Buyer’s Report
Understand this project
Find units to consider, with advice on light, layout, privacy and surroundings.
₹4,999
Builder’s RERA records,
explained for buyers.
The builder’s RERA record, explained
KRUSHNA PARADISE DEVELOPERS · P52100079905
For Rivereast Residency (P52100079905), 165 of 177 entries were marked unsold in the MahaRERA unit list dated 18 July 2026 (saved-file date).
MahaRERA · per-unit inventory · saved-file date 18 July 2026
For Rivereast Residency, ₹6,109 per sq ft of filed area is the median rate across 12 sold or booked entries with prices in the MahaRERA unit list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.
MahaRERA · per-unit inventory · saved-file date 18 July 2026
These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.
Builder’s completion target
The builder reported this target date. It is not a confirmed handover date.
Status shown on RERA
This is the status shown on RERA. It does not confirm an occupancy certificate or today’s construction progress.
Prices reported to RERA
₹6,109/ sq ft filed area
Across 12 sold or booked entries with reported prices. The middle 80% of rates fall between ₹6,057 and ₹8,836.
MahaRERA · per-unit inventory · saved-file date 18 July 2026
For each sold or booked entry, we divide the reported agreement value by its filed area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold units and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.
Sales Report
Compare filed values by building, unit-number pattern and area. See which units were marked unsold on the date shown.
Inside this registered phase
177 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.
MahaRERA · per-unit inventory · saved-file date 18 July 2026
Scroll sideways to see all columns.
| Filed building | Entries | Sold | Booked | Marked unsold | Other / unstated status | Recorded filed-area range |
|---|---|---|---|---|---|---|
| BUILDING E | 91 | 4 | 4 | 83 | 0 | 29.82–33.48 sq m≈ 321–360 sq ft |
| I BUILDING | 1 | 0 | 0 | 1 | 0 | 10.15 sq m≈ 109 sq ft |
| RH 01 GROUP OF 8 | 7 | 0 | 2 | 5 | 0 | 49.85 sq m≈ 537 sq ft |
| RH 02 GROUP OF 14 | 14 | 0 | 0 | 14 | 0 | 49.85 sq m≈ 537 sq ft |
| RH 03 GROUP OF 14 | 14 | 0 | 0 | 14 | 0 | 49.85–49.95 sq m≈ 537–538 sq ft |
| RH 04 GROUP OF 13 | 13 | 0 | 0 | 13 | 0 | 49.69–49.85 sq m≈ 535–537 sq ft |
| RH 05 GROUP OF 12 | 12 | 0 | 1 | 11 | 0 | 49.85 sq m≈ 537 sq ft |
| RH 06 GROUP OF 10 | 9 | 0 | 0 | 9 | 0 | 49.85 sq m≈ 537 sq ft |
| RH 07 GROUP OF 6 | 6 | 0 | 0 | 6 | 0 | 49.85 sq m≈ 537 sq ft |
| RH 08 GROUP OF 9 | 10 | 0 | 1 | 9 | 0 | 49.85 sq m≈ 537 sq ft |
Area means carpet area for building units and plot area for plots. Size alone does not establish use or layout. How we read and summarise the filing →
Unit Report
Understand its light, privacy, layout and surroundings. See how it compares with similar units and other options in this project.
Didn’t help you decide? Full refund — no questions asked.
The same unit number may appear in more than one building. Check both before choosing.
MahaRERA · per-unit inventory · saved-file date 18 July 2026
| Unit / building | Floor in the record | Filed area | Reported status | Agreement value | Assess |
|---|---|---|---|---|---|
| 1001BUILDING E / Wing NA | 10 | 29.98 sq m≈ 323 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 1002BUILDING E / Wing NA | 10 | 29.85 sq m≈ 321 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 1003BUILDING E / Wing NA | 10 | 29.85 sq m≈ 321 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 1004BUILDING E / Wing NA | 10 | 29.97 sq m≈ 323 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 1005BUILDING E / Wing NA | 10 | 29.82 sq m≈ 321 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 1006BUILDING E / Wing NA | 10 | 29.85 sq m≈ 321 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 1007BUILDING E / Wing NA | 10 | 29.85 sq m≈ 321 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 1008BUILDING E / Wing NA | 10 | 29.82 sq m≈ 321 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 101BUILDING E / Wing NA | 1 | 29.98 sq m≈ 323 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 102BUILDING E / Wing NA | 1 | 29.85 sq m≈ 321 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 103BUILDING E / Wing NA | 1 | 29.85 sq m≈ 321 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 104BUILDING E / Wing NA | 1 | 29.97 sq m≈ 323 sq ft · RERA carpet area | Marked unsold | Not stated |
Read every entry in one table: Read the complete saved unit list.
Choose the unit you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.
