The builder’s RERA record, explained

AMARILLO PHASE 2

Krrsna Leela Skyscraper LLP · P52100066513

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For AMARILLO PHASE 2 (P52100066513), 194 of 197 entries were marked unsold in the MahaRERA unit list read 11 September 2026.

MahaRERA · per-unit inventory · read 11 September 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find units to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular unit

See its advantages, drawbacks and how it compares with other units in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended units in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Inside this registered phase

How do the buildings compare in the record?

197 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-unit inventory · read 11 September 2026

Scroll sideways to see all columns.

Building names, sale status and filed areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded filed-area range
Wing D890089035.99–95.90 sq m≈ 387–1,032 sq ft
Wing E6006057.46–72.72 sq m≈ 618–783 sq ft
Wing F6006057.46–72.72 sq m≈ 618–783 sq ft
Wing G963093057.15–72.72 sq m≈ 615–783 sq ft

Area means carpet area for building units and plot area for plots. Size alone does not establish use or layout. How we read and summarise the filing →

Unit Report

Is this the right
unit for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar units and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your unit in the RERA list.

The same unit number may appear in more than one building. Check both before choosing.

197 listed entries

MahaRERA · per-unit inventory · read 11 September 2026

RERA unit list, not current availability
Unit / buildingFloor in the recordFiled areaReported statusAgreement valueAssess
1001Wing D / Wing NA1095.9 sq m≈ 1,032 sq ft · RERA carpet areaMarked unsoldNot stated
1002Wing D / Wing NA1071.77 sq m≈ 773 sq ft · RERA carpet areaMarked unsoldNot stated
1003Wing D / Wing NA1071.97 sq m≈ 775 sq ft · RERA carpet areaMarked unsoldNot stated
1004Wing D / Wing NA1074.02 sq m≈ 797 sq ft · RERA carpet areaMarked unsoldNot stated
1005Wing D / Wing NA1095.9 sq m≈ 1,032 sq ft · RERA carpet areaMarked unsoldNot stated
1006Wing D / Wing NA1095.9 sq m≈ 1,032 sq ft · RERA carpet areaMarked unsoldNot stated
1007Wing D / Wing NA1074.02 sq m≈ 797 sq ft · RERA carpet areaMarked unsoldNot stated
101Wing D / Wing NA147.69 sq m≈ 513 sq ft · RERA carpet areaMarked unsoldNot stated
102Wing D / Wing NA139.48 sq m≈ 425 sq ft · RERA carpet areaMarked unsoldNot stated
103Wing D / Wing NA139.48 sq m≈ 425 sq ft · RERA carpet areaMarked unsoldNot stated
104Wing D / Wing NA135.99 sq m≈ 387 sq ft · RERA carpet areaMarked unsoldNot stated
105Wing D / Wing NA148.52 sq m≈ 522 sq ft · RERA carpet areaMarked unsoldNot stated

Read every entry in one table: Read the complete saved unit list.

Choose the unit you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹92,277,785 of an estimated ₹498,948,743 was reported as incurred (18.5%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 19 July 2026 · registration P52100066513

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
Wing DExcavation0.0%
Wing DBasement (if any)0.0%
Wing DPodiums (if any) 0.0%
Wing DPlinth0.0%
Wing DStilt Floor 0.0%
Wing DSlabs of Super Structure0.0%
Wing DInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Wing DSanitary Fittings within the flats / premises0.0%
Wing DStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Wing DExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Wing DInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Wing EExcavation100.0%
Wing EBasement (if any)100.0%
Wing EPodiums (if any) 0.0%
Wing EPlinth0.0%
Wing EStilt Floor 0.0%
Wing ESlabs of Super Structure0.0%
Wing EInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Wing ESanitary Fittings within the flats / premises0.0%
Wing EStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Wing EExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Wing EInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Wing FExcavation100.0%
Wing FBasement (if any)100.0%
Wing FPodiums (if any) 0.0%
Wing FPlinth0.0%
Wing FStilt Floor 0.0%
Wing FSlabs of Super Structure0.0%
Wing FInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Wing FSanitary Fittings within the flats / premises0.0%
Wing FStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Wing FExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Wing FInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Wing GExcavation100.0%
Wing GBasement (if any)100.0%
Wing GPodiums (if any) 100.0%
Wing GPlinth0.0%
Wing GStilt Floor 100.0%
Wing GSlabs of Super Structure80.0%
Wing GInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises12.0%
Wing GSanitary Fittings within the flats / premises0.0%
Wing GStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Wing GExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Wing GInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 19 July 2026 · registration P52100066513

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹0₹0₹498,948,743₹498,948,743
Actual raised₹86,683,975₹0₹13,027,398₹99,711,373

MahaRERA project filing · read 19 July 2026 · registration P52100066513

Quarterly filing record

8 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 19 July 2026 · registration P52100066513

Documents named in the filing

  • Occupancy / completion certificate · 1 listed
  • Promoter PAN · 1 listed
  • Form 3 — CA certificate · 3 listed
  • Form B — Promoter declaration · 1 listed
  • Title / search report · 1 listed
  • Sanctioned building plan · 9 listed
  • Sanctioned layout plan · 1 listed
  • Form 1 — Architect's certificate · 2 listed
  • Form 2 — Engineer's certificate · 2 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100066513

Builder and past records

What else does the record show?

Projects registered under this company

Krrsna Leela Skyscraper LLP

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

    Past records of sales and unsold units

    1. 28 September 2026

      194 marked unsold · 3 sold · 0 booked.

      Saved MahaRERA unit list

    2. 19 September 2026

      194 marked unsold · 3 sold · 0 booked.

      Saved MahaRERA unit list

    3. 11 September 2026

      194 marked unsold · 3 sold · 0 booked.

      Saved MahaRERA unit list

    4. 19 July 2026

      194 marked unsold · 3 sold · 0 booked.

      Saved MahaRERA unit list

    These dates show when the records were saved, not when units were sold. Sales may have changed since then, even if the saved counts are the same.

    Project Comparison Report

    Which project should you buy in?
    And which unit?

    Compare up to three projects. We read their plans and RERA documents, recommend units in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 12 July 2026

    MahaRERA · per-unit inventory · read 11 September 2026

    This is a past RERA unit list, not current availability. It does not give the date each unit was sold.

    Filed area means carpet area for building units and plot area for plots. Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.