Buyer’s Report
Understand this project
Find homes to consider, with advice on light, layout, privacy and surroundings.
₹4,999
Builder’s RERA records,
explained for buyers.
The builder’s RERA record, explained
KRUSHNA PARADISE DEVELOPERS · P52100079905
For Rivereast Residency (P52100079905), 165 of 177 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).
MahaRERA · per-home inventory · saved-file date 18 July 2026
For Rivereast Residency, ₹6,109 per sq ft of carpet area is the median rate across 12 sold or booked entries with prices in the MahaRERA home list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.
MahaRERA · per-home inventory · saved-file date 18 July 2026
These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.
Builder’s completion target
The builder reported this target date. It is not a confirmed handover date.
Status shown on RERA
This is the status shown on RERA. It does not confirm an occupancy certificate or today’s construction progress.
Prices reported to RERA
₹6,109/ sq ft carpet area
Across 12 sold or booked entries with reported prices. The middle 80% of rates fall between ₹6,057 and ₹8,836.
MahaRERA · per-home inventory · saved-file date 18 July 2026
For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.
Sales Report
Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.
Inside this registered phase
177 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.
MahaRERA · per-home inventory · saved-file date 18 July 2026
Scroll sideways to see all columns.
| Filed building | Entries | Sold | Booked | Marked unsold | Other / unstated status | Recorded carpet-area range |
|---|---|---|---|---|---|---|
| BUILDING E | 91 | 4 | 4 | 83 | 0 | 29.82–33.48 sq m≈ 321–360 sq ft |
| I BUILDING | 1 | 0 | 0 | 1 | 0 | 10.15 sq m≈ 109 sq ft |
| RH 01 GROUP OF 8 | 7 | 0 | 2 | 5 | 0 | 49.85 sq m≈ 537 sq ft |
| RH 02 GROUP OF 14 | 14 | 0 | 0 | 14 | 0 | 49.85 sq m≈ 537 sq ft |
| RH 03 GROUP OF 14 | 14 | 0 | 0 | 14 | 0 | 49.85–49.95 sq m≈ 537–538 sq ft |
| RH 04 GROUP OF 13 | 13 | 0 | 0 | 13 | 0 | 49.69–49.85 sq m≈ 535–537 sq ft |
| RH 05 GROUP OF 12 | 12 | 0 | 1 | 11 | 0 | 49.85 sq m≈ 537 sq ft |
| RH 06 GROUP OF 10 | 9 | 0 | 0 | 9 | 0 | 49.85 sq m≈ 537 sq ft |
| RH 07 GROUP OF 6 | 6 | 0 | 0 | 6 | 0 | 49.85 sq m≈ 537 sq ft |
| RH 08 GROUP OF 9 | 10 | 0 | 1 | 9 | 0 | 49.85 sq m≈ 537 sq ft |
Different sizes are not necessarily different bedroom types. How we read and summarise the filing →
Unit Report
Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.
Didn’t help you decide? Full refund — no questions asked.
The same home number may appear in more than one building. Check both before choosing.
MahaRERA · per-home inventory · saved-file date 18 July 2026
| Home / building | Floor in the record | Carpet area | Reported status | Agreement value | Assess |
|---|---|---|---|---|---|
| 1001BUILDING E | 10 | 29.98 sq m≈ 323 sq ft | Marked unsold | Not stated | |
| 1002BUILDING E | 10 | 29.85 sq m≈ 321 sq ft | Marked unsold | Not stated | |
| 1003BUILDING E | 10 | 29.85 sq m≈ 321 sq ft | Marked unsold | Not stated | |
| 1004BUILDING E | 10 | 29.97 sq m≈ 323 sq ft | Marked unsold | Not stated | |
| 1005BUILDING E | 10 | 29.82 sq m≈ 321 sq ft | Marked unsold | Not stated | |
| 1006BUILDING E | 10 | 29.85 sq m≈ 321 sq ft | Marked unsold | Not stated | |
| 1007BUILDING E | 10 | 29.85 sq m≈ 321 sq ft | Marked unsold | Not stated | |
| 1008BUILDING E | 10 | 29.82 sq m≈ 321 sq ft | Marked unsold | Not stated | |
| 101BUILDING E | 1 | 29.98 sq m≈ 323 sq ft | Marked unsold | Not stated | |
| 102BUILDING E | 1 | 29.85 sq m≈ 321 sq ft | Marked unsold | Not stated | |
| 103BUILDING E | 1 | 29.85 sq m≈ 321 sq ft | Marked unsold | Not stated | |
| 104BUILDING E | 1 | 29.97 sq m≈ 323 sq ft | Marked unsold | Not stated |
Read every entry in one table: Read the complete saved home list.
Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.
