaRERA · per-home inventory · read 28 September 2026
Scroll sideways to see all columns.
| Filed building | Entries | Sold | Booked | Marked unsold | Other / unstated status | Recorded carpet-area range |
|---|---|---|---|---|---|---|
| WING A | 110 | 14 | 0 | 20 | 76 | 45.87–53.86 sq m≈ 494–580 sq ft |
| WING B | 166 | 56 | 9 | 98 | 3 | 29.87 sq m≈ 322 sq ft |
Different sizes are not necessarily different bedroom types. How we read and summarise the filing →
Unit Report
Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.
Didn’t help you decide? Full refund — no questions asked.
The same home number may appear in more than one building. Check both before choosing.
MahaRERA · per-home inventory · read 28 September 2026
| Home / building | Floor in the record | Carpet area | Reported status | Agreement value | Assess |
|---|---|---|---|---|---|
| 1001WING A | 10 | 53.86 sq m≈ 580 sq ft | Not for sale | Not stated | |
| 1002WING A | 10 | 45.87 sq m≈ 494 sq ft | Not for sale | Not stated | |
| 1003WING A | 10 | 45.87 sq m≈ 494 sq ft | Not for sale | Not stated | |
| 1004WING A | 10 | 53.86 sq m≈ 580 sq ft | Not for sale | Not stated | |
| 1005WING A | 10 | 53.86 sq m≈ 580 sq ft | Not for sale | Not stated | |
| 1006WING A | 10 | 51.48 sq m≈ 554 sq ft | Not for sale | Not stated | |
| 1007WING A | 10 | 51.48 sq m≈ 554 sq ft | Not for sale | Not stated | |
| 1008WING A | 10 | 53.86 sq m≈ 580 sq ft | Not for sale | Not stated | |
| 101WING A | 1 | 53.86 sq m≈ 580 sq ft | Marked unsold | Not stated | |
| 102WING A | 1 | 45.87 sq m≈ 494 sq ft | Marked unsold | Not stated | |
| 103WING A | 1 | 45.87 sq m≈ 494 sq ft | Marked unsold | Not stated | |
| 104WING A | 1 | 53.86 sq m≈ 580 sq ft | Sold | ₹3,635,939 |
Read every entry in one table: Read the complete saved home list.
Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.
More from the RERA documents
₹36,382,807 of an estimated ₹520,429,481 was reported as incurred (7.0%). This percentage is about costs. It does not show how much construction is complete.
MahaRERA project filing · read 19 July 2026 · registration P52100055818
Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.
| Building | Activity | Reported |
|---|---|---|
| WING A | Excavation | 100.0% |
| WING A | Basement (if any) | 100.0% |
| WING A | Podiums (if any) | 0.0% |
| WING A | Plinth | 100.0% |
| WING A | Stilt Floor | 0.0% |
| WING A | Slabs of Super Structure | 15.0% |
| WING A | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| WING A | Sanitary Fittings within the flats / premises | 0.0% |
| WING A | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| WING A | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| WING A | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| WING B | Excavation | 100.0% |
| WING B | Basement (if any) | 0.0% |
| WING B | Podiums (if any) | 0.0% |
| WING B | Plinth | 100.0% |
| WING B | Stilt Floor | 0.0% |
| WING B | Slabs of Super Structure | 15.0% |
| WING B | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| WING B | Sanitary Fittings within the flats / premises | 0.0% |
| WING B | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| WING B | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| WING B | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
MahaRERA project filing · read 19 July 2026 · registration P52100055818
| Revised target | Reason given by the builder |
|---|---|
| 31 December 2027 | The request for a MahaRERA extension for the project "ANANDAM PHASE I" (Registration No. P52100055818) by the Promoter, M/s. A V Bhat Developers LLP, is primarily driven by unforeseen geological and environmental challenges encountered during the crucial initial phases of construction. While the construction commenced diligently following all necessary regulatory approvals, the project execution was severely impacted during the excavation and foundation stages. The team encountered a substantial and unexpected layout of hard rock strata within the project land. Safely penetrating and clearing this hard rock required the deployment of specialized heavy machinery, advanced technical resources, and significantly more time than originally estimated for foundation completion. Further compounding this delay, the project site experienced unexpected and excessively heavy rainfall. This led to severe water logging, safety hazards, and repeated disruptions to the ongoing excavation and structural activities. These force majeure-like environmental and geological factors were entirely beyond the reasonable control of the Promoter, directly impacting and shifting the project’s critical construction milestones. Despite these setbacks, the Promoter has continuously deployed additional manpower, machinery, and financial resources to expedite progress. Construction is currently moving forward in full swing. To ensure the project is completed with the highest quality standards and in strict compliance with the RERA Act, the Promoter is seeking a project extension of One (1) Year, revising the expected date of completion to 31st December 2027. |
MahaRERA project filing · read 19 July 2026 · registration P52100055818
RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.
| Filing | Own funds | Borrowing | Payments from buyers | Total |
|---|---|---|---|---|
| Estimated plan | ₹70,468,124 | ₹200,000,000 | ₹230,000,000 | ₹610,468,124 |
| Actual raised | ₹26,004,764 | ₹0 | ₹57,903,281 | ₹106,625,084 |
MahaRERA project filing · read 19 July 2026 · registration P52100055818
8 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.
MahaRERA project filing · read 19 July 2026 · registration P52100055818
A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.
MahaRERA project filing · read 19 July 2026 · registration P52100055818
Builder and past records
Projects registered under this company
1Pune registrations
These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.
MahaRERA Pune registration records · read 12 July 2026
Past records of sales and unsold homes
28 September 2026
118 marked unsold · 70 sold · 9 booked.
Saved MahaRERA home list
19 September 2026
132 marked unsold · 56 sold · 9 booked.
Saved MahaRERA home list
11 September 2026
132 marked unsold · 56 sold · 9 booked.
Saved MahaRERA home list
19 July 2026
132 marked unsold · 56 sold · 9 booked.
Saved MahaRERA home list
These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.
More projects to explore
These projects list the same locality. They may differ in exact location, home type and price.
Vadgaon Maval · Pune
PP1260002502669
46 of 108 entries marked unsold
MahaRERA · per-home inventory · read 19 July 2026
View project details →Vadgaon Maval · Pune
P52100080330
160 of 172 entries marked unsold
MahaRERA · per-home inventory · read 11 September 2026
View project details →Project Comparison Report
Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.
2 projects · ₹7,999
3 projects · ₹9,999
Within 1 working day
Didn’t help you decide? Full refund — no questions asked.
Compare project details for free →MahaRERA · registration record · read 12 July 2026
MahaRERA · per-home inventory · read 28 September 2026
This is a past RERA home list, not current availability. It does not give the date each home was sold.
Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.
Open MahaRERA · search P52100055818 ↗