More from the RERA documents
₹22,315,772 of an estimated ₹320,000,001 was reported as incurred (7.0%). This percentage is about costs. It does not show how much construction is complete.
MahaRERA project filing · read 19 July 2026 · registration P52100079905
Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.
| Building | Activity | Reported |
|---|---|---|
| RH 08 GROUP OF 9 | Excavation | 100.0% |
| RH 08 GROUP OF 9 | Basement (if any) | 0.0% |
| RH 08 GROUP OF 9 | Podiums (if any) | 0.0% |
| RH 08 GROUP OF 9 | Plinth | 100.0% |
| RH 08 GROUP OF 9 | Stilt Floor | 0.0% |
| RH 08 GROUP OF 9 | Slabs of Super Structure | 0.0% |
| RH 08 GROUP OF 9 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| RH 08 GROUP OF 9 | Sanitary Fittings within the flats / premises | 50.0% |
| RH 08 GROUP OF 9 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80.0% |
| RH 08 GROUP OF 9 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50.0% |
| RH 08 GROUP OF 9 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| BUILDING E | Excavation | 100.0% |
| BUILDING E | Basement (if any) | 0.0% |
| BUILDING E | Podiums (if any) | 0.0% |
| BUILDING E | Plinth | 100.0% |
| BUILDING E | Stilt Floor | 0.0% |
| BUILDING E | Slabs of Super Structure | 0.0% |
| BUILDING E | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUILDING E | Sanitary Fittings within the flats / premises | 50.0% |
| BUILDING E | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80.0% |
| BUILDING E | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50.0% |
| BUILDING E | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| RH 01 GROUP OF 8 | Excavation | 100.0% |
| RH 01 GROUP OF 8 | Basement (if any) | 0.0% |
| RH 01 GROUP OF 8 | Podiums (if any) | 0.0% |
| RH 01 GROUP OF 8 | Plinth | 100.0% |
| RH 01 GROUP OF 8 | Stilt Floor | 0.0% |
| RH 01 GROUP OF 8 | Slabs of Super Structure | 0.0% |
| RH 01 GROUP OF 8 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| RH 01 GROUP OF 8 | Sanitary Fittings within the flats / premises | 50.0% |
| RH 01 GROUP OF 8 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80.0% |
| RH 01 GROUP OF 8 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50.0% |
| RH 01 GROUP OF 8 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| RH 02 GROUP OF 14 | Excavation | 100.0% |
| RH 02 GROUP OF 14 | Basement (if any) | 0.0% |
| RH 02 GROUP OF 14 | Podiums (if any) | 0.0% |
| RH 02 GROUP OF 14 | Plinth | 100.0% |
| RH 02 GROUP OF 14 | Stilt Floor | 0.0% |
| RH 02 GROUP OF 14 | Slabs of Super Structure | 0.0% |
| RH 02 GROUP OF 14 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| RH 02 GROUP OF 14 | Sanitary Fittings within the flats / premises | 50.0% |
| RH 02 GROUP OF 14 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80.0% |
| RH 02 GROUP OF 14 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50.0% |
| RH 02 GROUP OF 14 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| RH 03 GROUP OF 14 | Excavation | 100.0% |
| RH 03 GROUP OF 14 | Basement (if any) | 0.0% |
| RH 03 GROUP OF 14 | Podiums (if any) | 0.0% |
| RH 03 GROUP OF 14 | Plinth | 100.0% |
| RH 03 GROUP OF 14 | Stilt Floor | 0.0% |
| RH 03 GROUP OF 14 | Slabs of Super Structure | 0.0% |
| RH 03 GROUP OF 14 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| RH 03 GROUP OF 14 | Sanitary Fittings within the flats / premises | 50.0% |
| RH 03 GROUP OF 14 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80.0% |
| RH 03 GROUP OF 14 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50.0% |
| RH 03 GROUP OF 14 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| RH 04 GROUP OF 13 | Excavation | 100.0% |
| RH 04 GROUP OF 13 | Basement (if any) | 0.0% |
| RH 04 GROUP OF 13 | Podiums (if any) | 0.0% |
| RH 04 GROUP OF 13 | Plinth | 100.0% |
| RH 04 GROUP OF 13 | Stilt Floor | 0.0% |
| RH 04 GROUP OF 13 | Slabs of Super Structure | 0.0% |
| RH 04 GROUP OF 13 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| RH 04 GROUP OF 13 | Sanitary Fittings within the flats / premises | 50.0% |
| RH 04 GROUP OF 13 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80.0% |
| RH 04 GROUP OF 13 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50.0% |
| RH 04 GROUP OF 13 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| RH 05 GROUP OF 12 | Excavation | 100.0% |
| RH 05 GROUP OF 12 | Basement (if any) | 0.0% |
| RH 05 GROUP OF 12 | Podiums (if any) | 0.0% |
| RH 05 GROUP OF 12 | Plinth | 100.0% |
| RH 05 GROUP OF 12 | Stilt Floor | 0.0% |
| RH 05 GROUP OF 12 | Slabs of Super Structure | 0.0% |
| RH 05 GROUP OF 12 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| RH 05 GROUP OF 12 | Sanitary Fittings within the flats / premises | 50.0% |