More from the RERA documents
₹22,315,772 of an estimated ₹320,000,001 was reported as incurred (7.0%). This percentage is about costs. It does not show how much construction is complete.
MahaRERA project filing · read 19 July 2026 · registration P52100079905
Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.
| Building | Activity | Reported |
|---|---|---|
| RH 08 GROUP OF 9 | Excavation | 100.0% |
| RH 08 GROUP OF 9 | Basement (if any) | 0.0% |
| RH 08 GROUP OF 9 | Podiums (if any) | 0.0% |
| RH 08 GROUP OF 9 | Plinth | 100.0% |
| RH 08 GROUP OF 9 | Stilt Floor | 0.0% |
| RH 08 GROUP OF 9 | Slabs of Super Structure | 0.0% |
| RH 08 GROUP OF 9 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| RH 08 GROUP OF 9 | Sanitary Fittings within the flats / premises | 50.0% |
| RH 08 GROUP OF 9 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80.0% |
| RH 08 GROUP OF 9 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50.0% |
| RH 08 GROUP OF 9 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| BUILDING E | Excavation | 100.0% |
| BUILDING E | Basement (if any) | 0.0% |
| BUILDING E | Podiums (if any) | 0.0% |
| BUILDING E | Plinth | 100.0% |
| BUILDING E | Stilt Floor | 0.0% |
| BUILDING E | Slabs of Super Structure | 0.0% |
| BUILDING E | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUILDING E | Sanitary Fittings within the flats / premises | 50.0% |
| BUILDING E | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80.0% |
| BUILDING E | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50.0% |
| BUILDING E | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| RH 01 GROUP OF 8 | Excavation | 100.0% |
| RH 01 GROUP OF 8 | Basement (if any) | 0.0% |
| RH 01 GROUP OF 8 | Podiums (if any) | 0.0% |
| RH 01 GROUP OF 8 | Plinth | 100.0% |
| RH 01 GROUP OF 8 | Stilt Floor | 0.0% |
| RH 01 GROUP OF 8 | Slabs of Super Structure | 0.0% |
| RH 01 GROUP OF 8 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| RH 01 GROUP OF 8 | Sanitary Fittings within the flats / premises | 50.0% |
| RH 01 GROUP OF 8 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80.0% |
| RH 01 GROUP OF 8 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50.0% |
| RH 01 GROUP OF 8 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| RH 02 GROUP OF 14 | Excavation | 100.0% |
| RH 02 GROUP OF 14 | Basement (if any) | 0.0% |
| RH 02 GROUP OF 14 | Podiums (if any) | 0.0% |
| RH 02 GROUP OF 14 | Plinth | 100.0% |
| RH 02 GROUP OF 14 | Stilt Floor | 0.0% |
| RH 02 GROUP OF 14 | Slabs of Super Structure | 0.0% |
| RH 02 GROUP OF 14 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| RH 02 GROUP OF 14 | Sanitary Fittings within the flats / premises | 50.0% |
| RH 02 GROUP OF 14 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80.0% |
| RH 02 GROUP OF 14 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50.0% |
| RH 02 GROUP OF 14 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| RH 03 GROUP OF 14 | Excavation | 100.0% |
| RH 03 GROUP OF 14 | Basement (if any) | 0.0% |
| RH 03 GROUP OF 14 | Podiums (if any) | 0.0% |
| RH 03 GROUP OF 14 | Plinth | 100.0% |
| RH 03 GROUP OF 14 | Stilt Floor | 0.0% |
| RH 03 GROUP OF 14 | Slabs of Super Structure | 0.0% |
| RH 03 GROUP OF 14 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| RH 03 GROUP OF 14 | Sanitary Fittings within the flats / premises | 50.0% |
| RH 03 GROUP OF 14 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80.0% |
| RH 03 GROUP OF 14 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50.0% |
| RH 03 GROUP OF 14 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| RH 04 GROUP OF 13 | Excavation | 100.0% |
| RH 04 GROUP OF 13 | Basement (if any) | 0.0% |
| RH 04 GROUP OF 13 | Podiums (if any) | 0.0% |
| RH 04 GROUP OF 13 | Plinth | 100.0% |
| RH 04 GROUP OF 13 | Stilt Floor | 0.0% |
| RH 04 GROUP OF 13 | Slabs of Super Structure | 0.0% |
| RH 04 GROUP OF 13 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| RH 04 GROUP OF 13 | Sanitary Fittings within the flats / premises | 50.0% |
| RH 04 GROUP OF 13 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80.0% |
| RH 04 GROUP OF 13 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50.0% |
| RH 04 GROUP OF 13 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| RH 05 GROUP OF 12 | Excavation | 100.0% |
| RH 05 GROUP OF 12 | Basement (if any) | 0.0% |
| RH 05 GROUP OF 12 | Podiums (if any) | 0.0% |
| RH 05 GROUP OF 12 | Plinth | 100.0% |
| RH 05 GROUP OF 12 | Stilt Floor | 0.0% |
| RH 05 GROUP OF 12 | Slabs of Super Structure | 0.0% |
