For Park Abhilasha- A,B,C Building (P52100055861), 77 of 168 entries were marked unsold in the MahaRERA unit list dated 18 July 2026 (saved-file date).
MahaRERA · per-unit inventory · saved-file date 18 July 2026
For Park Abhilasha- A,B,C Building, ₹3,311 per sq ft of filed area is the median rate across 11 sold or booked entries with prices in the MahaRERA unit list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.
MahaRERA · per-unit inventory · saved-file date 18 July 2026
These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.
Builder’s completion target
The builder reported this target date. It is not a confirmed handover date.
Status shown on RERA
This is the status shown on RERA. It does not confirm an occupancy certificate or today’s construction progress.
Prices reported to RERA
₹3,311/ sq ft filed area
Across 11 sold or booked entries with reported prices. The middle 80% of rates fall between ₹2,876 and ₹4,850.
MahaRERA · per-unit inventory · saved-file date 18 July 2026
For each sold or booked entry, we divide the reported agreement value by its filed area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold units and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.
Sales Report
Compare filed values by building, unit-number pattern and area. See which units were marked unsold on the date shown.
Inside this registered phase
168 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.
MahaRERA · per-unit inventory · saved-file date 18 July 2026
Scroll sideways to see all columns.
| Filed building | Entries | Sold | Booked | Marked unsold | Other / unstated status | Recorded filed-area range |
|---|---|---|---|---|---|---|
| Park Abhilasha A Building | 56 | 10 | 0 | 46 | 0 | 40.68–53.63 sq m≈ 438–577 sq ft |
| Park Abhilasha B Building | 56 | 1 | 0 | 15 | 40 | 40.35–53.63 sq m≈ 434–577 sq ft |
| Park Abhilasha C Building | 56 | 0 | 0 | 16 | 40 | 40.35–53.63 sq m≈ 434–577 sq ft |
Area means carpet area for building units and plot area for plots. Size alone does not establish use or layout. How we read and summarise the filing →
Unit Report
Understand its light, privacy, layout and surroundings. See how it compares with similar units and other options in this project.
Didn’t help you decide? Full refund — no questions asked.
The same unit number may appear in more than one building. Check both before choosing.
MahaRERA · per-unit inventory · saved-file date 18 July 2026
| Unit / building | Floor in the record | Filed area | Reported status | Agreement value | Assess |
|---|---|---|---|---|---|
| 101Park Abhilasha A Building / Wing NA | 1 | 40.69 sq m≈ 438 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 102Park Abhilasha A Building / Wing NA | 1 | 53.63 sq m≈ 577 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 103Park Abhilasha A Building / Wing NA | 1 | 53.63 sq m≈ 577 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 104Park Abhilasha A Building / Wing NA | 1 | 40.69 sq m≈ 438 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 105Park Abhilasha A Building / Wing NA | 1 | 40.69 sq m≈ 438 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 106Park Abhilasha A Building / Wing NA | 1 | 53.63 sq m≈ 577 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 107Park Abhilasha A Building / Wing NA | 1 | 53.63 sq m≈ 577 sq ft · RERA carpet area | Sold | ₹1,900,000 | |
| 108Park Abhilasha A Building / Wing NA | 1 | 40.69 sq m≈ 438 sq ft · RERA carpet area | Sold | ₹1,250,000 | |
| 201Park Abhilasha A Building / Wing NA | 2 | 40.69 sq m≈ 438 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 202Park Abhilasha A Building / Wing NA | 2 | 53.63 sq m≈ 577 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 203Park Abhilasha A Building / Wing NA | 2 | 53.63 sq m≈ 577 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 204Park Abhilasha A Building / Wing NA | 2 | 40.69 sq m≈ 438 sq ft · RERA carpet area | Marked unsold | Not stated |
Read every entry in one table: Read the complete saved unit list.
Choose the unit you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.
