The builder’s RERA record, explained

K K TATHASTU

Vrunda Skyscrapers · P52100080148

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For K K TATHASTU (P52100080148), 272 of 455 entries were marked unsold in the MahaRERA home list read 11 September 2026.

MahaRERA · per-home inventory · read 11 September 2026

For K K TATHASTU, ₹6,708 per sq ft of carpet area is the median rate across 183 sold or booked entries with prices in the MahaRERA home list read 11 September 2026. These are historical agreement values, not current asking prices.

MahaRERA · per-home inventory · read 11 September 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹6,708/ sq ft carpet area

Across 183 sold or booked entries with reported prices. The middle 80% of rates fall between ₹5,105 and ₹8,366.

MahaRERA · per-home inventory · read 11 September 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar homes sell for?

Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

455 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · read 11 September 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
BUILDING C226666595062.31–79.18 sq m≈ 671–852 sq ft
BUILDING D2261636174049.00–62.97 sq m≈ 527–678 sq ft
Building E3003022.10–22.45 sq m≈ 238–242 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

455 listed entries

MahaRERA · per-home inventory · read 11 September 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
1001BUILDING C1079.18 sq m≈ 852 sq ftBooked₹7,132,750
1002BUILDING C1062.31 sq m≈ 671 sq ftMarked unsoldNot stated
1003BUILDING C1062.31 sq m≈ 671 sq ftSold₹4,497,600
1004BUILDING C1062.31 sq m≈ 671 sq ftBooked₹5,267,600
1005BUILDING C1079.18 sq m≈ 852 sq ftSold₹6,430,540
1006BUILDING C1079.18 sq m≈ 852 sq ftMarked unsoldNot stated
1007BUILDING C1063.59 sq m≈ 684 sq ftSold₹5,459,364
1008BUILDING C1063.59 sq m≈ 684 sq ftSold₹5,459,364
1009BUILDING C1063.59 sq m≈ 684 sq ftSold₹4,499,364
101BUILDING C179.18 sq m≈ 852 sq ftMarked unsoldNot stated
1010BUILDING C1079.18 sq m≈ 852 sq ftBooked₹6,077,350
102BUILDING C162.31 sq m≈ 671 sq ftMarked unsoldNot stated

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹57,518,188 of an estimated ₹1,450,000,000 was reported as incurred (4.0%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 19 July 2026 · registration P52100080148

