homeonpaper.

Builder’s RERA records,
explained for buyers.

The builder’s RERA record, explained

PARK WEST

Infinity Buildcon · P52100079597

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For PARK WEST (P52100079597), 80 of 143 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).

MahaRERA · per-home inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Inside this registered phase

How do the buildings compare in the record?

143 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
Tower 16820402625.27–126.16 sq m≈ 272–1,358 sq ft
Tower 27500403523.97–102.28 sq m≈ 258–1,101 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

143 listed entries

MahaRERA · per-home inventory · saved-file date 18 July 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
Office 101Tower 1132.42 sq m≈ 349 sq ftNot for saleNot stated
Office 102Tower 1136.32 sq m≈ 391 sq ftNot for saleNot stated
Office 103Tower 1136.88 sq m≈ 397 sq ftNot for saleNot stated
Office 104Tower 1149.24 sq m≈ 530 sq ftNot for saleNot stated
Office 105Tower 1135.58 sq m≈ 383 sq ftNot for saleNot stated
Office 106Tower 1125.27 sq m≈ 272 sq ftNot for saleNot stated
Office 107Tower 1147.75 sq m≈ 514 sq ftNot for saleNot stated
Office 108Tower 1144.69 sq m≈ 481 sq ftNot for saleNot stated
Office 109 Tower 1146.45 sq m≈ 500 sq ftNot for saleNot stated
Office 110Tower 1141.53 sq m≈ 447 sq ftNot for saleNot stated
Office 201Tower 1232.42 sq m≈ 349 sq ftMarked unsoldNot stated
Office 202Tower 1236.32 sq m≈ 391 sq ftMarked unsoldNot stated

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹14,102,971 of an estimated ₹279,872,915 was reported as incurred (5.0%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 19 July 2026 · registration P52100079597

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
Tower 1Excavation100.0%
Tower 1Basement (if any)100.0%
Tower 1Podiums (if any) 0.0%
Tower 1Plinth100.0%
Tower 1Stilt Floor 0.0%
Tower 1Slabs of Super Structure60.0%
Tower 1Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10.0%
Tower 1Sanitary Fittings within the flats / premises0.0%
Tower 1Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Tower 1External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Tower 1Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Tower 2Excavation100.0%
Tower 2Basement (if any)100.0%
Tower 2Podiums (if any) 0.0%
Tower 2Plinth100.0%
Tower 2Stilt Floor 0.0%
Tower 2Slabs of Super Structure60.0%
Tower 2Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10.0%
Tower 2Sanitary Fittings within the flats / premises0.0%
Tower 2Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Tower 2External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Tower 2Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 19 July 2026 · registration P52100079597

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹4,050,000₹0₹274,776,959₹298,480,155
Actual raised₹4,050,000₹0₹4,712,800₹35,403,114

MahaRERA project filing · read 19 July 2026 · registration P52100079597

Quarterly filing record

5 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 19 July 2026 · registration P52100079597

Documents named in the filing

  • Sanctioned layout plan · 1 listed
  • Sanctioned building plan · 6 listed
  • Title / search report · 1 listed
  • Form B — Promoter declaration · 1 listed
  • Promoter PAN · 1 listed
  • Occupancy / completion certificate · 2 listed
  • Form 1 — Architect's certificate · 1 listed
  • Form 3 — CA certificate · 1 listed
  • Form 2 — Engineer's certificate · 1 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100079597

Builder and past records

What else does the record show?

Projects registered under this company

Infinity Buildcon

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

    Past records of sales and unsold homes

    1. 28 September 2026

      80 marked unsold · 2 sold · 0 booked.

      Saved MahaRERA home list

    2. 20 September 2026

      80 marked unsold · 2 sold · 0 booked.

      Saved MahaRERA home list

    3. 11 September 2026

      80 marked unsold · 2 sold · 0 booked.

      Saved MahaRERA home list

    4. 19 July 2026

      80 marked unsold · 2 sold · 0 booked.

      Saved MahaRERA home list

    These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

    More projects to explore

    Other projects in this locality.

    These projects list the same locality. They may differ in exact location, home type and price.

    Project Comparison Report

    Which project should you buy in?
    And which home?

    Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 12 July 2026

    MahaRERA · per-home inventory · saved-file date 18 July 2026

    This is a past RERA home list, not current availability. It does not give the date each home was sold.

    The home-list date is based on the saved file’s details.

    Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

    Open MahaRERA · search P52100079597 ↗
    homeonpaper