What does the RERA record show?

For Rivereast Residency (P52100079905), 165 of 177 entries were marked unsold in the MahaRERA unit list dated 18 July 2026 (saved-file date).

MahaRERA · per-unit inventory · saved-file date 18 July 2026

For Rivereast Residency, ₹6,109 per sq ft of filed area is the median rate across 12 sold or booked entries with prices in the MahaRERA unit list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.

MahaRERA · per-unit inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find units to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular unit

See its advantages, drawbacks and how it compares with other units in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended units in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹6,109/ sq ft filed area

Across 12 sold or booked entries with reported prices. The middle 80% of rates fall between ₹6,057 and ₹8,836.

MahaRERA · per-unit inventory · saved-file date 18 July 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its filed area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold units and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar units sell for?

Compare filed values by building, unit-number pattern and area. See which units were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

177 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-unit inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and filed areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded filed-area range
BUILDING E914483029.82–33.48 sq m≈ 321–360 sq ft
I BUILDING1001010.15 sq m≈ 109 sq ft
RH 01 GROUP OF 87025049.85 sq m≈ 537 sq ft
RH 02 GROUP OF 14140014049.85 sq m≈ 537 sq ft
RH 03 GROUP OF 14140014049.85–49.95 sq m≈ 537–538 sq ft
RH 04 GROUP OF 13130013049.69–49.85 sq m≈ 535–537 sq ft
RH 05 GROUP OF 12120111049.85 sq m≈ 537 sq ft
RH 06 GROUP OF 109009049.85 sq m≈ 537 sq ft
RH 07 GROUP OF 66006049.85 sq m≈ 537 sq ft
RH 08 GROUP OF 910019049.85 sq m≈ 537 sq ft

Area means carpet area for building units and plot area for plots. Size alone does not establish use or layout. How we read and summarise the filing →

Unit Report

Is this the right
unit for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar units and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your unit in the RERA list.

The same unit number may appear in more than one building. Check both before choosing.

177 listed entries

MahaRERA · per-unit inventory · saved-file date 18 July 2026

RERA unit list, not current availability
Unit / buildingFloor in the recordFiled areaReported statusAgreement valueAssess
1001BUILDING E / Wing NA1029.98 sq m≈ 323 sq ft · RERA carpet areaMarked unsoldNot stated
1002BUILDING E / Wing NA1029.85 sq m≈ 321 sq ft · RERA carpet areaMarked unsoldNot stated
1003BUILDING E / Wing NA1029.85 sq m≈ 321 sq ft · RERA carpet areaMarked unsoldNot stated
1004BUILDING E / Wing NA1029.97 sq m≈ 323 sq ft · RERA carpet areaMarked unsoldNot stated
1005BUILDING E / Wing NA1029.82 sq m≈ 321 sq ft · RERA carpet areaMarked unsoldNot stated
1006BUILDING E / Wing NA1029.85 sq m≈ 321 sq ft · RERA carpet areaMarked unsoldNot stated
1007BUILDING E / Wing NA1029.85 sq m≈ 321 sq ft · RERA carpet areaMarked unsoldNot stated
1008BUILDING E / Wing NA1029.82 sq m≈ 321 sq ft · RERA carpet areaMarked unsoldNot stated
101BUILDING E / Wing NA129.98 sq m≈ 323 sq ft · RERA carpet areaMarked unsoldNot stated
102BUILDING E / Wing NA129.85 sq m≈ 321 sq ft · RERA carpet areaMarked unsoldNot stated
103BUILDING E / Wing NA129.85 sq m≈ 321 sq ft · RERA carpet areaMarked unsoldNot stated
104BUILDING E / Wing NA129.97 sq m≈ 323 sq ft · RERA carpet areaMarked unsoldNot stated

Read every entry in one table: Read the complete saved unit list.