| RH 05 GROUP OF 12 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| RH 05 GROUP OF 12 | Sanitary Fittings within the flats / premises | 50.0% |
| RH 05 GROUP OF 12 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80.0% |
| RH 05 GROUP OF 12 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50.0% |
| RH 05 GROUP OF 12 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| RH 06 GROUP OF 10 | Excavation | 100.0% |
| RH 06 GROUP OF 10 | Basement (if any) | 0.0% |
| RH 06 GROUP OF 10 | Podiums (if any) | 0.0% |
| RH 06 GROUP OF 10 | Plinth | 100.0% |
| RH 06 GROUP OF 10 | Stilt Floor | 0.0% |
| RH 06 GROUP OF 10 | Slabs of Super Structure | 0.0% |
| RH 06 GROUP OF 10 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| RH 06 GROUP OF 10 | Sanitary Fittings within the flats / premises | 50.0% |
| RH 06 GROUP OF 10 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80.0% |
| RH 06 GROUP OF 10 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50.0% |
| RH 06 GROUP OF 10 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| RH 07 GROUP OF 6 | Excavation | 100.0% |
| RH 07 GROUP OF 6 | Basement (if any) | 0.0% |
| RH 07 GROUP OF 6 | Podiums (if any) | 0.0% |
| RH 07 GROUP OF 6 | Plinth | 100.0% |
| RH 07 GROUP OF 6 | Stilt Floor | 0.0% |
| RH 07 GROUP OF 6 | Slabs of Super Structure | 0.0% |
| RH 07 GROUP OF 6 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| RH 07 GROUP OF 6 | Sanitary Fittings within the flats / premises | 50.0% |
| RH 07 GROUP OF 6 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80.0% |
| RH 07 GROUP OF 6 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50.0% |
| RH 07 GROUP OF 6 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| I BUILDING | Excavation | 100.0% |
| I BUILDING | Plinth | 100.0% |
| I BUILDING | Slabs of Super Structure | 0.0% |
| I BUILDING | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| I BUILDING | Sanitary Fittings within the flats / premises | 50.0% |
| I BUILDING | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80.0% |
| I BUILDING | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50.0% |
| I BUILDING | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
MahaRERA project filing · read 19 July 2026 · registration P52100079905
RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.
| Filing | Own funds | Borrowing | Payments from buyers | Total |
|---|---|---|---|---|
| Estimated plan | ₹84,390,244 | ₹0 | ₹310,632,812 | ₹395,023,056 |
| Actual raised | ₹96,321,379 | ₹0 | ₹392,000 | ₹96,713,379 |
MahaRERA project filing · read 19 July 2026 · registration P52100079905
5 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.
MahaRERA project filing · read 19 July 2026 · registration P52100079905
A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.
MahaRERA project filing · read 19 July 2026 · registration P52100079905
Builder and past records
Projects registered under this company
1Pune registrations
These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.
MahaRERA Pune registration records · read 12 July 2026
Past records of sales and unsold homes
20 September 2026
165 marked unsold · 4 sold · 8 booked.
Saved MahaRERA home list
11 September 2026
165 marked unsold · 4 sold · 8 booked.
Saved MahaRERA home list
19 July 2026
165 marked unsold · 4 sold · 8 booked.
Saved MahaRERA home list
18 July 2026
165 marked unsold · 4 sold · 8 booked.
Saved MahaRERA home list, date based on the saved file
These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.
More projects to explore
These projects list the same locality. They may differ in exact location, home type and price.
Dehu · Pune
P52100054288
144 of 146 entries marked unsold
MahaRERA · per-home inventory · saved-file date 18 July 2026
View project details →Dehu · Pune
P52100051724
74 of 112 entries marked unsold
MahaRERA · per-home inventory · saved-file date 18 July 2026
View project details →Dehu · Pune
P52100049477
164 of 190 entries marked unsold
MahaRERA · per-home inventory · saved-file date 18 July 2026
View project details →Project Comparison Report
Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.
2 projects · ₹7,999
3 projects · ₹9,999
Within 1 working day
Didn’t help you decide? Full refund — no questions asked.
Compare project details for free →MahaRERA · registration record · read 12 July 2026
MahaRERA · per-home inventory · saved-file date 18 July 2026
This is a past RERA home list, not current availability. It does not give the date each home was sold.
The home-list date is based on the saved file’s details.
Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.
Open MahaRERA · search P52100079905 ↗