For Godrej Aqua Vista (PM1260002500389), 1329 of 1582 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).
MahaRERA · per-home inventory · saved-file date 18 July 2026
For Godrej Aqua Vista, ₹11,431 per sq ft of carpet area is the median rate across 253 sold or booked entries with prices in the MahaRERA home list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.
MahaRERA · per-home inventory · saved-file date 18 July 2026
These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.
Builder’s completion target
The builder reported this target date. It is not a confirmed handover date.
Status shown on RERA
This is the status shown on RERA. It does not confirm an occupancy certificate or today’s construction progress.
Prices reported to RERA
₹11,431/ sq ft carpet area
Across 253 sold or booked entries with reported prices. The middle 80% of rates fall between ₹10,893 and ₹12,360.
MahaRERA · per-home inventory · saved-file date 18 July 2026
For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.
Sales Report
Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.
Inside this registered phase
1582 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.
MahaRERA · per-home inventory · saved-file date 18 July 2026
Scroll sideways to see all columns.
| Filed building | Entries | Sold | Booked | Marked unsold | Other / unstated status | Recorded carpet-area range |
|---|---|---|---|---|---|---|
| Tower 12 | 133 | 0 | 0 | 133 | 0 | 20.54–115.66 sq m≈ 221–1,245 sq ft |
| Tower 13 | 260 | 0 | 0 | 260 | 0 | 20.55–95.92 sq m≈ 221–1,032 sq ft |
| Tower 14 | 265 | 0 | 0 | 265 | 0 | 21.93–95.72 sq m≈ 236–1,030 sq ft |
| Tower 15 | 236 | 0 | 0 | 236 | 0 | 28.12–120.09 sq m≈ 303–1,293 sq ft |
| Tower 16 | 219 | 101 | 19 | 99 | 0 | 67.45–115.23 sq m≈ 726–1,240 sq ft |
| Tower 17 | 247 | 104 | 29 | 114 | 0 | 25.09–115.23 sq m≈ 270–1,240 sq ft |
| Tower 18 | 222 | 0 | 0 | 222 | 0 | 25.01–115.23 sq m≈ 269–1,240 sq ft |
Different sizes are not necessarily different bedroom types. How we read and summarise the filing →
Unit Report
Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.
Didn’t help you decide? Full refund — no questions asked.
The same home number may appear in more than one building. Check both before choosing.
MahaRERA · per-home inventory · saved-file date 18 July 2026
| Home / building | Floor in the record | Carpet area | Reported status | Agreement value | Assess |
|---|---|---|---|---|---|
| GAVT12010201Tower 12 | 1 | 36.44 sq m≈ 392 sq ft | Marked unsold | Not stated | |
| GAVT12010202Tower 12 | 1 | 24.89 sq m≈ 268 sq ft | Marked unsold | Not stated | |
| GAVT12010203Tower 12 | 1 | 24.88 sq m≈ 268 sq ft | Marked unsold | Not stated | |
| GAVT12010204Tower 12 | 1 | 31.92 sq m≈ 344 sq ft | Marked unsold | Not stated | |
| GAVT12010205Tower 12 | 1 | 40.28 sq m≈ 434 sq ft | Marked unsold | Not stated | |
| GAVT12010206Tower 12 | 1 | 34.41 sq m≈ 370 sq ft | Marked unsold | Not stated | |
| GAVT12010207Tower 12 | 1 | 34.85 sq m≈ 375 sq ft | Marked unsold | Not stated | |
| GAVT12010208Tower 12 | 1 | 28.75 sq m≈ 309 sq ft | Marked unsold | Not stated | |
| GAVT12010209Tower 12 | 1 | 50.79 sq m≈ 547 sq ft | Marked unsold | Not stated | |
| GAVT12010210Tower 12 | 1 | 28.49 sq m≈ 307 sq ft | Marked unsold | Not stated | |
| GAVT12010211Tower 12 | 1 | 30.07 sq m≈ 324 sq ft | Marked unsold | Not stated | |
| GAVT12010212Tower 12 | 1 | 29.03 sq m≈ 312 sq ft | Marked unsold | Not stated |
Read every entry in one table: Read the complete saved home list.
Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.
More from the RERA documents
₹359,480,303 of an estimated ₹7,191,559,300 was reported as incurred (5.0%). This percentage is about costs. It does not show how much construction is complete.