Choose the unit you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹22,315,772 of an estimated ₹320,000,001 was reported as incurred (7.0%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 19 July 2026 · registration P52100079905

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
RH 08 GROUP OF 9Excavation100.0%
RH 08 GROUP OF 9Basement (if any)0.0%
RH 08 GROUP OF 9Podiums (if any) 0.0%
RH 08 GROUP OF 9Plinth100.0%
RH 08 GROUP OF 9Stilt Floor 0.0%
RH 08 GROUP OF 9Slabs of Super Structure0.0%
RH 08 GROUP OF 9Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
RH 08 GROUP OF 9Sanitary Fittings within the flats / premises50.0%
RH 08 GROUP OF 9Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80.0%
RH 08 GROUP OF 9External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50.0%
RH 08 GROUP OF 9Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50.0%
BUILDING EExcavation100.0%
BUILDING EBasement (if any)0.0%
BUILDING EPodiums (if any) 0.0%
BUILDING EPlinth100.0%
BUILDING EStilt Floor 0.0%
BUILDING ESlabs of Super Structure0.0%
BUILDING EInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUILDING ESanitary Fittings within the flats / premises50.0%
BUILDING EStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80.0%
BUILDING EExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50.0%
BUILDING EInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50.0%
RH 01 GROUP OF 8Excavation100.0%
RH 01 GROUP OF 8Basement (if any)0.0%
RH 01 GROUP OF 8Podiums (if any) 0.0%
RH 01 GROUP OF 8Plinth100.0%
RH 01 GROUP OF 8Stilt Floor 0.0%
RH 01 GROUP OF 8Slabs of Super Structure0.0%
RH 01 GROUP OF 8Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
RH 01 GROUP OF 8Sanitary Fittings within the flats / premises50.0%
RH 01 GROUP OF 8Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80.0%
RH 01 GROUP OF 8External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50.0%
RH 01 GROUP OF 8Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50.0%
RH 02 GROUP OF 14Excavation100.0%
RH 02 GROUP OF 14Basement (if any)0.0%
RH 02 GROUP OF 14Podiums (if any) 0.0%
RH 02 GROUP OF 14Plinth100.0%
RH 02 GROUP OF 14Stilt Floor 0.0%
RH 02 GROUP OF 14Slabs of Super Structure0.0%
RH 02 GROUP OF 14Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
RH 02 GROUP OF 14Sanitary Fittings within the flats / premises50.0%
RH 02 GROUP OF 14Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80.0%
RH 02 GROUP OF 14External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50.0%
RH 02 GROUP OF 14Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50.0%
RH 03 GROUP OF 14Excavation100.0%
RH 03 GROUP OF 14Basement (if any)0.0%
RH 03 GROUP OF 14Podiums (if any) 0.0%
RH 03 GROUP OF 14Plinth100.0%
RH 03 GROUP OF 14Stilt Floor 0.0%
RH 03 GROUP OF 14Slabs of Super Structure0.0%
RH 03 GROUP OF 14Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
RH 03 GROUP OF 14Sanitary Fittings within the flats / premises50.0%
RH 03 GROUP OF 14Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80.0%
RH 03 GROUP OF 14External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50.0%
RH 03 GROUP OF 14Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50.0%
RH 04 GROUP OF 13Excavation100.0%
RH 04 GROUP OF 13Basement (if any)0.0%
RH 04 GROUP OF 13Podiums (if any) 0.0%
RH 04 GROUP OF 13Plinth100.0%
RH 04 GROUP OF 13Stilt Floor 0.0%
RH 04 GROUP OF 13Slabs of Super Structure0.0%
RH 04 GROUP OF 13Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
RH 04 GROUP OF 13Sanitary Fittings within the flats / premises50.0%
RH 04 GROUP OF 13Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80.0%
RH 04 GROUP OF 13External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50.0%
RH 04 GROUP OF 13Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50.0%
RH 05 GROUP OF 12Excavation100.0%
RH 05 GROUP OF 12Basement (if any)0.0%
RH 05 GROUP OF 12Podiums (if any) 0.0%
RH 05 GROUP OF 12Plinth100.0%
RH 05 GROUP OF 12Stilt Floor 0.0%
RH 05 GROUP OF 12Slabs of Super Structure0.0%
RH 05 GROUP OF 12Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
RH 05 GROUP OF 12Sanitary Fittings within the flats / premises50.0%
RH 05 GROUP OF 12Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80.0%
RH 05 GROUP OF 12External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50.0%
RH 05 GROUP OF 12Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50.0%
RH 06 GROUP OF 10Excavation100.0%
RH 06 GROUP OF 10Basement (if any)0.0%
RH 06 GROUP OF 10Podiums (if any) 0.0%
RH 06 GROUP OF 10Plinth100.0%
RH 06 GROUP OF 10Stilt Floor 0.0%
RH 06 GROUP OF 10Slabs of Super Structure0.0%
RH 06 GROUP OF 10Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
RH 06 GROUP OF 10Sanitary Fittings within the flats / premises50.0%
RH 06 GROUP OF 10Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80.0%
RH 06 GROUP OF 10External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50.0%
RH 06 GROUP OF 10Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50.0%
RH 07 GROUP OF 6Excavation100.0%
RH 07 GROUP OF 6Basement (if any)0.0%
RH 07 GROUP OF 6Podiums (if any) 0.0%
RH 07 GROUP OF 6Plinth100.0%
RH 07 GROUP OF 6Stilt Floor 0.0%
RH 07 GROUP OF 6Slabs of Super Structure0.0%
RH 07 GROUP OF 6Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
RH 07 GROUP OF 6Sanitary Fittings within the flats / premises50.0%
RH 07 GROUP OF 6Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80.0%
RH 07 GROUP OF 6External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50.0%
RH 07 GROUP OF 6Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50.0%
I BUILDINGExcavation100.0%
I BUILDINGPlinth100.0%
I BUILDINGSlabs of Super Structure0.0%
I BUILDINGInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
I BUILDINGSanitary Fittings within the flats / premises50.0%
I BUILDINGStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80.0%
I BUILDINGExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50.0%
I BUILDINGInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50.0%