| RH 05 GROUP OF 12 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80.0% |
| RH 05 GROUP OF 12 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50.0% |
| RH 05 GROUP OF 12 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| RH 06 GROUP OF 10 | Excavation | 100.0% |
| RH 06 GROUP OF 10 | Basement (if any) | 0.0% |
| RH 06 GROUP OF 10 | Podiums (if any) | 0.0% |
| RH 06 GROUP OF 10 | Plinth | 100.0% |
| RH 06 GROUP OF 10 | Stilt Floor | 0.0% |
| RH 06 GROUP OF 10 | Slabs of Super Structure | 0.0% |
| RH 06 GROUP OF 10 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| RH 06 GROUP OF 10 | Sanitary Fittings within the flats / premises | 50.0% |
| RH 06 GROUP OF 10 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80.0% |
| RH 06 GROUP OF 10 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50.0% |
| RH 06 GROUP OF 10 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| RH 07 GROUP OF 6 | Excavation | 100.0% |
| RH 07 GROUP OF 6 | Basement (if any) | 0.0% |
| RH 07 GROUP OF 6 | Podiums (if any) | 0.0% |
| RH 07 GROUP OF 6 | Plinth | 100.0% |
| RH 07 GROUP OF 6 | Stilt Floor | 0.0% |
| RH 07 GROUP OF 6 | Slabs of Super Structure | 0.0% |
| RH 07 GROUP OF 6 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| RH 07 GROUP OF 6 | Sanitary Fittings within the flats / premises | 50.0% |
| RH 07 GROUP OF 6 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80.0% |
| RH 07 GROUP OF 6 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50.0% |
| RH 07 GROUP OF 6 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| I BUILDING | Excavation | 100.0% |
| I BUILDING | Plinth | 100.0% |
| I BUILDING | Slabs of Super Structure | 0.0% |
| I BUILDING | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| I BUILDING | Sanitary Fittings within the flats / premises | 50.0% |
| I BUILDING | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80.0% |
| I BUILDING | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50.0% |
| I BUILDING | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
MahaRERA project filing · read 19 July 2026 · registration P52100079905
RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.
| Filing | Own funds | Borrowing | Payments from buyers | Total |
|---|---|---|---|---|
| Estimated plan | ₹84,390,244 | ₹0 | ₹310,632,812 | ₹395,023,056 |
| Actual raised | ₹96,321,379 | ₹0 | ₹392,000 | ₹96,713,379 |
MahaRERA project filing · read 19 July 2026 · registration P52100079905
5 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.
MahaRERA project filing · read 19 July 2026 · registration P52100079905
A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.
MahaRERA project filing · read 19 July 2026 · registration P52100079905
Builder and past records
Projects registered under this company
1Pune registrations
These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.
MahaRERA Pune registration records · read 12 July 2026
Past records of sales and unsold units
29 September 2026
165 marked unsold · 4 sold · 8 booked.
Saved MahaRERA unit list
20 September 2026
165 marked unsold · 4 sold · 8 booked.
Saved MahaRERA unit list
11 September 2026
165 marked unsold · 4 sold · 8 booked.
Saved MahaRERA unit list
19 July 2026
165 marked unsold · 4 sold · 8 booked.
Saved MahaRERA unit list
These dates show when the records were saved, not when units were sold. Sales may have changed since then, even if the saved counts are the same.
More projects to explore
These projects list the same locality. They may differ in exact location, property type and price.
Dehu · Pune
P52100054288
144 of 146 entries marked unsold
MahaRERA · per-unit inventory · saved-file date 18 July 2026
View project details →Dehu · Pune
P52100051724
74 of 112 entries marked unsold
MahaRERA · per-unit inventory · saved-file date 18 July 2026
View project details →Dehu · Pune
P52100049477
164 of 190 entries marked unsold
MahaRERA · per-unit inventory · saved-file date 18 July 2026
View project details →Project Comparison Report
Compare up to three projects. We read their plans and RERA documents, recommend units in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.
2 projects · ₹7,999
3 projects · ₹9,999
Within 1 working day
Didn’t help you decide? Full refund — no questions asked.
Compare project details for free →MahaRERA · registration record · read 12 July 2026
MahaRERA · per-unit inventory · saved-file date 18 July 2026
This is a past RERA unit list, not current availability. It does not give the date each unit was sold.
The unit-list date is based on the saved file’s details.
Filed area means carpet area for building units and plot area for plots. Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.
Open MahaRERA · search P52100079905 ↗