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
Building EExcavation0.0%
Building EBasement (if any)0.0%
Building EPodiums (if any) 0.0%
Building EPlinth0.0%
Building EStilt Floor 0.0%
Building ESlabs of Super Structure0.0%
Building EInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Building ESanitary Fittings within the flats / premises0.0%
Building EStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Building EExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Building EInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUILDING FExcavation0.0%
BUILDING FBasement (if any)0.0%
BUILDING FPodiums (if any) 0.0%
BUILDING FPlinth0.0%
BUILDING FStilt Floor 0.0%
BUILDING FSlabs of Super Structure0.0%
BUILDING FInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUILDING FSanitary Fittings within the flats / premises0.0%
BUILDING FStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUILDING FExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUILDING FInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUILDING F1Excavation0.0%
BUILDING F1Basement (if any)0.0%
BUILDING F1Podiums (if any) 0.0%
BUILDING F1Plinth0.0%
BUILDING F1Stilt Floor 0.0%
BUILDING F1Slabs of Super Structure0.0%
BUILDING F1Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUILDING F1Sanitary Fittings within the flats / premises0.0%
BUILDING F1Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUILDING F1External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUILDING F1Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUILDING A WING A1Excavation0.0%
BUILDING A WING A1Basement (if any)0.0%
BUILDING A WING A1Podiums (if any) 0.0%
BUILDING A WING A1Plinth0.0%
BUILDING A WING A1Stilt Floor 0.0%
BUILDING A WING A1Slabs of Super Structure0.0%
BUILDING A WING A1Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUILDING A WING A1Sanitary Fittings within the flats / premises0.0%
BUILDING A WING A1Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUILDING A WING A1External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUILDING A WING A1Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUILDING A WING A2Excavation0.0%
BUILDING A WING A2Basement (if any)0.0%
BUILDING A WING A2Podiums (if any) 0.0%
BUILDING A WING A2Plinth0.0%
BUILDING A WING A2Stilt Floor 0.0%
BUILDING A WING A2Slabs of Super Structure0.0%
BUILDING A WING A2Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUILDING A WING A2Sanitary Fittings within the flats / premises0.0%
BUILDING A WING A2Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUILDING A WING A2External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUILDING A WING A2Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUILDING B WING B1Excavation0.0%
BUILDING B WING B1Basement (if any)0.0%
BUILDING B WING B1Podiums (if any) 0.0%
BUILDING B WING B1Plinth0.0%
BUILDING B WING B1Stilt Floor 0.0%
BUILDING B WING B1Slabs of Super Structure0.0%
BUILDING B WING B1Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUILDING B WING B1Sanitary Fittings within the flats / premises0.0%
BUILDING B WING B1Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUILDING B WING B1External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUILDING B WING B1Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUILDING B WING B2Excavation0.0%
BUILDING B WING B2Basement (if any)0.0%
BUILDING B WING B2Podiums (if any) 0.0%
BUILDING B WING B2Plinth0.0%
BUILDING B WING B2Stilt Floor 0.0%
BUILDING B WING B2Slabs of Super Structure0.0%
BUILDING B WING B2Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUILDING B WING B2Sanitary Fittings within the flats / premises0.0%
BUILDING B WING B2Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUILDING B WING B2External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUILDING B WING B2Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUILDING B WING B3Excavation0.0%
BUILDING B WING B3Basement (if any)0.0%
BUILDING B WING B3Podiums (if any) 0.0%
BUILDING B WING B3Plinth0.0%
BUILDING B WING B3Stilt Floor 0.0%
BUILDING B WING B3Slabs of Super Structure0.0%
BUILDING B WING B3Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUILDING B WING B3Sanitary Fittings within the flats / premises0.0%
BUILDING B WING B3Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUILDING B WING B3External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUILDING B WING B3Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUILDING CExcavation100.0%
BUILDING CBasement (if any)0.0%
BUILDING CPodiums (if any) 0.0%
BUILDING CPlinth0.0%
BUILDING CStilt Floor 0.0%
BUILDING CSlabs of Super Structure0.0%
BUILDING CInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUILDING CSanitary Fittings within the flats / premises0.0%
BUILDING CStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUILDING CExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUILDING CInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUILDING DExcavation100.0%
BUILDING DBasement (if any)0.0%
BUILDING DPodiums (if any) 0.0%
BUILDING DPlinth0.0%
BUILDING DStilt Floor 0.0%
BUILDING DSlabs of Super Structure0.0%
BUILDING DInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUILDING DSanitary Fittings within the flats / premises0.0%
BUILDING DStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUILDING DExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUILDING DInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 19 July 2026 · registration P52100080148

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹1,023,380,132₹0₹1,440,000,000₹2,463,380,132
Actual raised₹1,024,216,695₹0₹41,604,621₹1,065,821,316

MahaRERA project filing · read 19 July 2026 · registration P52100080148

Quarterly filing record

4 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 19 July 2026 · registration P52100080148

Documents named in the filing

  • Sanctioned layout plan · 1 listed
  • Sanctioned building plan · 5 listed
  • Title / search report · 7 listed
  • Form B — Promoter declaration · 1 listed
  • Promoter PAN · 2 listed
  • Commencement certificate · 1 listed
  • Occupancy / completion certificate · 2 listed
  • Form 1 — Architect's certificate · 1 listed
  • Form 3 — CA certificate · 1 listed
  • Form 2 — Engineer's certificate · 1 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100080148

Builder and past records

What else does the record show?

Projects registered under this company

Vrunda Skyscrapers

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

    Past records of sales and unsold homes

    1. 20 September 2026

      272 marked unsold · 82 sold · 101 booked.

      Saved MahaRERA home list

    2. 11 September 2026

      272 marked unsold · 82 sold · 101 booked.

      Saved MahaRERA home list

    3. 19 July 2026

      341 marked unsold · 53 sold · 61 booked.

      Saved MahaRERA home list

    4. 18 July 2026

      341 marked unsold · 53 sold · 61 booked.

      Saved MahaRERA home list, date based on the saved file

    These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

    More projects to explore

    Other projects in this locality.

    These projects list the same locality. They may differ in exact location, home type and price.

    Project Comparison Report

    Which project should you buy in?
    And which home?

    Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 12 July 2026

    MahaRERA · per-home inventory · read 11 September 2026

    This is a past RERA home list, not current availability. It does not give the date each home was sold.

    Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.