MahaRERA project filing · read 19 July 2026 · registration PM1260002500389
Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.
| Building | Activity | Reported |
|---|---|---|
| Tower 12 | Excavation | 0.0% |
| Tower 12 | Basement (if any) | 0.0% |
| Tower 12 | Podiums (if any) | 0.0% |
| Tower 12 | Plinth | 0.0% |
| Tower 12 | Stilt Floor | 0.0% |
| Tower 12 | Slabs of Super Structure | 0.0% |
| Tower 12 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| Tower 12 | Sanitary Fittings within the flats / premises | 0.0% |
| Tower 12 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| Tower 12 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| Tower 12 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| Tower 13 | Excavation | 0.0% |
| Tower 13 | Basement (if any) | 0.0% |
| Tower 13 | Podiums (if any) | 0.0% |
| Tower 13 | Plinth | 0.0% |
| Tower 13 | Stilt Floor | 0.0% |
| Tower 13 | Slabs of Super Structure | 0.0% |
| Tower 13 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| Tower 13 | Sanitary Fittings within the flats / premises | 0.0% |
| Tower 13 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| Tower 13 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| Tower 13 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| Tower 14 | Excavation | 0.0% |
| Tower 14 | Basement (if any) | 0.0% |
| Tower 14 | Podiums (if any) | 0.0% |
| Tower 14 | Plinth | 0.0% |
| Tower 14 | Stilt Floor | 0.0% |
| Tower 14 | Slabs of Super Structure | 0.0% |
| Tower 14 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| Tower 14 | Sanitary Fittings within the flats / premises | 0.0% |
| Tower 14 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| Tower 14 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| Tower 14 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| Tower 15 | Excavation | 0.0% |
| Tower 15 | Basement (if any) | 0.0% |
| Tower 15 | Podiums (if any) | 0.0% |
| Tower 15 | Plinth | 0.0% |
| Tower 15 | Stilt Floor | 0.0% |
| Tower 15 | Slabs of Super Structure | 0.0% |
| Tower 15 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| Tower 15 | Sanitary Fittings within the flats / premises | 0.0% |
| Tower 15 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| Tower 15 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| Tower 15 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| Tower 16 | Excavation | 100.0% |
| Tower 16 | Basement (if any) | 0.0% |
| Tower 16 | Podiums (if any) | 0.0% |
| Tower 16 | Plinth | 50.0% |
| Tower 16 | Stilt Floor | 0.0% |
| Tower 16 | Slabs of Super Structure | 0.0% |
| Tower 16 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| Tower 16 | Sanitary Fittings within the flats / premises | 0.0% |
| Tower 16 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| Tower 16 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| Tower 16 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| Tower 17 | Excavation | 100.0% |
| Tower 17 | Basement (if any) | 0.0% |
| Tower 17 | Podiums (if any) | 0.0% |
| Tower 17 | Plinth | 20.0% |
| Tower 17 | Stilt Floor | 0.0% |
| Tower 17 | Slabs of Super Structure | 0.0% |
| Tower 17 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| Tower 17 | Sanitary Fittings within the flats / premises | 0.0% |
| Tower 17 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| Tower 17 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| Tower 17 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| Tower 18 | Excavation | 100.0% |
| Tower 18 | Basement (if any) | 0.0% |
| Tower 18 | Podiums (if any) | 0.0% |
| Tower 18 | Plinth | 0.0% |
| Tower 18 | Stilt Floor | 0.0% |
| Tower 18 | Slabs of Super Structure | 0.0% |
| Tower 18 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| Tower 18 | Sanitary Fittings within the flats / premises | 0.0% |
| Tower 18 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| Tower 18 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| Tower 18 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
MahaRERA project filing · read 19 July 2026 · registration PM1260002500389
RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.
| Filing | Own funds | Borrowing | Payments from buyers | Total |
|---|---|---|---|---|
| Estimated plan | ₹2,149,580,024 | ₹0 | ₹7,253,452,579 | ₹9,403,032,603 |
| Actual raised | ₹1,567,960,473 | ₹0 | ₹429,895,678 | ₹1,997,856,151 |
MahaRERA project filing · read 19 July 2026 · registration PM1260002500389
3 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.
MahaRERA project filing · read 19 July 2026 · registration PM1260002500389
A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.
MahaRERA project filing · read 19 July 2026 · registration PM1260002500389
Builder and past records
Projects registered under this company
1Pune registrations
These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.
MahaRERA Pune registration records · read 12 July 2026
Past records of sales and unsold homes
20 September 2026
1329 marked unsold · 205 sold · 48 booked.
Saved MahaRERA home list
11 September 2026
1329 marked unsold · 205 sold · 48 booked.
Saved MahaRERA home list
19 July 2026
1329 marked unsold · 205 sold · 48 booked.
Saved MahaRERA home list
18 July 2026
1329 marked unsold · 205 sold · 48 booked.
Saved MahaRERA home list, date based on the saved file
These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.
Project Comparison Report
Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.
2 projects · ₹7,999
3 projects · ₹9,999
Within 1 working day
Didn’t help you decide? Full refund — no questions asked.
Compare project details for free →MahaRERA · registration record · read 12 July 2026
MahaRERA · per-home inventory · saved-file date 18 July 2026
This is a past RERA home list, not current availability. It does not give the date each home was sold.
The home-list date is based on the saved file’s details.
Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.