MahaRERA project filing · read 19 July 2026 · registration P52100079905

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹84,390,244₹0₹310,632,812₹395,023,056
Actual raised₹96,321,379₹0₹392,000₹96,713,379

MahaRERA project filing · read 19 July 2026 · registration P52100079905

Quarterly filing record

5 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 19 July 2026 · registration P52100079905

Documents named in the filing

  • Sanctioned layout plan · 6 listed
  • Sanctioned building plan · 4 listed
  • Title / search report · 1 listed
  • Form B — Promoter declaration · 1 listed
  • Promoter PAN · 1 listed
  • Commencement certificate · 5 listed
  • Occupancy / completion certificate · 1 listed
  • Form 1 — Architect's certificate · 1 listed
  • Form 3 — CA certificate · 1 listed
  • Form 2 — Engineer's certificate · 1 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100079905

Builder and past records

What else does the record show?

Projects registered under this company

KRUSHNA PARADISE DEVELOPERS

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

    Past records of sales and unsold units

    1. 29 September 2026

      165 marked unsold · 4 sold · 8 booked.

      Saved MahaRERA unit list

    2. 20 September 2026

      165 marked unsold · 4 sold · 8 booked.

      Saved MahaRERA unit list

    3. 11 September 2026

      165 marked unsold · 4 sold · 8 booked.

      Saved MahaRERA unit list

    4. 19 July 2026

      165 marked unsold · 4 sold · 8 booked.

      Saved MahaRERA unit list

    These dates show when the records were saved, not when units were sold. Sales may have changed since then, even if the saved counts are the same.

    More projects to explore

    Other projects in this locality.

    These projects list the same locality. They may differ in exact location, property type and price.

    Project Comparison Report

    Which project should you buy in?
    And which unit?

    Compare up to three projects. We read their plans and RERA documents, recommend units in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 12 July 2026

    MahaRERA · per-unit inventory · saved-file date 18 July 2026

    This is a past RERA unit list, not current availability. It does not give the date each unit was sold.

    The unit-list date is based on the saved file’s details.

    Filed area means carpet area for building units and plot area for plots. Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

    Open MahaRERA · search P52100079905 ↗
    homeonpaper