More from the RERA documents
Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.
| Building | Activity | Reported |
|---|---|---|
| Park Abhilasha A Building | Excavation | 100.0% |
| Park Abhilasha A Building | Basement (if any) | 100.0% |
| Park Abhilasha A Building | Podiums (if any) | 0.0% |
| Park Abhilasha A Building | Plinth | 100.0% |
| Park Abhilasha A Building | Stilt Floor | 0.0% |
| Park Abhilasha A Building | Slabs of Super Structure | 50.0% |
| Park Abhilasha A Building | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10.0% |
| Park Abhilasha A Building | Sanitary Fittings within the flats / premises | 0.0% |
| Park Abhilasha A Building | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| Park Abhilasha A Building | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| Park Abhilasha A Building | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| Park Abhilasha B Building | Excavation | 100.0% |
| Park Abhilasha B Building | Basement (if any) | 100.0% |
| Park Abhilasha B Building | Podiums (if any) | 0.0% |
| Park Abhilasha B Building | Plinth | 100.0% |
| Park Abhilasha B Building | Stilt Floor | 0.0% |
| Park Abhilasha B Building | Slabs of Super Structure | 20.0% |
| Park Abhilasha B Building | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| Park Abhilasha B Building | Sanitary Fittings within the flats / premises | 0.0% |
| Park Abhilasha B Building | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| Park Abhilasha B Building | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| Park Abhilasha B Building | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| Park Abhilasha C Building | Excavation | 100.0% |
| Park Abhilasha C Building | Basement (if any) | 0.0% |
| Park Abhilasha C Building | Podiums (if any) | 0.0% |
| Park Abhilasha C Building | Plinth | 0.0% |
| Park Abhilasha C Building | Stilt Floor | 0.0% |
| Park Abhilasha C Building | Slabs of Super Structure | 0.0% |
| Park Abhilasha C Building | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| Park Abhilasha C Building | Sanitary Fittings within the flats / premises | 0.0% |
| Park Abhilasha C Building | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| Park Abhilasha C Building | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| Park Abhilasha C Building | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
MahaRERA project filing · read 19 July 2026 · registration P52100055861
RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.
| Filing | Own funds | Borrowing | Payments from buyers | Total |
|---|---|---|---|---|
| Estimated plan | ₹30,000,000 | ₹50,000,000 | ₹79,901,299 | ₹194,901,299 |
| Actual raised | ₹9,565,303 | ₹0 | ₹0 | ₹9,565,303 |
MahaRERA project filing · read 19 July 2026 · registration P52100055861
10 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.
MahaRERA project filing · read 19 July 2026 · registration P52100055861
A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.
MahaRERA project filing · read 19 July 2026 · registration P52100055861
Builder and past records
Projects registered under this company
2Pune registrations
These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.
MahaRERA Pune registration records · read 12 July 2026
Past records of sales and unsold units
28 September 2026
77 marked unsold · 11 sold · 0 booked.
Saved MahaRERA unit list
19 September 2026
77 marked unsold · 11 sold · 0 booked.
Saved MahaRERA unit list
11 September 2026
77 marked unsold · 11 sold · 0 booked.
Saved MahaRERA unit list
19 July 2026
77 marked unsold · 11 sold · 0 booked.
Saved MahaRERA unit list
These dates show when the records were saved, not when units were sold. Sales may have changed since then, even if the saved counts are the same.
Project Comparison Report
Compare up to three projects. We read their plans and RERA documents, recommend units in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.
2 projects · ₹7,999
3 projects · ₹9,999
Within 1 working day
Didn’t help you decide? Full refund — no questions asked.
Compare project details for free →MahaRERA · registration record · read 12 July 2026
MahaRERA · per-unit inventory · saved-file date 18 July 2026
This is a past RERA unit list, not current availability. It does not give the date each unit was sold.
The unit-list date is based on the saved file’s details.
Filed area means carpet area for building units and plot area for plots. Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.
Open MahaRERA · search P52100055861 ↗