homeonpaper.

Builder’s RERA records,
explained for buyers.

The builder’s RERA record, explained

Lotus Florina

Lotus Florina · P52100080893

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For Lotus Florina (P52100080893), 86 of 98 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).

MahaRERA · per-home inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Inside this registered phase

How do the buildings compare in the record?

98 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
A Wing and B Wing9820861041.71–56.39 sq m≈ 449–607 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

98 listed entries

MahaRERA · per-home inventory · saved-file date 18 July 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
A-101A Wing and B Wing156.39 sq m≈ 607 sq ftMarked unsoldNot stated
A-102A Wing and B Wing156.39 sq m≈ 607 sq ftMarked unsoldNot stated
A-103A Wing and B Wing144.5 sq m≈ 479 sq ftMarked unsoldNot stated
A-104A Wing and B Wing142.55 sq m≈ 458 sq ftMarked unsoldNot stated
A-105A Wing and B Wing142.55 sq m≈ 458 sq ftMarked unsoldNot stated
A-106A Wing and B Wing142.55 sq m≈ 458 sq ftMarked unsoldNot stated
A-201A Wing and B Wing256.39 sq m≈ 607 sq ftMarked unsoldNot stated
A-202A Wing and B Wing256.39 sq m≈ 607 sq ftNot for saleNot stated
A-203A Wing and B Wing244.5 sq m≈ 479 sq ftMarked unsoldNot stated
A-204A Wing and B Wing242.55 sq m≈ 458 sq ftMarked unsoldNot stated
A-205A Wing and B Wing242.55 sq m≈ 458 sq ftMarked unsoldNot stated
A-206A Wing and B Wing242.55 sq m≈ 458 sq ftMarked unsoldNot stated

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹4,819,214 of an estimated ₹192,535,964 was reported as incurred (2.5%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 19 July 2026 · registration P52100080893

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
A Wing and B WingExcavation100.0%
A Wing and B WingBasement (if any)0.0%
A Wing and B WingPodiums (if any) 0.0%
A Wing and B WingPlinth100.0%
A Wing and B WingStilt Floor 0.0%
A Wing and B WingSlabs of Super Structure100.0%
A Wing and B WingInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80.0%
A Wing and B WingSanitary Fittings within the flats / premises60.0%
A Wing and B WingStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
A Wing and B WingExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70.0%
A Wing and B WingInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20.0%

MahaRERA project filing · read 19 July 2026 · registration P52100080893

Reported deadline extensions

Revised targetReason given by the builder
30 June 2026We apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to unforeseen circumstances, including procurement issues, financial constraints, and site challenges. Despite these setbacks, we are working diligently to address these issues and complete the remaining work. Given the circumstances, we kindly request an extension until 30-06-2026, to complete the project and fulfil all regulatory requirements.

MahaRERA project filing · read 19 July 2026 · registration P52100080893

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹58,320,785₹0₹213,283,142₹291,603,927
Actual raised₹10,000,000₹0₹0₹36,011,451

MahaRERA project filing · read 19 July 2026 · registration P52100080893

Quarterly filing record

4 elapsed quarterly periods in the captured compliance schedule. Active default was recorded for FY 2025-2026.

MahaRERA project filing · read 19 July 2026 · registration P52100080893

Documents named in the filing

  • Sanctioned layout plan · 4 listed
  • Sanctioned building plan · 12 listed
  • Title / search report · 4 listed
  • Form B — Promoter declaration · 4 listed
  • Promoter PAN · 12 listed
  • Commencement certificate · 40 listed
  • Occupancy / completion certificate · 16 listed
  • Form 1 — Architect's certificate · 4 listed
  • Form 3 — CA certificate · 4 listed
  • Form 2 — Engineer's certificate · 4 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100080893

Builder and past records

What else does the record show?

Projects registered under this company

Lotus Florina

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

    Past records of sales and unsold homes

    1. 20 September 2026

      86 marked unsold · 2 sold · 0 booked.

      Saved MahaRERA home list

    2. 11 September 2026

      86 marked unsold · 2 sold · 0 booked.

      Saved MahaRERA home list

    3. 19 July 2026

      86 marked unsold · 2 sold · 0 booked.

      Saved MahaRERA home list

    4. 18 July 2026

      86 marked unsold · 2 sold · 0 booked.

      Saved MahaRERA home list, date based on the saved file

    These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

    More projects to explore

    Other projects in this locality.

    These projects list the same locality. They may differ in exact location, home type and price.

    Project Comparison Report

    Which project should you buy in?
    And which home?

    Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 12 July 2026

    MahaRERA · per-home inventory · saved-file date 18 July 2026

    This is a past RERA home list, not current availability. It does not give the date each home was sold.

    The home-list date is based on the saved file’s details.

    Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

    Open MahaRERA · search P52100080893 ↗
    homeonpaper